Repairs To Drr 186 ( Strong ) Of Mechanical Division Kathua- 1 Complete Overhauling Fuel Injection Pump ( F.I.P ) Assembly By Way Of Dismantling It And Then Cleaning Of All Parts With Diesel. Job Includes P / F Of Joint Kit - 01 No., Element - 04 Nos., Delivery Valve - 04 Nos., Bearing - 02 Nos., Tooth Pin, Tooth Sleeve, Tooth Quadrant Assembly - 04 Set, Injectors -04 Nos., With Copper Washer, Feed Pump Kit-01 No. Job Also Includes Calibration Of Fuel Pump Injectors On Fuel Pump Bench Machine For Maximum Output. Assembling Of All The Parts Of F.I.P Assembly And Thereafter Testing It. Complete Job Includes Cost Of Material And Labour Charges ( Skilled And Unskilled ) Including Of All Taxes. 2 Repairs To Clutch System Of Drr Way Of Dismantling It And Removing Ofold Damaged Partsthenp / F Ofthrust Bearing ( Rio 51 ) -1 No. , Locking Wire ( Rio 54 ) -1 No., Lock Nut ( Rio 53 ) -1 No., Roller Bearing ( Rio 41 ) -1 No. , Cheese Head Bolt With Nut ( Rio 27 ) -12 No. , Grease Nipple ( Rio 49 ) -1 No. , Driving Pin ( Rio 35 ) -06No., Forward Clutch Plate ( Rio 36 ) -01 No. , Stud ( Rio 23 ) -12 No. , Driving Pin ( Rio 29 ) -06 No., Reverse Clutch Plate ( Rio 30 ) -1 No., Clutch Link ( Rio 42 ) -06 No., Pin For Clutch Link ( Rio 43 ) - 03 No. . Checking And Testing The M / C After Repairs. The Job Includes Cost Of Material, Labour Charges At Site And All Kind Of Taxes Thereof. 3 Repairs To The Radiator By Way Of Dismantling Its Upper And Lower Tank From The Water Jackets. Soldering To The Damaged Water Pipes, Cleaning Of Radiator With Hydrochloric Acid And Washing / Servicing. Wherever Required. Job Includes P / F Of Fan Cowl ( 309-1-2 ) -01 No., Rubber Pad ( 309-1-3 ) -04 Nos., Radiator Cap-01 No., Angle Support Mounting ( 309-1-5 ) -04 Nos. Bolt ( B-1-011 ) -08 Nos., Nut ( N-4-003 ) -08 Nos., Nut ( N-4-006 ) -04Nos., Special Washer ( Sw-5-001 ) -08 Nos., Special Washer ( Sw-5-004 ) -04 Nos. Job Also Includes Complete Job Includes The Cost Of Parts, Labour And Other Tools And Tackles Required For Job With All Taxes. 4 Repair To Operator Seat With Electrical / Gas Welding To The Seat Frames And Then P / F Of Cushioning Material And Waterproof Covers To Seat And Backrest As Per Size With Fabric Cover Along With Plywood. Complete Job Includes Cost Of Material And Labour Charges Including Of All Taxes. 5 Repair To Electrical System Ofdrr By Way Of Removing Of Damaged Parts As Well As Damaged Wirings And P / F Of Oil Pressure Gauge-01No. Temperature Gauge-01No., Ammeter-01No., Starter Switch -01No., Fan Belt- 01 No., Rubber Hoses - 01 Set, Hose Clamps- 04 No., Fuel Pipe ( Tank To Feed Pump ) - 01 No., Cable ( Battery To Starter ) - 01 No., Cable ( Battery To Earth ) - 01 No., Oil Pr. Pipe-01 No., Accelerator Wire-01 No., Battery Cable Adaptor-02 No., P / F Of New Wiring For Electrical Connections. Assembling Of Complete Unit After Job Completion And Checking It. The Complete Job Includes Cost Of Material And Labour Charges At Site. 6 Repairs To Alternator By Way Of Replacement Of Worn-Out Parts Which Includes Rectifier Plate 1 No., Voltage Regulator / Cut Out- 01 No., Starter 01 No., Rotor 01 No., Bearing ( 6303, 6202 ) 02 No., Carbon Bush- 01 Set, Al. Plate- 01 Set, Fasteners Along With Allied Works.The Complete Job Includes The Cost Of Material And Labour Charges And Inclusive Of All Taxes. 7 Rebate On Account Of Old Parts ( In Absolute Value Only )