6 NoS1.Renovation Ofpueschool ( Southfacing ) In Sundarakottai Panchayat 2.Renovation Of Pme School Building ( North Facing ) In Sundarakottai Panchayat 3.Renovation Of Pum School West Facingtoilet Building In Sundarakottai Panchayat 4.Renovation Of P
Tender Overview
Project Description
6 NoS1.Renovation Ofpueschool ( Southfacing ) In Sundarakottai Panchayat 2.Renovation Of Pme School Building ( North Facing ) In Sundarakottai Panchayat 3.Renovation Of Pum School West Facingtoilet Building In Sundarakottai Panchayat 4.Renovation Of Pum School ( West Fasing ) Toilet Building In Sundarakottai Panchayat 5. Renovation Of Pmmschool Boystoilet Building In Sundarakottaipanchayat 6.Renovation Of Pum School ( Northfasing ) Building In Sundarakottai Panchayatat Mannargudi Block In Tiruvaur District . Package No:7 / Mng / Sids / 2021-22
BOQ
| Sl. No. | Item Description |
| 1 | 1.Renovation of PUM school(South Facing) Building In Sundarakottai panchayat |
| 2 | Chipping concrete including all labour charges and removing depris frome the work site etc complete |
| 3 | Paving the floor with Anti kids slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 4 | Pointing with cement mortar 1:3 to full depth of tilesusingcrudeoil 10% by Finishing the top of roof with one course of Machine pressed tiles weight of cementincluding cost and conveyance of all materials to site |
| 5 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 6 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 7 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 8 | Painting two coats with approved Black Oxide for Old Black board works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 9 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 10 | Provision for Nameboard charges |
| 11 | 2.Renovation of PUM school (NorthFacing) In Sundarakottai panchayat |
| 12 | Chipping concrete including all labour charges and removing depris frome the work site etc complete |
| 13 | Paving the floor with Anti kids slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 14 | Finising the top of roof with one of Pressed tiles of size 23 x cm 23cm x2 cm of approve quality laid in cement mortar 1:3 (one cemente and three snad )12mm thick mixed with water proofing compound conforming |
| 15 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 16 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 17 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 18 | Painting two coats with approved Black Oxide for Old Black board works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 19 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 20 | Provision for Nameboard charges |
| 21 | 3.Renoavation ofPUM school Boys (West Fasing)Toilet Building In Sundarakottai panchayat |
| 22 | Chipping concrete including all labour charges and removing depris frome the work site etc complete |
| 23 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 24 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 25 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 26 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 27 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 28 | Provision for Nameboard charges |
| 29 | 4.Renovation ofPME school girls Toilet building (West Facing)In Sundarakottaipanchayat |
| 30 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 31 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 32 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 33 | Provision for Nameboard charges |
| 34 | 5.Renovation ofPUM school Boys Toilet Building In Sundarakottai panchayat |
| 35 | Chipping concrete including all labour charges and removing depris frome the work site etc complete |
| 36 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 37 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 38 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 39 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 40 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 41 | Provision for Nameboard charges |
| 42 | 6.Renovation of PME school girls Toilet building (North Facing)In Sundarakottai panchayat |
| 43 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 44 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 45 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 46 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 47 | Provision for Nameboard charges |
| 48 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender