| 1 | Items to be Supplied and Commissioned by IWUMS SI |
| 2 | Design, Supply, Installation, Programming, Testing and Commissioningof PLC/RTU based Floor Mounted Control Panel suitable for Control andMonitoring ofPumps( 02 Nos centrifugal pumps,02 Nos Submersible Pumps) 06 Nos Motorised Valves,01 No Ultrasonic Level Transmitters, 06 Nos Pressure Transmitters,01 No Flow meters,analytical transmitters (Chlorination, Residual Chlorine, TDS) including all pipe fittings, hardwares, Gaskets, fasteners, cables, flanges, acccessories as required with UPS(500VA) with Battery Backup, SPD including three phase automatic phase corrector and chemical earthing for SCADA |
| 3 | Design, Supply, Installation, Programming, Testing and Commissioningof PLC/RTU based Floor Mounted Control Panel suitable for Control andMonitoring of1 No Tube well, 01 No OHT, 02 Nos Motorised valves 01 No Ultrasonic Level Transmitter, 01 Nos Flow switches, 02 Nos Pressure Transmitters, 02 Nos Flow meters,analytical transmitters (Chlorination, Residual Chlorine, TDS)including all pipe fittings, hardwares, Gaskets, fasteners, cables, flanges, acccessories as required UPS(500VA) with Battery Backup, SPD including chemical earthing for SCADA including three phase automatic phase corrector and chemical earthing for SCADA |
| 4 | Design, Supply, Installation, Programming, Testing and Commissioningof PLC/RTU based Floor Mounted Control Panel suitable for Control andMonitoring of1 No Tube well, 02 Nos Motorised Valves, 01 Nos Flow switches, 02 Nos Pressure Transmitters, 02 Nos Flow meters,analytical transmitters (Chlorination)including all pipe fittings, hardwares, Gaskets, fasteners, cables, flanges, acccessories as required UPS(500VA) with Battery Backup, SPD including chemical earthing for SCADA including three phase automatic phase corrector and chemical earthing for SCADA |
| 5 | Supply, install, testing and commissioning of SCADA compatible, fully automatic soft starter with Amp rating given below: with bypass contactor AC 3 duty separate switching timed capacitor with time delay of not less than 10 sec housed in 16/14 SWG CRCA powered coated enclosure:-Design, Supply, Installation, Programming, Testing and Commissioningof Fully Automatic Soft Starter Panel 30 Amp for 15 HP with suitable modbus energy meter |
| 6 | Design, Supply, Installation, Programming, Testing and Commissioningof Fully Automatic Soft Starter Panel 50 Amp for 25 HP with suitable modbus energy meter including hardwares, Gaskets, fasteners, cables, acccessories as required |
| 7 | Design, Supply, Installation, Programming, Testing and Commissioningof Fully Automatic Soft Starter Panel (30 HP Starter)-60 Amp with suitable modbus energy meter including hardwares, Gaskets, fasteners, cables, acccessories as required |
| 8 | Design, Supply, Installation, Programming, Testing and Commissioningof Fully Automatic Soft Starter Panel (35 HP Starter)-65 Amp with suitable modbus energy meter including hardwares, Gaskets, fasteners, cables, acccessories as required |
| 9 | Design, Supply, Installation, Programming, Testing and Commissioningof Fully Automatic Soft Starter Panel for Booster Station (30 HP Starter)-60 Amp with suitable modbus energy meterincluding hardwares, Gaskets, fasteners, cables, acccessories as required |
| 10 | Design, Supply, Installation, Programming, Testing and Commissioningof Fully Automatic Soft Starter Panel for Booster Station (125 HP Starter)-240 Amp with suitable modbus energy meterincluding hardwares, Gaskets, fasteners, cables, acccessories as required |
| 11 | Design, Supply, Installation, Programming, Testing and Commissioningof Fully Automatic Soft Starter Panel for Booster Station (60 HP Starter)-115 Amp with suitable modbus energy meter including hardwares, Gaskets, fasteners, cables, acccessories as required |
| 12 | Design, Supply, Installation, Testing of full bore Electromagnetic flow meter and interfacing with PLC/RTU panel (dia 100mm) , including all pipe fittings, hardwares, Gaskets, fasteners, cables, flanges, acccessories as required |
| 13 | Design, Supply, Installation, Testing of full bore Electromagnetic flow meter and interfacing with PLC/RTU panel (dia 150mm) , including all pipe fittings, hardwares, Gaskets, fasteners, cables, flanges, acccessories as required |
| 14 | Design, Supply, Installation, Testing of full bore Electromagnetic flow meter and interfacing with PLC/RTU panel (dia 200mm) , including all pipe fittings, hardwares, Gaskets, fasteners, cables, flanges, acccessories as required |
| 15 | Design, Supply, Installation, Testing of full bore Electromagnetic flow meter and interfacing with PLC/RTU panel (dia 250mm) , including all pipe fittings, hardwares, Gaskets, fasteners, cables, flanges, acccessories as required |
| 16 | Design, Supply, Installation, Testing of full bore Electromagnetic flow meter and interfacing with PLC/RTU panel (dia 300mm) , including all pipe fittings, hardwares, Gaskets, fasteners, cables, flanges, acccessories as required |
| 17 | Design, Supply, Installation, Testing and Commissioning of Pressure Transmitter and Interfacing with PLC/RTU panel including all pipe fittings, hardwares, Gaskets, fasteners, cables, flanges, acccessories as required |
| 18 | Design, Supply, Installation, Testing and Commissioning of TDS sensor with Transmitter and Interfacing with PLC/RTU panel along with mounting in suitable CRCA powder coated Panel and internal PVC piping |
| 19 | Design, Supply, Installation, Testing and Commissioning of Liquid Chlorine with pH Compensation and pH output Dosing System with and Interfacing with PLC/RTU panel along with mounting in suitable CRCA powder coated Panel and internal PVC piping |
| 20 | Design, Supply, Installation, Testing and Commissioning of Residual Chlorine Transmitter and Interfacing with PLC/RTU panel along with mounting in suitable CRCA powder coated Panel and internal PVC piping |
| 21 | Supply, Installation, Programming, Testing and Commissioningof Single SIM GPRS/ OFC / WiFi communication Gateway to be installed in PLC/RTU Panels as required |
| 22 | Design, Supply, Installation, Testing and Commissioning of Ultrasonic Level TransmitterInterfacing with Local PLC/RTU panelfor OHT/UGR |
| 23 | Design Supply, Installation Testing & Commissioning of Motor Actuator for Butterfly Valve consisiting of Quarter turn single phase Actuator and withsplash proof enclosure (100 mm dia) |
| 24 | Design Supply, Installation Testing & Commissioning of Motor Actuator for Butterfly Valve consisiting of Quarter turn single phase Actuator and withsplash proof enclosure. (150 mm dia.) |
| 25 | Design Supply, Installation Testing & Commissioning of Motor Actuator for Butterfly Valve consisiting of Quarter turn single phase Actuator and withsplash proof enclosure. (200 mm dia.) |
| 26 | Design Supply, Installation Testing & Commissioning of Motor Actuator for Butterfly Valve consisiting of Quarter turn single phase Actuator and withsplash proof enclosure. (250 mm dia.) |
| 27 | Design Supply, Installation Testing & Commissioning of Motor Actuator for Butterfly Valve consisiting of Quarter turn single phase Actuator and withsplash proof enclosure. (300 mm dia) |
| 28 | Design Supply, Installation Testing & Commissioning of Butterfly Valve (Ductile Iron) including all pipe fittings, tail pieces, hardware, Gaskets, fasteners, flanges, accessories as required(100 mm dia) |
| 29 | Design Supply, Installation Testing & Commissioning of Butterfly Valve (Ductile Iron) including all pipe fittings, tail pieces, hardware, Gaskets, fasteners, flanges, accessories as required(150 mm dia) |
| 30 | Design Supply, Installation Testing & Commissioning of Butterfly Valve (Ductile Iron) including all pipe fittings, tail pieces, hardware, Gaskets, fasteners, flanges, accessories as required(200 mm dia) |
| 31 | Design Supply, Installation Testing & Commissioning of Butterfly Valve (Ductile Iron) including all pipe fittings, tail pieces, hardware, Gaskets, fasteners, flanges, accessories as required(250 mm dia) |
| 32 | Design Supply, Installation Testing & Commissioning of Butterfly Valve (Ductile Iron) including all pipe fittings, tail pieces, hardware, Gaskets, fasteners, flanges, accessories as required(300 mm dia) |
| 33 | Customized, scalable SCADA System for Integrated water utility system for Municipal Coroporation, Karnal shall comprise of following:Supply, Installation,Testing, programming and commissioning of Data base management software / Historian at Central SCADA command and Control center |
| 34 | Supply, Installation,Testing, programming and commissioning ofOPC Server software at Central SCADA command and Control center |
| 35 | Supply, Installation,Testing, programming and commissioning of Reporting software at Central SCADA command and Control center. |
| 36 | Supply, Installation, Testing, Programming and Commissioning of SCADA software, Development version at Central SCADA command and control center. The software shall be provisioned for Unlimited Tags for the complete duration of the contract. |
| 37 | Supply, Installation, Testing, Programming and Commissioning of SCADA software, Run Time Server version with Unlimited Tags. The software shall be provisioned for Unlimited Tags for the complete duration of the contract. |
| 38 | Supply, Installation,Testing, programming and commissioning of SCADAclient software license |
| 39 | Supply, Installation,Testing, programming and commissioning of SCADAweb client software license |
| 40 | Supply, Installation,Testing, programming and commissioning ofAPIs for mobile apps and web portal. Apps for Android Operating Systems along with the design and development of APIs at server side using JAVA / dotnet technologies to provide data to Android apps required to fetch and display data likea) Status of Level Sensors, Motorised Valves, Level Sensorsb) Energy Parameters of Pumpsc) Pressure Transducersd) Any other parameter available in the system and as required by the KSCL/ Authority |
| 41 | IP CCTV Cameras (Bullet Camera) |
| 42 | Junction Box (IP 65), Power Equipment/ connection, Network Switch/Media Converter |
| 43 | OPEX 1st YrManpower:-Project Engineer (Elctrical & Electronics, B.Tech+ 5yrs Exp) |
| 44 | Supervisor(Diploma in Electrical and Electronics+ 5yrs Exp) |
| 45 | Workstation Computer Operator |
| 46 | Electrician (ITI +3yrs Exp) |
| 47 | Electrician Helper (ITI/Diploma+1yrs Exp) |
| 48 | Instrumentation |
| 49 | Software |
| 50 | CCTV |
| 51 | OPEX 2nd YrManpowerProject Engineer (Elctrical & Electronics, B.Tech+ 5yrs Exp) |
| 52 | Supervisor(Diploma in Electrical and Electronics+ 5yrs Exp) |
| 53 | Workstation Computer Operator |
| 54 | Electrician (ITI +3yrs Exp) |
| 55 | Electrician Helper (ITI/Diploma+1yrs Exp) |
| 56 | Instrumentation |
| 57 | Software |
| 58 | CCTV |
| 59 | OPEX 3rd YrManpowerProject Engineer (Elctrical & Electronics, B.Tech+ 5yrs Exp) |
| 60 | Supervisor(Diploma in Electrical and Electronics+ 5yrs Exp) |
| 61 | Workstation Computer Operator |
| 62 | Electrician (ITI +3yrs Exp) |
| 63 | Electrician Helper (ITI/Diploma+1yrs Exp) |
| 64 | Instrumentation |
| 65 | Software |
| 66 | CCTV |
| 67 | OPEX 4th YrManpowerProject Engineer (Elctrical & Electronics, B.Tech+ 5yrs Exp) |
| 68 | Supervisor(Diploma in Electrical and Electronics+ 5yrs Exp) |
| 69 | Workstation Computer Operator |
| 70 | Electrician (ITI +3yrs Exp) |
| 71 | Electrician Helper (ITI/Diploma+1yrs Exp) |
| 72 | Instrumentation |
| 73 | Software |
| 74 | CCTV |
| 75 | OPEX 5th YrManpowerProject Engineer (Elctrical & Electronics, B.Tech+ 5yrs Exp) |
| 76 | Supervisor(Diploma in Electrical and Electronics+ 5yrs Exp) |
| 77 | Workstation Computer Operator |
| 78 | Electrician (ITI +3yrs Exp) |
| 79 | Electrician Helper (ITI/Diploma+1yrs Exp) |
| 80 | Instrumentation |
| 81 | Software |
| 82 | CCTV |