Eb Shifting At Cprr-W6 Shifting / Dismantling, Conversion And Rerouting Of The Existing Lt / Ht Lines In Andarkuppam Section Of Tangedco
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Sep 2022
0 days left
EMD
40200
Bank guarantee accepted
Document Fee
10620
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Eb Shifting At Cprr-W6 Shifting / Dismantling, Conversion And Rerouting Of The Existing Lt / Ht Lines In Andarkuppam Section Of Tangedco
BOQ
| Sl. No. | Item Description |
| 1 | LT Network OH to UG of Narasingambedu SS I/250 KVA DT. |
| 2 | Cost & Supply of the following new materials of ISI standard as per TANGEDCO Specifications and properly stacking at stores as directed by the Engineer-in-chargeincludingcost, conveyance and other incidental charges etc complete |
| 3 | PSC 8.0 mtr pole |
| 4 | Base plate |
| 5 | LT Three phase cross arm |
| 6 | LT back clamp for PSC pole |
| 7 | Pole Concreting |
| 8 | Pole Earthing |
| 9 | LT shackle with MP |
| 10 | LT UG 4x240 sqmm cable as per TANGEDCO Technical Specifications |
| 11 | 240 sqmm Alu. Lug |
| 12 | Stay Set complete with Guy Insulator |
| 13 | RCC spun pipe 150 mm |
| 14 | MS Bolts & Nuts |
| 15 | Storage charges for storing materials as directed by the Engineer-in-charge |
| 16 | Labour charges for erection of new materialsat new locationincludingtransport charges , loading and unloading from stores to new location etc complete as directed by the Engineer incharge |
| 17 | LT Network of Chinnivakkam SSIII/250 KVA (Neduvarambakkam Village) |
| 18 | Cost & Supply of the following new materials of ISI standard as per TANGEDCO Specifications and properly stacking at stores as directed by the Engineer-in-chargeincludingcost, conveyance and other incidental charges etc complete |
| 19 | LT shackle with MP |
| 20 | LT UG 4x240 sqmm cable as per TANGEDCO Technical Specifications |
| 21 | 240 sqmm Alu. Lug |
| 22 | Stay Set complete with Guy Insulator |
| 23 | RCC spun pipe 150 mm |
| 24 | Storage charges for storing materials as directed by the Engineer-in-charge |
| 25 | Labour charges for erection of new materialsat new locationincludingtransport charges , loading and unloading from stores to new location etc complete as directed by the Engineer incharge |
| 26 | LT Network of Chinnivakkam SSIII/250 KVA (Neduvarambakkam Periya colony) |
| 27 | Cost & Supply of the following new materials of ISI standard as per TANGEDCO Specifications and properly stacking at stores as directed by the Engineer-in-chargeincludingcost, conveyance and other incidental charges etc complete |
| 28 | LT shackle with MP |
| 29 | LT UG 4x240 sqmm cable as per TANGEDCO Technical Specifications |
| 30 | 240 sqmm Alu. Lug |
| 31 | Stay Set complete with Guy Insulator |
| 32 | RCC spun pipe 150 mm |
| 33 | Storage charges for storing materials as directed by the Engineer-in-charge |
| 34 | Labour charges for erection of new materialsat new locationincludingtransport charges , loading and unloading from stores to new location etc complete as directed by the Engineer incharge |
| 35 | HT OH feeder in 11 KV Chathiram feeder fed off 110/33/11 KV Panjetty SS at Neduvarambakkam village |
| 36 | Cost & Supply of the following new materials of ISI standard as per TANGEDCO Specifications and properly stacking at stores as directed by the Engineer-in-chargeincludingcost, conveyance and other incidental charges etc complete |
| 37 | PSC 9.0 mtr pole for stud |
| 38 | 11 KV Tapping Channel cross arm |
| 39 | 11 KV Polymer Disc with MP |
| 40 | Back clamp for PSC 9.0 mtr pole |
| 41 | MS Bolts & Nuts |
| 42 | 11 KV 3x300 sqmm UG cable as per TANGEDCO Technical Specifications |
| 43 | 11KV 3x300 sqmm O/D kit |
| 44 | RCC spun pipe 225 mm |
| 45 | Storage charges for storing materials as directed by the Engineer-in-charge |
| 46 | Labour charges for erection of new materialsat new locationincludingtransport charges , loading and unloading from stores to new location etc complete as directed by the Engineer incharge |
| 47 | LT OH feeder in to LT UG feeder in existing LT Network of Amoor colony SS/100 KVA DT |
| 48 | Cost & Supply of the following new materials of ISI standard as per TANGEDCO Specifications and properly stacking at stores as directed by the Engineer-in-chargeincludingcost, conveyance and other incidental charges etc complete |
| 49 | PSC 8.0 mtr pole |
| 50 | Base plate |
| 51 | LT Three phase cross arm |
| 52 | Back clamp for PSC pole |
| 53 | LT shackle with MP |
| 54 | LT pin with insulator |
| 55 | Stay clamp |
| 56 | Guy Insulator |
| 57 | Aluminium Knob |
| 58 | Stay set complete |
| 59 | ACSR 7/2.59 Sqmm conductor |
| 60 | MS Bolts & Nuts |
| 61 | Pole Concreting |
| 62 | Pole Earthing |
| 63 | Storage charges for storing materials as directed by the Engineer-in-charge |
| 64 | Labour charges for erection of new materialsat new locationincludingtransport charges , loading and unloading from stores to new location etc complete as directed by the Engineer incharge |
AI Tender Summary
Tender Timeline
Aug 23, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedSep 08, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 09, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender