}

Repairs To Vehicle Tata Mobile 207Di Ba No 11C089394k Repairs To Vehicle Tata Mobile 207Di Ba No 11C089393m Repairs To Vehicle Ba No 11D194986p Eicher 1075 And Repairs Of Vehicle Motor Cycle Hero Honda Ba No 12A 062720W => Limited, Visakhapatanam-Andhra Pradesh

Military Engineer Services-MES has published Repairs To Vehicle Tata Mobile 207Di Ba No 11C089394k Repairs To Vehicle Tata Mobile 207Di Ba No 11C089393m Repairs To Vehicle Ba No 11D194986p Eicher 1075 And Repairs Of Vehicle Motor Cycle Hero Honda Ba No 12A 062720W => Limited. Submission Date for this Tender is 30-08-2022. Vehicle Maintenance Service Tenders in Visakhapatanam Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

33652997
Repairs To Vehicle Tata Mobile 207Di Ba No 11C089394k Repairs To Vehicle Tata Mobile 207Di Ba No 11C089393m Repairs To Vehicle Ba No 11D194986p Eicher 1075 And Repairs Of Vehicle Motor Cycle Hero Honda Ba No 12A 062720W => Limited
Limitted
Indian
Andhra Pradesh
Visakhapatanam
30-08-2022

Tender Details

Repairs To Vehicle Tata Mobile 207Di Ba No 11C089394k Repairs To Vehicle Tata Mobile 207Di Ba No 11C089393m Repairs To Vehicle Ba No 11D194986p Eicher 1075 And Repairs Of Vehicle Motor Cycle Hero Honda Ba No 12A 062720W => Limited

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: REPAIRS TO VEHICLE TATA MOBILE 207DIBA NO: 11C-089394K, REPAIRS TO VEHICLE TATA MOBILE 207DIBA NO 11C-089393M,REPAIRS TO VEHICLE EICHER 10.75 BA NO 11 D 184986P AND REPAIRS TO VEHICLE MOTOR CYCLEHERO HONDABA NO 12A062720W
Sl. No. Item Description
1REPAIRS TO VEHICLE TATA MOBILE 207DIBA NO 11C-089394K
2(i)Dismantling the alternator from Enginecompletely and supply and fix inreplacement rectifier 12 volt Qty- 01 Nos , diodes , ball bearings bushes and Armature with new and Fixing back the Dynamo Alternator assembly completely and reaffixing withengine withnecessary electrical connection etc.
3(ii) Draining and taking out diesel tank assembly alongwith fuel pump and inserting hose and pouring a stream of clean hot water and with detergent by dispersing the product over the entire side surface by shaking and swirling. - 01 Job Complete.
4(iii) Supply and fix in repair old damaged broken and choked up oil filter with new one qty - 01 Nos- 01 Job complete.
5(iv) Supply and fixing glass bedding for all doors with new bedding -01 Job complete.
6(v) Driain out gear box oil 03 ltr form the plug hole and topping up with new gear oil 03 ltrs - 01 Job Complete.
7(vi)Repair replacement of door lock assembly with door lock actuator to the latch and from the latch to the knob - 01 Job Complete.
8(vii) Checking of Specifiec gravity & level of Electrolyte, Topping up checking the tightness of the Terminal -01 Job Complete
9(viii) Supply and fixing in repair new mechanical Machine for glass Assembly Qty-02 Nos . 01 Job Complete
10(ix) Supply and fixing in repair Indication Lamp Assembly suitable for Tata Mobile207Qty- 02 Nos .01 Job Complete
11(x)Supply and fixin repairglass beading for rear and front doors.01 Job Complete
12(xi)Taking down front wheel hub and replacing the unserviceableparts and fixing back the same with proper alignment with greasing- 01 Job Complete.
13(xii) Dismantling the gear box completely and deassembling the same and replacing the unserviceable parts with the new pinions and gear levers, bush bearing O rings packing and nut bolt and alignment and reaffixing with Engine base completely - 01 Job Complete
14(xiii) Overhauling of the complete break Assembly and replacing break pad and springs, break disc with necessary machining and making alignment for smooth functioning of the break system01 Job complete
15(xiv) Cleaning of complete internal surface with necessary cleaning agent - 01 Job Complete.
16(xv) Supply and fixingin repairbulb with necessary holders and necessary new wirings etc. 01 Job Complete.
17(xvi) Opening and servicing of the FIP with nozzles along with fuel line from engine chamber and from the fuel tank at the Rear and cleaning with polyether Amine for removing the solidifed deposit and fixing it back with proper arrangement alongwith fuel injetor- 01 Job complete
18(xvii) Taking down front suspension and repair/replacement to the suspension assembly including tie rod arms, idler arms, rack and pinion ball joints with new one -01 Job Complete
19(xviii) Water Servicing 01 Job complete
20REPAIRS TO VEHICLE TATA MOBILE 207DIBA NO 11C-089393M
21(i) Opening and servicing of the FIP with nozzles along with fuel line from engine chamber and from the fuel tank at the Rear and cleaning with polyether Amine for removing the solidifed deposit and fixing it back with proper arrangement alongwith fuel injetor- 01 Job complete
22(ii) Draining and taking out diesel tank assembly alongwith fuel pump and inserting hose and pouring a stream of clean hot water and with detergent by dispersing the product over the entire side surface by shaking and swirling. - 01 Job Complete.
23(iii)Taking down and replacement of the prop shaft Cross two joint from the rear Axle Drive and the transfer Case front Drive Axle - 01 Job Complete
24(iv) Taking down front suspension and repair/replacement to the suspension assembly including tie rod arms, idler arms, rack and pinion ball joints with new one -01 Job Complete
25(v) Driain out gear box oil 03 ltr form the plug hole and topping up with new gear oil 03 ltrs - 01 Job Complete.
26(vi)Repair replacement of door lock assembly with door lock actuator to the latch and from the latch to the knob - 01 Job Complete.
27(vii) Checking of Specifiec gravity & level of Electrolyte, Topping up checking the tightness of the Terminal -01 Job Complete
28(viii) Supply and fixing in repair new mechanical Machine for glass Assembly Qty-02 Nos . 01 Job Complete
29(ix) Supply and fixing in repair Indication Lamp Assembly suitable for TATA MOBILE207Qty- 02 Nos .01 Job Complete
30(x)Supply and fixin repairglass beading for rear and front doors.01 Job Complete
31(xi)Taking down front wheel hub and replacing the unserviceableparts and fixing back the same with proper alignment with greasing- 01 Job Complete.
32(xii) Dismantling the front side suspension complete, removing out the unserviceable Brass bushes from Body and supply and fixing in repair brass bushes ofsuitable size ,with necessary foundry work and refixing the all dismantled Items andneccessaryalignment etc- 01 Job Complete
33(xiii) Overhauling of the complete break Assembly and replacing break pad and springs, break disc with necessary machining and making alignment for smooth functioning of the break system01 Job complete
34(xiv) Cleaning of complete internal surface with necessary cleaning agent - 01 Job Complete.
35(xv) Supply and fixingin repairbulb with necessary holders and necessary new wirings etc. 01 Job Complete.
36(xvi)Dismantling the alternator from Enginecompletely and supply and fix inreplacement rectifier 12 volt Qty- 01 Nos , diodes , ball bearings bushes and Armature with new and Fixing back the Dynamo Alternator assembly completely and reaffixing withengine withnecessary electrical connection etc.
37(xvii) Supply and fixing in repairnew seat covers for all seats for front and rear side . 01 Job Complete
38(xviii) Water Servicing 01 Job complete
39REPAIRS TO VEHICLE EICHER 10.75 BA NO 11 D 184986P
40(i) Repair and re conditioning of self starter including Dismantling from Engine and dismantling the unserviceable bushes,bearings,carbon brushes solenoid switches including,Aluminium Body ,Armature , varnishing, greasing and re assembling, the self starter and reaffixing back the self motor and fixing back completely.01 Job Complete
41(ii) Draining out of oldGear oil from Gear Box and Topping up with new Gear oil 80W/90 Qty-03 ltrs. 01 Job Complete
42(iii) Draining out ofoldDifferential Oil from Differential Chamber and Topping up with the new Differential oil Qty-01 ltrs. 01 Job Complete
43(iv) Draining out ofold Coolant water mixture from Radiator and filling Mixture of Coolant and water in Radiator in Complete Qty-05 ltr 01 Job Complete
44(v) Supply and Fix in repair of old damaged ,Broken and Choke up Fuel Filter with new one Qty-01 No01 Job Complete
45(vi)Supply and Fix in repair old damaged ,Broken and Choke up Oil Filter with new one Qty-01 Nos 01 Job Complete
46(vii) Draining out ofold Engine oil from EngineChamber and Topping upwith new Engine oil 20W/40.Qty- 05 ltrs01 Job Complete
47(viii) Dismantling the alternator from Enginecompletely and supply and fix inreplacement rectifier 12 volt Qty- 01 Nos , diodes , ball bearings bushes and Armature with new and Fixing back the Dynamo Alternator assembly completely and reaffixing with engine withnecessary electrical connection etc. 01 Job Complete.
48(ix)Wheel Alignment and balancing of wheels complete- 01 Job Complete.
49(x) Dismantling the fuel Tank from chasiscompletely and removing out the corroded parts of Tank with necesary welding and brazing work etc including the cleaning of the tank Completely with chemical and reaffixing the Tank and supply and fixing in repairnecessary clamps, nut bolt for fixing thehose pipeComplete etc. 01 Job Complete
50(xi)Repairs to body with welding, tinkering, denting and painting of the vehicle ( Sheet metal body and chasis Frame-01 Job Complete.
51(xii)Taking down front wheel hub and replacing the unserviceable parts fixing back the same - 01 Job Complete
52(xiii)Taking down wind screen assembly, opening and cleaning for carry out repair and replacement of following unserviceable items all as specified and directed by Engineer-in-Charge (Wiper Blade-Set 01, wiper motor -01 Set
53(xiv) Repair to exhaust manifold assembly with repair to silencer assembly - 01 Job Complete
54(xv) Repairs to cabin door both left and right with locking arrangement welding to hinges of door - 01 Job complete
55(xvi) Taking down suspension assembly for overhauling (Front and Rear) cleaning servicing, greasing complete and refixing - 01 Job complete
56(xvii) Water servicing of vehicle after carrying out the all repairs works.
57REPAIRS TOMOTOR CYCLEBA NO 12A 062720W
58(i)Opening and draing out the engine oil from engine chamber and refiling with new engine oil 01 Liters 20W/40 Complete..
59(ii) Replacement of brake cables (front and rear), clutch cables, throttle cable assembly with new cables- 01 Job Complete.
60(iii) Removal of carburetor with overhauling and refixing back to its position..
61(iv)Replacement of broken Buzzer indicators with new buzzer indicators -01 Job complete.
62(v) Repair/Replacement of following spares parts necessary for smooth functioning of Vehicle (a) Side view mirror,(ii) Side stand (iii) Leg Guard (iv) Side panel set (v) Rider front rest (vi) Pillion foot rest (iv) Mudguard Front and rear (n) Cylinder Kit (m) Wheel Rim rear and front (n) Looking mirrors
63(vi)Repair replacement of brake shoe and break drum rubber for break assembly- 01 Job Complete.
64(vii) Replacement of clutch assembly - 01 Job complete.
65(viii) Water Servicing 01 Job complete
66(ix) Services charges including oiling and greasing
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail