}

Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle , Mould Baking Kiln ----One Complete Unit A. Fuel----- Png B. Type-----Down Draft C. Working Temp------1100°C D. Burner-------- Two Units With One Air Single Phase Electric Blower. E. Loading S, delhi-Delhi

Government College-GC has published Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle , Mould Baking Kiln ----One Complete Unit A. Fuel----- Png B. Type-----Down Draft C. Working Temp------1100°C D. Burner-------- Two Units With One Air Single Phase Electric Blower. E. Loading S. Submission Date for this Tender is 21-09-2022. Kitchen Equipment Tenders in delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

33658566
Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle , Mould Baking Kiln ----One Complete Unit A. Fuel----- Png B. Type-----Down Draft C. Working Temp------1100°C D. Burner-------- Two Units With One Air Single Phase Electric Blower. E. Loading S
Open Tender
Indian
Delhi
delhi
21-09-2022

Tender Details

Supply Of Mold Baking Kiln, Metal Melting Furnace And Ladle , Mould Baking Kiln ----One Complete Unit A. Fuel----- Png B. Type-----Down Draft C. Working Temp------1100°C D. Burner-------- Two Units With One Air Single Phase Electric Blower. E. Loading Space-----Depth 7 X Width 6 X Height6 F. Trolley Size ------Length 6 X Width 56’’. G. Trolley Movement -----Automatic H. Trolley Wheels 4Nos. -----4 To 6 Dia.In Iron. Strong Enough To Bear The Weight Of Trolley And Load Of Approximate 4 To 5 Tons. I. Base Of Trolley- Insulation Bricks & Fire Brick, Fixing With Fire Cement. J. Kiln Body =. Five Sides ( Including Furnace Shutter / Gate And Top Roof ) High Density Fiber Wool No.1425 ( Moreguppa Brand ) Furnace Frame = Angle Iron 70Mm X 70Mm X 6Mm Thick. Supported By M S Flat 70Mm X 6Mm Thick, Fire Cement , I Channel 6 X 3 X 5 To 6 Mm Thick , Covering From All Five Sides 4Mm Thick M S Sheet With Nuts And Bolts Welding . K. Chimney Design As Per Requirement, Height 2 Feet More Than Present Roof Height. L. Rail Track = Rail Track Length = 13 Feets ( 6Feet Inside The Furnace And 7 Feets Outside The Furnace. , Metal Melting Furnace ----One Complete Unit A. Fuel. ---+---------+------- Png B. Melting Capacity. ----2Ookg C. Working Temp. -------1400°C D. Fire Bricks, End Arc, With 70% Alumina E. Fire Cement ( Acc ) F. Png Burner Unit With All Accessories- Single Stage- 1Unit G. Hydraulic Tilting , Ladle A. Manual Ladle 100 Kg. ( 2 Units With Handle ) B. Ladle Pre-Heater Gas Burner Operated. C. Including Blower And Stand.

Key Value

Document Fees
Refer document
EMD
INR 30000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: SUPPLY OF Mold Baking Kiln, Metal Melting Furnace and LadleFOR THE COLLEGE OF ART
Sl. No. Item Description
1Mould baking Kiln ----one complete unit a. Fuel----- PNG b. Type-----Down draft c. Working Temp------1100°C d. Burner-------- Two units with one air single phase electric blower. e. Loading space-----depth 7" x width 6" x height6" f. Trolley Size ------length 6" x width 5"6’’. g. Trolley movement -----Automatic h. Trolley wheels 4nos. -----4" to 6" Dia.in Iron. Strong enough to bear the Weight of trolley and load of approximate 4 To 5 Tons. i. Base of trolley- Insulation bricks & Fire Brick, fixing with fire cement. j. Kiln body =. Five Sides (including Furnace shutter/ Gate and top roof) High density Fiber Wool no.1425 (Moreguppa Brand) Furnace Frame = Angle iron 70mm x 70mm x 6mm thick. Supported by M S flat 70mm x 6mm thick, Fire cement , I channel 6" x 3" x 5 to 6 mm thick , covering from All five sides 4mm thick M S Sheet with nuts and bolts welding . k. Chimney design as per requirement, height 2 feet more than present roof Height. l. Rail track = Rail track length = 13 feet"s (6feet inside the furnace and 7 Feet"s outside the furnace.
2Metal melting furnace ----one complete unit a. Fuel. ---+---------+------- PNG b. Melting Capacity. ----2OOkg c. Working Temp. -------1400°C d. Fire bricks, End arc, with 70% Alumina e. Fire cement (ACC) f. PNG Burner unit with all accessories- Single stage- 1unit g. Hydraulic tilting
3Ladle a. Manual Ladle 100 kg. (2 Units with handle) b. Ladle pre-heater gas burner operated. c. Including blower and stand.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail