| 1 | Construction of Security Cabin in front of Autokast Ltd. Major Raw material Brickand rubble will be supplied by AKL |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.- All kinds of soil. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) |
| 5 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:-DPC |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 8 | Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 20cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete |
| 9 | .RCC 1:2:4 for lintels,sunshade,cuboards and roof slab. Using 20mm nominal stone. |
| 10 | Centering and shuttering including strutting, etc. and removal of form for: Foundations and Plinth beam |
| 11 | Centering and shuttering including strutting, etc. and removal of form for:lintels, beams, roofs and sunshade. |
| 12 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding for plinth beam, roof, lintel and sunshadeThermo - Mechanically Treated bars of grade Fe-500D or more. |
| 13 | Proviidng and fixing panelled door with necessary fittings and 2nos ofglazed shutter windows including fittings and enamel painting all complete as per the direction of the engineer-in-charge. |
| 14 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)- for flooring |
| 15 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm. For flooring and skirting |
| 16 | Providing plastering with cement mortar 1:4 , 12mm thick for both sides of wall with neat finishing and curing etc all as per the direction of the company. 12 mm cement plasterof mix:1:4 ( 1 cement : 4 fine sand) |
| 17 | 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) on under side and upper side of roof |
| 18 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer |
| 19 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour. Two coats |