| 1 | Dismantling of steel structures, plate forms, supports, tanks,railing, hoppers, pipes,girth gears, chutes, ducts, cells, dismantling of mechanical equipments & electrical equipments/assemblies including rubber lining pipelines etc. at all the heights. |
| 2 | Fabrication of steel structures, supports, plate forms,hoppers, cells, ducts, chutes, chimneys, towers, tanks, bends etc. including fixing of rubber lining with boltsif so required to the required drawings/specifications. |
| 3 | Erection of fabricated items as in Sl.No.2 & also equipment’ssub assemblies, motors, pumps , girth gears, mechanical/electrical equipments etc. at all the heights. |
| 4 | Laying of old/new M.S./C.I./G.I./MSRL pipeline of all classes with welded/flanged/ socket joints, includingfabrication of bends, flanges, expansion joints etc. connected with the laying of pipelines at all the heights.. Pipe Line up to 1.5\" NB Pipe |
| 5 | Laying of old/new M.S./C.I./G.I./MSRL pipeline of all classes with welded/flanged/ socket joints, includingfabrication of bends, flanges, expansion joints etc. connected with the laying of pipelines at all the heights.. Pipe line 2” to 4.5” N.B, Size |
| 6 | Laying of old/new M.S./C.I./G.I./MSRL pipeline of all classes with welded/flanged/ socket joints, includingfabrication of bends, flanges, expansion joints etc. connected with the laying of pipelines at all the heights.. Pipe Line 5” to 8”N.BSize |
| 7 | Laying of old/new M.S./C.I./G.I./MSRL pipeline of all classes with welded/flanged/ socket joints, includingfabrication of bends, flanges, expansion joints etc. connected with the laying of pipelines at all the heights.. Pipe Line 8.5” to 12” N.B. Size |
| 8 | Laying of old/new M.S./C.I./G.I./MSRL pipeline of all classes with welded/flanged/ socket joints, includingfabrication of bends, flanges, expansion joints etc. connected with the laying of pipelines at all the heights.. Pipe Line 12.5” to 16” N.B. Size |
| 9 | Shifting of material and equipment at all heights inside the plants, Lifting & lowering of counter weights & pulleys ofconveyor beltsetc |
| 10 | Applying priming coat with ready mixed red oxide zinc chromateprimer of approved brand andmanufacturer on steel galvanized iron/steel works |
| 11 | Painting with synthetic enamel paint of approved brand and manufacturer to give an evenshade with two or more coats on new work |
| 12 | Replacement of Shell lifter bars for Ball Mill 151 |
| 13 | Removal of old steel liners of rod & slag mills on shell and head by cutting / opening the bolts, itting of new liners with rubber gaskets, new bolts, washers & nuts etc. Transportation of new liners from central store to work place on comp |
| 14 | REPLACEMENT OF GIRTH GEAR OF MILL |
| 15 | REPLACEMENT OF HEAD OF MILL |