Re-Construction Of Damaged Structural Steel Stair Earthwork Excavation In Ordinary Soil For Foundation And Depositing The Spoiled Earth Within Initial Lead Up To 50M And Lift Upon 1.50 M Refilling After The Work Etc. Complete As Per Standard Specification. 2 2 Re-Construction Of Damaged Structural Steel Stair Cement Concrete 1:5:10 Using 40Mm And Down Grade Stone Aggregate For Column Base, After Leveling, Watering And Consolidating The Base Including All Cost Conveyance Of Materials, Loading & Un Loading Charges, Hire Charges For Tools And Plants, Hire And Labour For Shuttering, All Labour Charges For Boxing Mixing, Laying, Ramming, Curing Etc. Complete As Per Standard Specification But Excluding Cost Of Cement. 3 3 Re-Construction Of Damaged Structural Steel Stair Reinforced Cement Concrete 1:2:4 Using 20Mm Hard Broken Stone For Column Base, Footings, Column, Tie Beam, Step & Roof Slab Etc. Including Cost & Conveyance Of All Materials Hire Charges For Shuttering, Labour Charges For Boxing, Mixing, Placing, Ramming, Watering, Curing Etc. Complete As Per Standard Specification But Excluding Cost Of Cement & Ms Reinforcement. 4 4 Re-Construction Of Damaged Structural Steel Stair Ms Reinforcement Bent , Tied And Placed In Position For All Rcc Works Including All Cost And Conveyance Of Ms Bars, Binding Wires, All Labour Charges, Loading / Unloading Charges Etc. Complete As Per Standard Specification. 5 5 Re-Construction Of Damaged Structural Steel Stair Brick Work In Cm 1:6 Using First Class Wire Cut Bricks Of Standard Size Including All Cost And Conveyance Of Materials, All Labour Charges Hire Charges For All Tools And Plants, Providing Necessary Scaffolding With Contractors Materials, Watering Curing, Etc. Complete As Per Standard Specification But Excluding Cost Of Cement 6 6 Re-Construction Of Damaged Structural Steel Stair Plastering In Cement Mortar 1:4, 15Mm Thick One Coat At All Height And Levels Floated Hard And Trowelled Smooth Including All Cost And Conveyance Of Materials, All Labour Charges Hire Charges For Tools And Plants, Providing Necessary Scaffolding With Contractors Materials Curing, Etc. Complete As Per Standard Specification But Excluding Cost Of Cement 7 7 Re-Construction Of Damaged Structural Steel Stair Supply, Fabrication, And Erection Of Steel Frame Work For Hand Rail By Using Good Quality Gi Pipe 2 Mm Thick ( Gi 14 Gauge ) Gi Round Pipe ( Tata Make ) Or Equivalent Etc. By Welded Or Bolted In Positions ( As Per The Drawing ) And Closed The Open Ends Of Each Sections Including Cleaning And Applying One Coat Of Epoxy Primer And Two Coat Of Epoxy Paint Etc. 8 8 Re-Construction Of Damaged Structural Steel Stair Supplying , Fabrication & Fixing Aluminium Glazed 3 Paneled Super Sliding Windows Using Powder Coated Aluminimum Section Of 20 Series 3 Track ( Wall Thickness Minimum 1.5Mm Or Nearest ) , Including All Accessories Like Locking Arrangements At Sides, Epdm Type Beadings, Screws Clip, Window Handle Etc. And Paneled With 6 Mm Thick Plane Float Glass Etc. Including All Cost And Conveyance Of Materials, Etc., 9 9 Re-Construction Of Damaged Structural Steel Stair Painting The Wall With Approved Quality And Colour Water Proof Paint One Coat Wall Primer And Two Coats Of Exterior Emulsion At All Heights And Levels Including All Cost And Conveyance Of Materials, All Labour Charges, Hire Charges For Tools And Plants, Providing Scaffolding With Contractors Materials Etc. Complete As Per Standard Specification. 10 10 Re-Construction Of Damaged Structural Steel Stair Sundry And Petty Works Such As Dismantling The Existing Damaged Circular Stair & Clearing. Skilled Labour 11 11 Re-Construction Of Damaged Structural Steel Stair Supplying And Stacking Isi Mark Best Quality Portland Cement ( Opc / Ppc ) In Paper Bag Approved Make Including All Cost And Conveyance Of Materials, Loading And Unloading Charges Etc. Complete ( Payment Will Be Made Only For Actual Quantity Of Cement Consumed )