| 1 | Supply, Installation, testing and commissioning of Oxygen manifold of 6+6 Cylinders with Fully Automatic Control Panel for the Oxygen Manifold SystemThe Oxygen Manifold should be hydraullicaly tested at 3500 psig pressure. The Oxygen Manifold shall be complete with all accessories etc as required complete as per specifications |
| 2 | Supply, Installation, testing and commissioning of terminal outlets of Oxygen with Adapter complete as per specification. |
| 3 | Wall Outlets Oxygen |
| 4 | Supplying, Installation, Testing & Commissioning of Probes for wall Outlets for fitting of humidifier Bottles etcas required complete in all respect. |
| 5 | Supply, Installation, testing and commissioning of Oxygen Flowmeter with Humidifier with adapter, tubing etc. The humidifier bottle shall be made of unbreakable & reusable polycarbonate material .The oxygen flowmeter with humidifier shall be complete with all the required accessories and shall be complete as per specifications |
| 6 | Oxygen Flow meter With Humidifier Bottle |
| 7 | Supply, Installation, testing and commissioning of Main Alarm Panel to indicate any abnormality of gas pressures and other failures of the system. The alarm syatem shall be complete with digital display, sensor module and power supply. The alarm system shall be complete with all indications controls, wirings, accessories etc. complete as required and as per specifications. |
| 8 | Supply, Installation, testing and commissioning of Area Alarms for areas shall be complete with pressure sensors, indications, alarms etc. and with all accessories as per specifications. |
| 9 | 1 gas Alarm Service(02) |
| 10 | Supply, Installation, testing and commissioning of Isolation Valves of different sizes suitable for the pipe dia. The valves shall be non-lubricated type, stainless hard chrome brass with PTFE seat having opening by quarter turn of handly. The valves shall be pneumatically tested and degreased for medical gas service complete as per specifications. |
| 11 | 15mm |
| 12 | 22mm |
| 13 | Supply, Installation, testing and commissioning of Valve Box complete with Isolation Valves of different sizes complete with all accessories as required as per specifications |
| 14 | Valve Box |
| 15 | Supplying, Installation testing and commissiong ofSingle Arm CeilingPandent Aneasthesiawith Single over head suspension Vertical one arm system for OT gas terminal outletsas reqiured complete in all respect. |
| 16 | Supply, Installation, testing and commissioning of Copper piping of different sizes for distribution and supply of O2to various areas in the hopsital. The Copper pipes shall be solid drawn, seamless, deoxidised, nonarsenical, half hard, tempered and degreased material . After installation the pipes shall be painted with 2-coats of synthetic enamel paint and colour cutting walls, making sheathing/groove/channel etc as required and making good the surface to complete the work in all respect. as requied at site |
| 17 | O.D. 22mm x 0.9mm thick |
| 18 | O.D. 15mm x 0.9mm thick |
| 19 | O.D. 12mm x 0.7mm thick |