| 2 | Scope of Work:-1. Dismantling of gear box.2. Dismantling of clutch assembly.3. Dismantling of tail gear.4. New carrier unit planetary gear, 01 set.5. New needle roller big bearing, 01 set.6. New 1st pinion., 01 piece.7. New gear socket, 01 piece.8. New gear clutch shaft, ,01 set.9. New needle roller bearing, 01 set.10. New gear main shaft, 01 no.11. New main shaft bearing, 02 nos.12. New gear lever, 01 set.13. Ana bond big size, 01 piece.14. New gear 35X12, 01 piece.15. Flywheel polishing, 01 piece.16. New clutch assembly, 01 set.17. Flywheel ring damage teeth repairing18. Pressure plate new changing,01 set.19. New engine mounting, 01 set.20. New cross, 01 set.21. New radiator hose top, 01 piece.22. New radiator hose bottom, 01 piece.23. New hose clamp, 04 piece.24. New water temperature meter, 01 piece.25. New silencer packing, 01 piece.26. New bolt & nut, 04 piece.27. New diesel mounting pad, 01 set.28. New battery socket, 04 piece.29. New battery lug, 04 piece.30. Fitting of tail gear & axle assembly.31. Packing kit, 01 set.32. Fitting of bearing & pinion seal axle of gear box.33. Axle oil seal, 02 set.34. Fitting of gear box assembly checking & testing.35. Fitting of the engine in the machine. |