Design Manufacture Supply Installation Testing And Commissioning Dmsitc Of Apron Drive Glass Walled Passenger Boarding Bridges Pbb And Advanced Visual Docking Guidance System Avdgs For Various Airports In India, Delhi-Delhi

Airports Authority Of India has published Design Manufacture Supply Installation Testing And Commissioning Dmsitc Of Apron Drive Glass Walled Passenger Boarding Bridges Pbb And Advanced Visual Docking Guidance System Avdgs For Various Airports In India. Submission Date for this Tender is 20-10-2022. Aerobridge Tenders in Delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

33619382
Corrigendum : Design Manufacture Supply Installation Testing And Commissioning Dmsitc Of Apron Drive Glass Walled Passenger Boarding Bridges Pbb And Advanced Visual Docking Guidance System Avdgs For Various Airports In India
Open Tender
Indian
Delhi
Delhi
20-10-2022

Tender Details

Design Manufacture Supply Installation Testing And Commissioning Dmsitc Of Apron Drive Glass Walled Passenger Boarding Bridges Pbb And Advanced Visual Docking Guidance System Avdgs For Various Airports In India

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 21-Sep-2022 Corrigendum - I Date 30-09-2022
2 30-Sep-2022 Corrigendum - II Other 10-10-2022
3 30-Sep-2022 Corrigendum - II Date 10-10-2022
4 10-Oct-2022 Corrigendum - III Other 20-10-2022
5 10-Oct-2022 Corrigendum - III Date 20-10-2022
6 19-Oct-2022 Corrigendum-I (ReplytoQueries) Other 20-10-2022

Key Value

Document Fees
INR 11800 /-
EMD
INR 14455470.0 /-
Tender Value
INR 302.23 Crore /-

BOQ Items

Name of Work: Design, Manufacture, Supply, lnstallation, Testing & Commissioning (DMSITC) of Apron Drive Glass Walled Passenger Boarding Bridges (PBB) and Advanced Visual Docking Guidance System (AVDGS) for Various Airports in India.
Sl. No. Item Description
11. Design, manufacture and Supply of Apron Drive type Glass Walled Passenger BoardingBridge with approximate extended operational length upto 32m (2/3 tunnels), consisting of self-supporting rotunda capable of rotating 180 Deg +/- 5 Deg. (Half of which shall be clockwise and other half anticlockwise), Telescopic tunnels having double glass side panels, cabin capable of total rotation up to 122.5 Deg (min 90 deg to the left and remaining to the right ), 175 to 180 Deg Bogey steering (+ 87.5 Deg) with solid tyres, microprocessor controls, Operating console, indications, safety devices, etc. as required along with Advanced Visual Docking Guidance System (A-VDGS) for precision parking of aircraft complete in all respects and complying ICAO guidelines including supply ofAir- conditioning units for the telescopic tunnels as required and supply of all materials for interconnection between PBB, A-VDGS, display units, panels and associated units/systems including cables, conduits etc. complete as required and as per technical specifications. The PBB steel tunnel structure should be capable of withholding the additional load of 2 no. ground power unit (GPU) and 1 no. pre-conditioned air unit (PCA) to be provided in future.
21(a). Imported material cost (The rate offered shall be the FOB cost including all taxes and duties of local bodies of respective country as applicable). (Rates to be quoted excluding Custom Duty and IGST).
31(b). Custom Duty @ 8.25% on imported material cost of BOQ item 1(a) in foreign currency. (Applicable IGST on basic custom duty shall be paid by AAI directly to custom authority).
41(c). Indian material cost of accessories and items for item no. 1(a) to be sourced from India/ value addition done in India in INR inclusive of all taxes, duties of local bodies, State & Central Govt. as applicable but exclusive of inland transportation, loading, unloading, insurance charges etc & GST in India. Note: - Inland Transportation charges including loading, unloading, insurance etc. upto respective airport site shall be quoted against BOQ item no. 5(c) & 7.
52. Design, manufacture and Supply of Apron Drive type Glass Walled Passenger BoardingBridge with approximate extended operational length more than 32m & upto 40m (3 tunnel), consisting of self-supporting rotunda capable of rotating 180 Deg +/- 5 Deg. (Half of which shall be clockwise and other half anticlockwise), Telescopic tunnels having double glass side panels, cabin capable of total rotation up to 122.5 Deg (min 90 deg to the left and remaining to the right ), 175 to 180 Deg Bogey steering (+ 87.5 Deg) with solid tyres, microprocessor controls, Operating console, indications, safety devices, etc. as required along with Advanced Visual Docking Guidance System (A-VDGS) for precision parking of aircraft complete in all respects and complying ICAO guidelines including supply ofAir- conditioning units for the telescopic tunnels as required and supply of all materials for interconnection between PBB, A-VDGS, display units, panels and associated units/systems including cables, conduits etc. complete as required and as per technical specifications. The PBB steel tunnel structure should be capable of withholding the additional load of 2 no. ground power unit (GPU) and 1 no. pre-conditioned air unit (PCA) to be provided in future.
62(a). Imported material cost (The rate offered shall be the FOB cost including all taxes and duties of local bodies of respective country as applicable). (Rates to be quoted excluding Custom Duty and IGST)
72(b). Custom Duty @ 8.25% on imported material cost of BOQ item 2(a) in foreign currency. (Applicable IGST on basic custom duty shall be paid by AAI directly to custom authority).
82(c). Indian material cost of accessories and items for item no. 2 (a) to be sourced from India/ value addition done in India in INR inclusive of all taxes, duties of local bodies, State & Central Govt. as applicable but exclusive of inland transportation, loading, unloading, insurance charges etc & GST in India. Note: - Inland Transportation charges including loading, unloading, insurance etc. upto respective airport site shall be quoted against BOQ item no. 5(c) & 7.
93. Design, manufacture and Supply of Apron Drive type Glass Walled Passenger BoardingBridge with approximate extended operational length more than 40m (3 tunnel), consisting of self-supporting rotunda capable of rotating 180 Deg +/- 5 Deg. (Half of which shall be clockwise and other half anticlockwise), Telescopic tunnels having double glass side panels, cabin capable of total rotation up to 122.5 Deg (min 90 deg to the left and remaining to the right ), 175 to 180 Deg Bogey steering (+ 87.5 Deg) with solid tyres, microprocessor controls, Operating console, indications, safety devices, etc. as required along with Advanced Visual Docking Guidance System (A-VDGS) for precision parking of aircraft complete in all respects and complying ICAO guidelines including supply ofAir- conditioning units for the telescopic tunnels as required and supply of all materials for interconnection between PBB, A-VDGS, display units, panels and associated units/systems including cables, conduits etc. complete as required and as per technical specifications. The PBB steel tunnel structure should be capable of withholding the additional load of 2 no. ground power unit (GPU) and 1 no. pre-conditioned air unit (PCA) to be provided in future.
103(a). Imported material cost (The rate offered shall be the FOB cost including all taxes and duties of local bodies of respective country as applicable). (Rates to be quoted excluding Custom Duty and IGST)
113(b). Custom Duty @ 8.25% on imported material cost of BOQ item 3(a) in foreign currency. (Applicable IGST on basic custom duty shall be paid by AAI directly to custom authority).
123(c). Indian material cost of accessories and items for item no. 3 (a) to be sourced from India/ value addition done in India in INR inclusive of all taxes, duties of local bodies, State & Central Govt. as applicable but exclusive of inland transportation, loading, unloading, insurance charges etc & GST in India. Note: - Inland Transportation charges including loading, unloading, insurance etc. upto respective airport site shall be quoted against BOQ item no. 5(c) & 7.
134. Design, Manufacture and Supply of Advance Visual Docking Guidance System (AVDGS) for azimuth guidance and stop position information for incoming Aircraft for precision parking complying to latest ICAO requiremenet complete including Manual Switching Board & surveillance Camera, the system shall have ability to identify the incoming aircraft, complete in all respect as required and as specified.
144(a). Imported material cost (The rate offered shall be the FOB cost including all taxes and duties of local bodies of respective country as applicable). (Rates to be quoted excluding Custom Duty and IGST).
154(b). The Custom Duty @ 8.25% on imported material cost of BOQ item 4(a) in foreign currency. (Applicable IGST on basic custom duty shall be paid by AAI directly to custom authority).
164(c). Indian material cost of accessories and items for item no. 4 (a) to be sourced from India/ value addition done in India in INR inclusive of all taxes, duties of local bodies. State & Central Govt. as applicable but exclusive of inland transportation, loading, unloading, insurance charges etc & GST in India. Note: - Inland Transportation charges including loading, unloading, insurance etc. upto respective airport site shall be quoted against BOQ item no. 6(c) & 8.
175. Cost of freight and insurance, transportation charges etc. for PBBs and AVDGS.
185(a). Cost of overseas freight and insurance for PBB including AVDGS and accessories etc. (applicable for item no. -1(a), 2(a) & 3(a)) from port of country of origin to Indian port including all charges such as handling charges as required. (Rates to be quoted excluding Custom Duty and IGST).
195(b). Custom Duty @ 8.25% on imported cost of BOQ item 5(a) in foreign currency. (Applicable IGST on basic custom duty shall be paid by AAI directly to custom authority).
205(c). Inland Transportation charges of PBB including AVDGS and accessories (applicable for item no. -1(a), 2(a) & 3(a) and 1(c), 2(c) & 3(c)) within India from the port of landing to the Airportsin India including clearing charges, warehousing charges, loading, unloading, insurance etc. as required (exclusive of GST).
216. Cost of freight and insurance, transportation charges etc. for AVDGS.
226(a). Cost of overseas freight and insurance for AVDGS and accessories etc. (applicable for item no. -4(a)) from port of country of origin to Indian port including all charges such as handling charges, etc. at abroad as required (Rates to be quoted excluding Custom Duty and IGST).
236(b). Custom Duty @ 8.25% on imported cost of BOQ item 6(a) in foreign currency. (Applicable IGST on basic custom duty shall be paid by AAI directly to custom authority).
246(c). Inland Transportation charges of AVDGS and accessories(applicable for item no. - 4(a) and 4 (c)) within India from the port of landing to respective Airport in India including clearing charges, warehousing charges, loading, unloading, insurance etc. as required (exclusive of GST).
25Assembling, lifting of PBB, positioning, installation, testing and commissioning of PBB & AVDGS including Civil Work such as Foundation etc. at the Airport site (as per specifications) including installation testing and commissioning of advanced visual docking guidance system i/c mounting of operator panel (manual switching board) in IP65 enclosure etc., air conditioning system and all control and power cabling, earthing etc. complete as required (exclusive of GST) (for item no. 1, 2 & 3).
26Installation, Testing & Commissioning of Advance Visual Docking Guidance System (AVDGS) complete as required at site including supply of mounting poles suitable for AVDGS, mounting of operator panel (manual switching board) in IP65 enclosure, including foundation work, connectioning and inter-connection of power, communication & control cables, earthing etc. complete as required at site to make the system fully functional (exclusive of GST) (for item no. 4)
27PBBs & AVDGS Operation: Operation of PBBs, A-VDGS & associated accessories after Site Acceptance Test (SAT)/ Commissioning of PBBs, as per standard OEM recommendations & practices and as per conditions of contract. Note: - The manpower (exclusive of AICMC) deployment for operation of PBB’s & AVDGS shall be minimum Two (02) persons per PBB per shift [01 Skilled and 01 Un-skilled] and shall be deployed after completion of Site Acceptance Test (SAT) of PBBs & AVDGS or date of commissioning whichever is earlier.
28Year 1
29Year 2
30Year 3
31Year 4
32Year 5
33Year 6
34Year 7
35Year 8
36Year 9
37Year 10
38Year 11
39Year 12
40Year 13
41Year 14
42Year 15
43PBBs & AVDGS All Inclusive Comprehensive Maintenance Contract (AICMC): All inclusive Comprehensive Maintenance of Glass Walled Passenger Boarding Bridges, A-VDGS and all associated accessories, panels installed at each Airports under this contract including cost of all required spares (imported/Indian), labour & arranging of tools & plants, for satisfactory comprehensive maintenance of the system after Defects Liability Period (DLP- 2 years) complete as required and as per conditions of contract. Note: - (1) All-inclusive Comprehensive maintenance contract (AICMC) shall start for thirteen years after defect liability period including cost of all required spares, labour, consumables and tools for PBBs & A-VDGS. (2) Rates shall be quoted considering supply and replacement of AC unit, UPS, PBB flooring and complete painting of PBBs after 7 years but not later than 10 years from date of commissioning as decided by EIC.
44Year 1 (1st year of DLP) (Rates not to be quoted)
45Year 2 (2nd year of DLP) (Rates not to be quoted)
46Year 3
47Year 4
48Year 5
49Year 6
50Year 7
51Year 8
52Year 9
53Year 10
54Year 11
55Year 12
56Year 13
57Year 14
58Year 15
59AVDGS Operation: Operation of additional AVDGS & associated accessories after SAT/ Commissioning of AVDGS, as per standard OEM recommendations & practices and as per conditions of contract. Note: - The manpower (exclusive of AICMC) deployment for operation of AVDGS shall be minimum One (01) skilled person per AVDGS per shift and shall be deployed after completion of Site Acceptance Test (SAT) of AVDGS or date of commissioning whichever is earlier.
60Year 1
61Year 2
62Year 3
63Year 4
64Year 5
65Year 6
66Year 7
67Year 8
68Year 9
69Year 10
70Year 11
71Year 12
72Year 13
73Year 14
74Year 15
75AVDGS All Inclusive Comprehensive Maintenance Contract (AICMC): All inclusive Comprehensive Maintenance of additional AVDGS and all associated accessories, panels installed at each Airports under this contract including cost of all required spares(imported/Indian) & arranging of tools & plants, for satisfactory comprehensive maintenance of the system after Defects Liability Period (DLP- 2 years) complete as required and as specified. Note: - All-inclusive Comprehensive maintenance contract (AICMC) shall start for thirteen years after defect liability period including cost of all required spares, labour, consumables and tools for A-VDGS.
76Year 1 (1st year of DLP) (Rates not to be quoted)
77Year 2 (2nd year of DLP) (Rates not to be quoted)
78Year 3
79Year 4
80Year 5
81Year 6
82Year 7
83Year 8
84Year 9
85Year 10
86Year 11
87Year 12
88Year 13
89Year 14
90Year 15
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail