Power Boards / Undertakings / PSU Closing in 0 days TDR #33592875

Labour Charges For Carrying Out Extension / Improvement / Oh Fault Rectification & Other Maintenance Works In Panchetty Sub-Division Of Ponneri Division In Chennai North Circle- 1 LABOUR CHARGES FOR ERECTION OF DOUBLE POLE STRUCTURE WITH DISTRIBUTION

Issued by Boards / Undertakings / PSU · ponneri, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
01 Sep 2022
0 days left
EMD
25000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
ponneri → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Labour Charges For Carrying Out Extension / Improvement / Oh Fault Rectification & Other Maintenance Works In Panchetty Sub-Division Of Ponneri Division In Chennai North Circle- 1 LABOUR CHARGES FOR ERECTION OF DOUBLE POLE STRUCTURE WITH DISTRIBUTION TRANSFORMER. 2 Excavation of Structure Pole Pit 2 x 3 x 1/6 th of height of pole 3 Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole 4 Transporting of 9.14 m poles from Road side to pole pit 5 Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement. 6 Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.DPDC channel, T.I. Fitting etc., in complete. 7 Excavation of stay pit 0.95x0.60x1.5m 8 Erection of Stay Set Complete 9 Sleeve concrete for stay set including all materials & cement 10 Erection of HG fuse set with transport 11 Erection of 11 KV AB switch complete set with transport 12 Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough 13 Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for DP Structure 14 Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for TP Structure 15 Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for Four Pole Structure 16 Erection of L.T.Open type fuse unit including cable jumpering upto the line. 17 Providing LT bus bar arrangementsin DT structure including fixing of cross arm and insulator. 18 Erection of H.T. jumpering in DP structure complete (150 * 3) 19 Erection of H.T. LAS(3 Nos) 20 Erection of L.T. LAS(4 Nos) 21 Erection of DT excluing loading and unloading using Crane - 63KVA/100KVA 22 Erection of DT excluing loading and unloading using Crane -Above 100 KVA 23 Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. Without Material 24 Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. - With Material 25 Painting of Structure pole with Distemper including cost of material 26 Loading and unloading of Distribution Transformer at site and store. (All Rating) 27 Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Upto 100 KVA 28 Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Above 100 KVA 29 LABOUR CHARGES FOR LAYING OF HT CABLE 30 Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Normal Road 31 Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Tar Road 32 Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,-Concrete Road 33 Loading and unloading of HT Cable including coiling and recoiling 34 Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 Km 35 Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 Km 36 Laying of 11KV 3 X 300 sq mm XLPE cable 37 Laying of 11KV 3 X 120 sq mm XLPE cable 38 Covering HT cable by cement V trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size onthe trough 39 Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 40 Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 Km 41 Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 Km 42 LABOUR CHARGES FOR LAYING OF LT CABLE 43 Loading and unloading of LT Cable including coiling and recoiling 44 Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle upto 5 Km 45 Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle above 5 Km 46 Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. - Normal Road 47 Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Tar Road 48 Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Concrete Road 49 Laying of LT 4 x 240 sq.mm cable 50 Laying of LT 4 X 120 sq.mm cable 51 Laying of LT 4 X 25 sq.mm cable 52 Laying of LT 2 X 16 sq.mm cable 53 Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 54 LABOUR CHARGES FOR ERECTION OF PILLAR BOX 55 Erection of 4 / 6 Way pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc., 56 Erection of Mini pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc., 57 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 8 Way Pillar Box 58 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 8 Way Pillar Box 59 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 6 Way Pillar Box 60 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 6 Way Pillar Box 61 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 4 Way Pillar Box 62 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 4 Way Pillar Box 63 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - Mini Pillar Box 64 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - Mini Pillar Box 65 LABOUR CHARGES FOR DISMANTLING OF PILLAR BOX 66 Dismantling of old 4 / 6 / 8 Way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 67 Dismantling of old Mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 68 LABOUR CHARGES FOR MISCELLANEOUS WORK 69 Excavation of pole pit (pit size 2x3x1/6th of the length of poles) for 7.5mtrs/8 mtrs pole 70 Erection of 7.5m / 8m RCC/RSJ/PSC pole and other poles 71 Excavation of pole pit (pit size 2x3x1/6th of the length of poles) for 9.14m Pole 72 Erection of 9.14m RCC/RSJ/PSC pole and other poles 73 Trasportation of pole of all sizes from Road side to work spot 74 Trasportation of pole of all sizes from Stores to Road side upto 2KM 75 Trasportation of pole of all sizes from Stores to Road side upto Above 2 Km 76 Base concerting 30 cm thick for one pole including of all materials 77 Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa upto 10 Km 78 Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa Above 10 Km 79 Erection of V cross arm 3 1/2size 80 Erection of V cross arm41/2 size 81 Erection of Tapping channel 5 size / V Cross Arm 5 size 82 Excavation of stay pit 83 Erection of stay set complete 84 Fixing of 11 KV TI fitting 85 Fixing of 33 KV TI fitting 86 Fixing of LT 3 phase cross arm 87 Fixing of LT TI fitting 88 Fixing of single phase cross arm 89 LT pin insulator with pin 90 LT shackle with strap sets 91 11 KV pin insulator with GI pin 92 33 KV pin insulator with GI pin 93 11 KV strain disc with metal parts 94 33 KV strain disc with metal parts 95 Fixing of Aluminium knob 96 Fixing of caution / Danger Board 97 Providing of fly stay (excluding pole erection and earth excavation) 98 Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 7.5m/8m Pole 99 Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 9.14 metres pole (with coping of 1 dia upto height of 1.1/2 above ground level) Pole 100 Earthing of poles 101 Paving out conductor, stringing and sagging of line of 7/2.59mm ACSR / 7/2.50 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 102 Paving out conductor, stringing and sagging of line of 7/3.35mm ACSR / 7/3.15 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 103 Paving out conductor, stringing and sagging of line of 7/4.09mm ACSR Racoon conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 104 Paving out conductor, stringing and sagging of line of 7/4.72mm Dog conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 105 Numbering of location/each including cost of paint and labour 106 Providing of 2 wire flat guarding(Split neutral grounding)per span excluding of stay set erection 107 Providing of 4 wire flat guarding per span excluding of stay set erection 108 Providing of Craddle guarding including earthing and earth pit excavation per span excluding of stay set erection 109 Erection of street light fittings 2 feet/4 feet (All materials supplied by the Board) Labour alone. 110 Erection of cross bracing set 10 / 15 Structure - DP Structure 111 Erection of cross bracing set 10 / 15 Structure - TP Structure 112 Erection ofTop Channels 10 / 15 Structure - DP Structure 113 Erection ofTop Channels 10 / 15 Structure - TP Structure 114 Erection of33 KV centre rotating AB switch complete set 115 Erection of11 KV centre rotating AB switch complete set 116 Erection of Single phase spacer 117 Erection of Three phase spacer 118 Provision of jumper per phase for LT 119 Provision of Jumper per phase for HT 120 Provision of PA jumpers 121 Loading of Metering Set 122 Un loading of Metering Set 123 Erection of Metering Sets - Up to 11KV metering set 124 Erection of Metering Sets - Above 11KV metering set 125 Loading of 7.5/8 metres pole (RCC/PSC)/Each 126 Loading of9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each 127 Unloading of 7.5/8 metres pole (RCC/PSC)/Each 128 Unloading of 9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each 129 Loading of Conductor drum of all sizes with conductor 130 Loading of Conductor drum of all sizes without conductor 131 Unloading of Conductor drum of all sizes with conductor 132 Unloading of Conductor drum of all sizes without conductor 133 Manufacturing of MS clamps at works spot as per requirement , including alteration by using 50 x 8 mm Flat (with material) 134 Manufacturing of MS clamps at works spot as per requirement , including alteration by using 65 x 10 mm Flat (with material) 135 Cutting of Channel/Flat/Angle 136 Cutting of RSJ pole 137 Cutting of Tubular pole 138 Cutting of Rail pole 139 Drilling of 5/8, 3/8, 1/ Holes in Channels / Angles - Slot Holes 140 Drilling of 5/8, 3/8, 1/ Holes in Channels / Angles - Round Holes 141 Fixing of Missing doors in MS Mini Pillar Box 142 Fixing of Missing doors in MS 4 WayPillar Box 143 Fixing of Missing doors in MS 6 WayPillar Box 144 Fixing of Missing doors in MS 8 WayPillar Box 145 Fixing of Missing doors in FRPPillar Box 146 Provision of 2 Nos Hinges in all types of Pillar Box 147 LABOUR CHARGES FOR MAINTENANCE WORK 148 DP/TP Structure maintenance - Pole Mounted 149 DT maintenance for various capacity 150 Structure earthing wire redoing - Various capacity 151 Replacement of Structure earthing in complete without material - Various Capacity 152 DT structure Yard cleaning - Various Capacity 153 Watering to earth pits 154 Numbering of location including cost of paint and labour 155 Maintenance of 8 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 156 Maintenance of 6 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 157 Maintenance of 4 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 158 Maintenance of Mini Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 159 Numbering of Pillar with feeder details including cost of paint and labour 160 Maintenance of 11 KV ABS only at Structure.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 161 Maintenance of 11 KV ABS only at SS.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 162 Maintenance of 33 KV ABS at Structure(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 163 Maintenance of 33 KV ABS at SS(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 164 Cutting of big tree fouling on the line. 165 Cutting of tree branches fouling on the line. 166 Clearing of heavy bushes 167 Jungle/bushes/velikathan clearence 168 Set righting leanedHT/LT Poles at Pin Point Location 169 Set righting leanedHT/LT Poles at Cut Point Location 170 Re-sagging of HT Line -7/4.72 mm 171 Re-sagging (HT/LT) Line 7/4.09 mm 172 Re-sagging (HT/LT) Line7/3.35 mm 173 Re-sagging (HT/LT) Line 7/2.59 mm 174 DC of Single phase service 175 DC of Three phase service 176 RC of Single phase service 177 RC of Three phase service 178 LABOUR CHARGES FOR DISMANTLING WORK 179 Dismantling of 7.5m/8.0m Poles 180 Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles 181 Dismantling of Stay set complete 182 Dismantling of conductors including Coiling and Transporting from workspot to road side upto 7/3.35mm Conductor without transport 183 Dismantling of conductors including Coiling and Transporting from workspot to road side above 7/3.35mm Conductor without transport 184 Releasing of LT S ph X Arm/TI Fitting 185 Releaasing of LT 3 ph X Arm 186 Releasing of 3 - 6 V Cross Arm/Tapping channal/GuardingX Arm 187 Releasing of 4 - 6 andV Cross Arm 188 Releasing of5V Cross Arm 189 Releasing of Distn.Tr. Only at field 190 Dismantling of Transformer Structure materials - Up to 100 KVA 191 Dismantling of Transformer Structure materials - Above 100 KVA 192 Dismantling of 11KV AB Switch at Structure 193 Dismantling of 33KV AB Switch at Structure 194 Dismantling of H.G. fuse set 195 Dismantling of HT LAS at DT Structure 196 Dismantling of LT LAS at DT Structure 197 Dismantling of Earth Pipe and Structure earthing complete 198 Dismantling of 2 Sets Open type fuse unit with all wiring complete(including bus bar arrangement) 199 Dismantling of cross bracing set 200 Dismantling of Top Channel 201 Dismantling of Guarding including Dismantling of cross arm per span 202 Dismantling of Single ph service wire & re-effecting service including meter 203 Dismantling of three ph service wire & re-effecting service including meter 204 Breaking of RCC Damaged Poles after dismantling,releasing the grill including transporting to Road side 205 Stacking materials/Scrap 206 LABOUR CHARGES FOR ERECTION OF SINGLE POLE STRUCTURE 207 Loading and Unloading of 9.0m Square Pole 208 Excavation of Pole Pit 209 Erection of 9.0m Square Pole 210 Transporting of Square Pole from Road Side to Pole Pit 211 Excavation of stay pit 0.95x0.60x1.5m 212 Erection of Stay Set Complete 213 Fixing of Single Pole Structure Material in complete shape 214 Erection of 16 / 25 / 40 KVA Distribution Transformer 215 Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough 216 Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement. 217 Sleeve concrete for stay set including all materials 218 Erection of HT LAS (3 Nos) 219 Erection of LT LAS (4 Nos) 220 Erection of LT Wiring Kit (Double Open Type Circuit) 221 Painting of single pole structure including iron materials double coat with materials 222 Painting of single pole structure including iron materials double coatwithout materials 223 Painting of Structure pole with Distemper including cost of material 224 GST

BOQ

Name of Work: Labour charges for carrying out Extension / Improvement / OH Fault Rectification & Other Maintenance Works in Panchetty Sub-division of Ponneri Division in Chennai North Circle
Sl. No. Item Description
1LABOUR CHARGES FOR ERECTION OF DOUBLE POLE STRUCTURE WITH DISTRIBUTION TRANSFORMER.
2Excavation of Structure Pole Pit 2\" x 3\" x 1/6 th of height of pole
3Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole
4Transporting of 9.14 m poles from Road side to pole pit
5Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement.
6Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.DPDC channel, T.I. Fitting etc., in complete.
7Excavation of stay pit 0.95x0.60x1.5m
8Erection of Stay Set Complete
9Sleeve concrete for stay set including all materials & cement
10Erection of HG fuse set with transport
11Erection of 11 KV AB switch complete set with transport
12Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough
13Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for DP Structure
14Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for TP Structure
15Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for Four Pole Structure
16Erection of L.T.Open type fuse unit including cable jumpering upto the line.
17Providing LT bus bar arrangementsin DT structure including fixing of cross arm and insulator.
18Erection of H.T. jumpering in DP structure complete (150 * 3)
19Erection of H.T. LAS(3 Nos)
20Erection of L.T. LAS(4 Nos)
21Erection of DT excluing loading and unloading using Crane - 63KVA/100KVA
22Erection of DT excluing loading and unloading using Crane -Above 100 KVA
23Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. Without Material
24Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. - With Material
25Painting of Structure pole with Distemper including cost of material
26Loading and unloading of Distribution Transformer at site and store. (All Rating)
27Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Upto 100 KVA
28Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Above 100 KVA
29LABOUR CHARGES FOR LAYING OF HT CABLE
30Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Normal Road
31Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Tar Road
32Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,-Concrete Road
33Loading and unloading of HT Cable including coiling and recoiling
34Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 Km
35Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 Km
36Laying of 11KV 3 X 300 sq mm XLPE cable
37Laying of 11KV 3 X 120 sq mm XLPE cable
38Covering HT cable by cement \"V\" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size onthe trough
39Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
40Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 Km
41Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 Km
42LABOUR CHARGES FOR LAYING OF LT CABLE
43Loading and unloading of LT Cable including coiling and recoiling
44Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle upto 5 Km
45Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle above 5 Km
46Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. - Normal Road
47Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Tar Road
48Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Concrete Road
49Laying of LT 4 x 240 sq.mm cable
50Laying of LT 4 X 120 sq.mm cable
51Laying of LT 4 X 25 sq.mm cable
52Laying of LT 2 X 16 sq.mm cable
53Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete.
54LABOUR CHARGES FOR ERECTION OF PILLAR BOX
55Erection of 4 / 6 Way pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc.,
56Erection of Mini pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc.,
57Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 8 Way Pillar Box
58Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 8 Way Pillar Box
59Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 6 Way Pillar Box
60Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 6 Way Pillar Box
61Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 4 Way Pillar Box
62Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 4 Way Pillar Box
63Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - Mini Pillar Box
64Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - Mini Pillar Box
65LABOUR CHARGES FOR DISMANTLING OF PILLAR BOX
66Dismantling of old 4 / 6 / 8 Way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
67Dismantling of old Mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
68LABOUR CHARGES FOR MISCELLANEOUS WORK
69Excavation of pole pit (pit size 2\"x3\"x1/6th of the length of poles) for 7.5mtrs/8 mtrs pole
70Erection of 7.5m / 8m RCC/RSJ/PSC pole and other poles
71Excavation of pole pit (pit size 2\"x3\"x1/6th of the length of poles) for 9.14m Pole
72Erection of 9.14m RCC/RSJ/PSC pole and other poles
73Trasportation of pole of all sizes from Road side to work spot
74Trasportation of pole of all sizes from Stores to Road side upto 2KM
75Trasportation of pole of all sizes from Stores to Road side upto Above 2 Km
76Base concerting 30 cm thick for one pole including of all materials
77Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa upto 10 Km
78Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa Above 10 Km
79Erection of V cross arm 3 1/2\"size
80Erection of V cross arm41/2\" size
81Erection of Tapping channel 5 \" size / V Cross Arm 5\" size
82Excavation of stay pit
83Erection of stay set complete
84Fixing of 11 KV TI fitting
85Fixing of 33 KV TI fitting
86Fixing of LT 3 phase cross arm
87Fixing of LT TI fitting
88Fixing of single phase cross arm
89LT pin insulator with pin
90LT shackle with strap sets
9111 KV pin insulator with GI pin
9233 KV pin insulator with GI pin
9311 KV strain disc with metal parts
9433 KV strain disc with metal parts
95Fixing of Aluminium knob
96Fixing of caution / Danger Board
97Providing of fly stay (excluding pole erection and earth excavation)
98Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 7.5m/8m Pole
99Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 9.14 metres pole (with coping of 1\" dia upto height of 1.1/2\" above ground level) Pole
100Earthing of poles
101Paving out conductor, stringing and sagging of line of 7/2.59mm ACSR / 7/2.50 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering.
102Paving out conductor, stringing and sagging of line of 7/3.35mm ACSR / 7/3.15 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering.
103Paving out conductor, stringing and sagging of line of 7/4.09mm ACSR Racoon conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering.
104Paving out conductor, stringing and sagging of line of 7/4.72mm Dog conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering.
105Numbering of location/each including cost of paint and labour
106Providing of 2 wire flat guarding(Split neutral grounding)per span excluding of stay set erection
107Providing of 4 wire flat guarding per span excluding of stay set erection
108Providing of Craddle guarding including earthing and earth pit excavation per span excluding of stay set erection
109Erection of street light fittings 2 feet/4 feet (All materials supplied by the Board) Labour alone.
110Erection of cross bracing set 10\" / 15\" Structure - DP Structure
111Erection of cross bracing set 10\" / 15\" Structure - TP Structure
112Erection ofTop Channels 10\" / 15\" Structure - DP Structure
113Erection ofTop Channels 10\" / 15\" Structure - TP Structure
114Erection of33 KV centre rotating AB switch complete set
115Erection of11 KV centre rotating AB switch complete set
116Erection of Single phase spacer
117Erection of Three phase spacer
118Provision of jumper per phase for LT
119Provision of Jumper per phase for HT
120Provision of \"PA\" jumpers
121Loading of Metering Set
122Un loading of Metering Set
123Erection of Metering Sets - Up to 11KV metering set
124Erection of Metering Sets - Above 11KV metering set
125Loading of 7.5/8 metres pole (RCC/PSC)/Each
126Loading of9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each
127Unloading of 7.5/8 metres pole (RCC/PSC)/Each
128Unloading of 9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each
129Loading of Conductor drum of all sizes with conductor
130Loading of Conductor drum of all sizes without conductor
131Unloading of Conductor drum of all sizes with conductor
132Unloading of Conductor drum of all sizes without conductor
133Manufacturing of MS clamps at works spot as per requirement , including alteration by using 50 x 8 mm Flat (with material)
134Manufacturing of MS clamps at works spot as per requirement , including alteration by using 65 x 10 mm Flat (with material)
135Cutting of Channel/Flat/Angle
136Cutting of RSJ pole
137Cutting of Tubular pole
138Cutting of Rail pole
139Drilling of 5/8\", 3/8\", 1/\" Holes in Channels / Angles - Slot Holes
140Drilling of 5/8\", 3/8\", 1/\" Holes in Channels / Angles - Round Holes
141Fixing of Missing doors in MS Mini Pillar Box
142Fixing of Missing doors in MS 4 WayPillar Box
143Fixing of Missing doors in MS 6 WayPillar Box
144Fixing of Missing doors in MS 8 WayPillar Box
145Fixing of Missing doors in FRPPillar Box
146Provision of 2 Nos Hinges in all types of Pillar Box
147LABOUR CHARGES FOR MAINTENANCE WORK
148DP/TP Structure maintenance - Pole Mounted
149DT maintenance for various capacity
150Structure earthing wire redoing - Various capacity
151Replacement of Structure earthing in complete without material - Various Capacity
152DT structure Yard cleaning - Various Capacity
153Watering to earth pits
154Numbering of location including cost of paint and labour
155Maintenance of 8 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing.
156Maintenance of 6 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing.
157Maintenance of 4 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing.
158Maintenance of Mini Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing.
159Numbering of Pillar with feeder details including cost of paint and labour
160Maintenance of 11 KV ABS only at Structure.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
161Maintenance of 11 KV ABS only at SS.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
162Maintenance of 33 KV ABS at Structure(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
163Maintenance of 33 KV ABS at SS(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
164Cutting of big tree fouling on the line.
165Cutting of tree branches fouling on the line.
166Clearing of heavy bushes
167Jungle/bushes/velikathan clearence
168Set righting leanedHT/LT Poles at Pin Point Location
169Set righting leanedHT/LT Poles at Cut Point Location
170Re-sagging of HT Line -7/4.72 mm
171Re-sagging (HT/LT) Line 7/4.09 mm
172Re-sagging (HT/LT) Line7/3.35 mm
173Re-sagging (HT/LT) Line 7/2.59 mm
174DC of Single phase service
175DC of Three phase service
176RC of Single phase service
177RC of Three phase service
178LABOUR CHARGES FOR DISMANTLING WORK
179Dismantling of 7.5m/8.0m Poles
180Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles
181Dismantling of Stay set complete
182Dismantling of conductors including Coiling and Transporting from workspot to road side upto 7/3.35mm Conductor without transport
183Dismantling of conductors including Coiling and Transporting from workspot to road side above 7/3.35mm Conductor without transport
184Releasing of LT S ph \"X\" Arm/TI Fitting
185Releaasing of LT 3 ph \"X\" Arm
186Releasing of 3\" - 6\" \"V\" Cross Arm/Tapping channal/Guarding\"X\" Arm
187Releasing of 4\" - 6\" and\"V\" Cross Arm
188Releasing of5\"\"V\" Cross Arm
189Releasing of Distn.Tr. Only at field
190Dismantling of Transformer Structure materials - Up to 100 KVA
191Dismantling of Transformer Structure materials - Above 100 KVA
192Dismantling of 11KV AB Switch at Structure
193Dismantling of 33KV AB Switch at Structure
194Dismantling of H.G. fuse set
195Dismantling of HT LAS at DT Structure
196Dismantling of LT LAS at DT Structure
197Dismantling of Earth Pipe and Structure earthing complete
198Dismantling of 2 Sets Open type fuse unit with all wiring complete(including bus bar arrangement)
199Dismantling of cross bracing set
200Dismantling of Top Channel
201Dismantling of Guarding including Dismantling of cross arm per span
202Dismantling of Single ph service wire & re-effecting service including meter
203Dismantling of three ph service wire & re-effecting service including meter
204Breaking of RCC Damaged Poles after dismantling,releasing the grill including transporting to Road side
205Stacking materials/Scrap
206LABOUR CHARGES FOR ERECTION OF SINGLE POLE STRUCTURE
207Loading and Unloading of 9.0m Square Pole
208Excavation of Pole Pit
209Erection of 9.0m Square Pole
210Transporting of Square Pole from Road Side to Pole Pit
211Excavation of stay pit 0.95x0.60x1.5m
212Erection of Stay Set Complete
213Fixing of Single Pole Structure Material in complete shape
214Erection of 16 / 25 / 40 KVA Distribution Transformer
215Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough
216Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement.
217Sleeve concrete for stay set including all materials
218Erection of HT LAS (3 Nos)
219Erection of LT LAS (4 Nos)
220Erection of LT Wiring Kit (Double Open Type Circuit)
221Painting of single pole structure including iron materials double coat with materials
222Painting of single pole structure including iron materials double coatwithout materials
223Painting of Structure pole with Distemper including cost of material
224GST

AI Tender Summary

OUR REF NO 33592875
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 01-09-2022
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Labour Charges For Carrying Out Extension / Improvement / Oh Fault Rectification & Other Maintenance Works In Panchetty Sub-Division Of Ponneri Division In Chennai North Circle- 1 LABOUR CHARGES FOR ERECTION OF DOUBLE POLE STRUCTURE WITH DISTRIBUTION TRANSFORMER. 2 Excavation of Structure Pole Pit 2 x 3 x 1/6 th of height of pole 3 Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole 4 Transporting of 9.14 m poles from Road side to pole pit 5 Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement. 6 Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.DPDC channel, T.I. Fitting etc., in complete. 7 Excavation of stay pit 0.95x0.60x1.5m 8 Erection of Stay Set Complete 9 Sleeve concrete for stay set including all materials & cement 10 Erection of HG fuse set with transport 11 Erection of 11 KV AB switch complete set with transport 12 Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough 13 Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for DP Structure 14 Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for TP Structure 15 Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for Four Pole Structure 16 Erection of L.T.Open type fuse unit including cable jumpering upto the line. 17 Providing LT bus bar arrangementsin DT structure including fixing of cross arm and insulator. 18 Erection of H.T. jumpering in DP structure complete (150 * 3) 19 Erection of H.T. LAS(3 Nos) 20 Erection of L.T. LAS(4 Nos) 21 Erection of DT excluing loading and unloading using Crane - 63KVA/100KVA 22 Erection of DT excluing loading and unloading using Crane -Above 100 KVA 23 Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. Without Material 24 Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. - With Material 25 Painting of Structure pole with Distemper including cost of material 26 Loading and unloading of Distribution Transformer at site and store. (All Rating) 27 Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Upto 100 KVA 28 Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Above 100 KVA 29 LABOUR CHARGES FOR LAYING OF HT CABLE 30 Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Normal Road 31 Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Tar Road 32 Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,-Concrete Road 33 Loading and unloading of HT Cable including coiling and recoiling 34 Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 Km 35 Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 Km 36 Laying of 11KV 3 X 300 sq mm XLPE cable 37 Laying of 11KV 3 X 120 sq mm XLPE cable 38 Covering HT cable by cement V trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size onthe trough 39 Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. 40 Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 Km 41 Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 Km 42 LABOUR CHARGES FOR LAYING OF LT CABLE 43 Loading and unloading of LT Cable including coiling and recoiling 44 Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle upto 5 Km 45 Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle above 5 Km 46 Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. - Normal Road 47 Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Tar Road 48 Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Concrete Road 49 Laying of LT 4 x 240 sq.mm cable 50 Laying of LT 4 X 120 sq.mm cable 51 Laying of LT 4 X 25 sq.mm cable 52 Laying of LT 2 X 16 sq.mm cable 53 Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete. 54 LABOUR CHARGES FOR ERECTION OF PILLAR BOX 55 Erection of 4 / 6 Way pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc., 56 Erection of Mini pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,el. works, transportation, lead, lift etc., 57 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 8 Way Pillar Box 58 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 8 Way Pillar Box 59 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 6 Way Pillar Box 60 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 6 Way Pillar Box 61 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 4 Way Pillar Box 62 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 4 Way Pillar Box 63 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - Mini Pillar Box 64 Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - Mini Pillar Box 65 LABOUR CHARGES FOR DISMANTLING OF PILLAR BOX 66 Dismantling of old 4 / 6 / 8 Way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 67 Dismantling of old Mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. 68 LABOUR CHARGES FOR MISCELLANEOUS WORK 69 Excavation of pole pit (pit size 2x3x1/6th of the length of poles) for 7.5mtrs/8 mtrs pole 70 Erection of 7.5m / 8m RCC/RSJ/PSC pole and other poles 71 Excavation of pole pit (pit size 2x3x1/6th of the length of poles) for 9.14m Pole 72 Erection of 9.14m RCC/RSJ/PSC pole and other poles 73 Trasportation of pole of all sizes from Road side to work spot 74 Trasportation of pole of all sizes from Stores to Road side upto 2KM 75 Trasportation of pole of all sizes from Stores to Road side upto Above 2 Km 76 Base concerting 30 cm thick for one pole including of all materials 77 Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa upto 10 Km 78 Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa Above 10 Km 79 Erection of V cross arm 3 1/2size 80 Erection of V cross arm41/2 size 81 Erection of Tapping channel 5 size / V Cross Arm 5 size 82 Excavation of stay pit 83 Erection of stay set complete 84 Fixing of 11 KV TI fitting 85 Fixing of 33 KV TI fitting 86 Fixing of LT 3 phase cross arm 87 Fixing of LT TI fitting 88 Fixing of single phase cross arm 89 LT pin insulator with pin 90 LT shackle with strap sets 91 11 KV pin insulator with GI pin 92 33 KV pin insulator with GI pin 93 11 KV strain disc with metal parts 94 33 KV strain disc with metal parts 95 Fixing of Aluminium knob 96 Fixing of caution / Danger Board 97 Providing of fly stay (excluding pole erection and earth excavation) 98 Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 7.5m/8m Pole 99 Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 9.14 metres pole (with coping of 1 dia upto height of 1.1/2 above ground level) Pole 100 Earthing of poles 101 Paving out conductor, stringing and sagging of line of 7/2.59mm ACSR / 7/2.50 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 102 Paving out conductor, stringing and sagging of line of 7/3.35mm ACSR / 7/3.15 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 103 Paving out conductor, stringing and sagging of line of 7/4.09mm ACSR Racoon conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 104 Paving out conductor, stringing and sagging of line of 7/4.72mm Dog conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. 105 Numbering of location/each including cost of paint and labour 106 Providing of 2 wire flat guarding(Split neutral grounding)per span excluding of stay set erection 107 Providing of 4 wire flat guarding per span excluding of stay set erection 108 Providing of Craddle guarding including earthing and earth pit excavation per span excluding of stay set erection 109 Erection of street light fittings 2 feet/4 feet (All materials supplied by the Board) Labour alone. 110 Erection of cross bracing set 10 / 15 Structure - DP Structure 111 Erection of cross bracing set 10 / 15 Structure - TP Structure 112 Erection ofTop Channels 10 / 15 Structure - DP Structure 113 Erection ofTop Channels 10 / 15 Structure - TP Structure 114 Erection of33 KV centre rotating AB switch complete set 115 Erection of11 KV centre rotating AB switch complete set 116 Erection of Single phase spacer 117 Erection of Three phase spacer 118 Provision of jumper per phase for LT 119 Provision of Jumper per phase for HT 120 Provision of PA jumpers 121 Loading of Metering Set 122 Un loading of Metering Set 123 Erection of Metering Sets - Up to 11KV metering set 124 Erection of Metering Sets - Above 11KV metering set 125 Loading of 7.5/8 metres pole (RCC/PSC)/Each 126 Loading of9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each 127 Unloading of 7.5/8 metres pole (RCC/PSC)/Each 128 Unloading of 9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each 129 Loading of Conductor drum of all sizes with conductor 130 Loading of Conductor drum of all sizes without conductor 131 Unloading of Conductor drum of all sizes with conductor 132 Unloading of Conductor drum of all sizes without conductor 133 Manufacturing of MS clamps at works spot as per requirement , including alteration by using 50 x 8 mm Flat (with material) 134 Manufacturing of MS clamps at works spot as per requirement , including alteration by using 65 x 10 mm Flat (with material) 135 Cutting of Channel/Flat/Angle 136 Cutting of RSJ pole 137 Cutting of Tubular pole 138 Cutting of Rail pole 139 Drilling of 5/8, 3/8, 1/ Holes in Channels / Angles - Slot Holes 140 Drilling of 5/8, 3/8, 1/ Holes in Channels / Angles - Round Holes 141 Fixing of Missing doors in MS Mini Pillar Box 142 Fixing of Missing doors in MS 4 WayPillar Box 143 Fixing of Missing doors in MS 6 WayPillar Box 144 Fixing of Missing doors in MS 8 WayPillar Box 145 Fixing of Missing doors in FRPPillar Box 146 Provision of 2 Nos Hinges in all types of Pillar Box 147 LABOUR CHARGES FOR MAINTENANCE WORK 148 DP/TP Structure maintenance - Pole Mounted 149 DT maintenance for various capacity 150 Structure earthing wire redoing - Various capacity 151 Replacement of Structure earthing in complete without material - Various Capacity 152 DT structure Yard cleaning - Various Capacity 153 Watering to earth pits 154 Numbering of location including cost of paint and labour 155 Maintenance of 8 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 156 Maintenance of 6 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 157 Maintenance of 4 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 158 Maintenance of Mini Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing. 159 Numbering of Pillar with feeder details including cost of paint and labour 160 Maintenance of 11 KV ABS only at Structure.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 161 Maintenance of 11 KV ABS only at SS.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 162 Maintenance of 33 KV ABS at Structure(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 163 Maintenance of 33 KV ABS at SS(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 164 Cutting of big tree fouling on the line. 165 Cutting of tree branches fouling on the line. 166 Clearing of heavy bushes 167 Jungle/bushes/velikathan clearence 168 Set righting leanedHT/LT Poles at Pin Point Location 169 Set righting leanedHT/LT Poles at Cut Point Location 170 Re-sagging of HT Line -7/4.72 mm 171 Re-sagging (HT/LT) Line 7/4.09 mm 172 Re-sagging (HT/LT) Line7/3.35 mm 173 Re-sagging (HT/LT) Line 7/2.59 mm 174 DC of Single phase service 175 DC of Three phase service 176 RC of Single phase service 177 RC of Three phase service 178 LABOUR CHARGES FOR DISMANTLING WORK 179 Dismantling of 7.5m/8.0m Poles 180 Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles 181 Dismantling of Stay set complete 182 Dismantling of conductors including Coiling and Transporting from workspot to road side upto 7/3.35mm Conductor without transport 183 Dismantling of conductors including Coiling and Transporting from workspot to road side above 7/3.35mm Conductor without transport 184 Releasing of LT S ph X Arm/TI Fitting 185 Releaasing of LT 3 ph X Arm 186 Releasing of 3 - 6 V Cross Arm/Tapping channal/GuardingX Arm 187 Releasing of 4 - 6 andV Cross Arm 188 Releasing of5V Cross Arm 189 Releasing of Distn.Tr. Only at field 190 Dismantling of Transformer Structure materials - Up to 100 KVA 191 Dismantling of Transformer Structure materials - Above 100 KVA 192 Dismantling of 11KV AB Switch at Structure 193 Dismantling of 33KV AB Switch at Structure 194 Dismantling of H.G. fuse set 195 Dismantling of HT LAS at DT Structure 196 Dismantling of LT LAS at DT Structure 197 Dismantling of Earth Pipe and Structure earthing complete 198 Dismantling of 2 Sets Open type fuse unit with all wiring complete(including bus bar arrangement) 199 Dismantling of cross bracing set 200 Dismantling of Top Channel 201 Dismantling of Guarding including Dismantling of cross arm per span 202 Dismantling of Single ph service wire & re-effecting service including meter 203 Dismantling of three ph service wire & re-effecting service including meter 204 Breaking of RCC Damaged Poles after dismantling,releasing the grill including transporting to Road side 205 Stacking materials/Scrap 206 LABOUR CHARGES FOR ERECTION OF SINGLE POLE STRUCTURE 207 Loading and Unloading of 9.0m Square Pole 208 Excavation of Pole Pit 209 Erection of 9.0m Square Pole 210 Transporting of Square Pole from Road Side to Pole Pit 211 Excavation of stay pit 0.95x0.60x1.5m 212 Erection of Stay Set Complete 213 Fixing of Single Pole Structure Material in complete shape 214 Erection of 16 / 25 / 40 KVA Distribution Transformer 215 Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completewith trough / w.o. trough 216 Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement. 217 Sleeve concrete for stay set including all materials 218 Erection of HT LAS (3 Nos) 219 Erection of LT LAS (4 Nos) 220 Erection of LT Wiring Kit (Double Open Type Circuit) 221 Painting of single pole structure including iron materials double coat with materials 222 Painting of single pole structure including iron materials double coatwithout materials 223 Painting of Structure pole with Distemper including cost of material 224 GST
Basic Detail
Tender No OT-48/2022-23
Bidding Type Tender
Location
City ponneri
State Tamil Nadu
Key Dates
Publish Date 20 Aug 2022
Submission Date 01 Sep 2022
Open Date 02 Sep 2022
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 25000
Exemption Not Available
Document List
89832916-1d05-49b1-a43a-66b546d70c7f.html
BOQ_293538.xls
OT48PNJMTNCE.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 20, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 01, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 02, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

89832916-1d05-49b1-a43a-66b546d70c7f.html

xls

BOQ_293538.xls

pdf

OT48PNJMTNCE.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders