Supply Of Scr Construction Organization- Guntakal Division- Final Location Surveys For Proposed Byepass Line At Guntakal Connecting Bellari-Nancherla ( 21 Km ) , For Proposed New Line With Rail Over Rail Between Guntakal West And Mallappa Gate Stations
Tender Overview
Project Description
Supply Of Scr Construction Organization- Guntakal Division- Final Location Surveys For Proposed Byepass Line At Guntakal Connecting Bellari-Nancherla ( 21 Km ) , For Proposed New Line With Rail Over Rail Between Guntakal West And Mallappa Gate Stations ( 12.00 Km ) & For Proposed Byepass Line Between Guntakal End And Nandyal End At Yerraguntla ( 5.50 Km ) ( Total Project Length 38.50 Km ) - Fixing Of Alignment, Pegging Out Centre Line, Taking Levels, Finalization Of Land Requirement ( Survey Number Wise ) , Soil Investigations, Geological Investigations For Bridges By Drilling Bore Holes, Collecting Samples, Calculation Of Water-Way Requirement For All The Proposed Bridges And Preparation Of Gads For Bridges, Station Yards, Project Sheets And Preparation Of Detailed Estimate Etc.Scr Construction Organization- Guntakal Division- Final Location Surveys For Proposed Byepass Line At Guntakal Connecting Bellari-Nancherla ( 21 Km ) , For Proposed New Line With Rail Over Rail Between Guntakal West And Mallappa Gate Stations ( 12.00 Km ) & For Proposed Byepass Line Between Guntakal End And Nandyal End At Yerraguntla ( 5.50 Km ) ( Total Project Length 38.50 Km ) - Fixing Of Alignment, Pegging Out Centre Line, Taking Levels, Finalization Of Land Requirement ( Survey Number Wise ) , Soil Investigations, Geological Investigations For Bridges By Drilling Bore Holes, Collecting Samples, Calculation Of Water-Way Requirement For All The Proposed Bridges And Preparation Of Gads For Bridges, Station Yards, Project Sheets And Preparation Of Detailed Estimate Etc.,
BOQ
| Sl. No. | Item Description |
| 1 | Scr Construction Organization- Guntakal Division- Final Location Surveys For Proposed Byepass Line At Guntakal Connecting Bellari-Nancherla (21 Km), For Proposed New Line With Rail Over Rail Between Guntakal West And Mallappa Gate Stations (12.00 Km) & For Proposed Byepass Line Between Guntakal End And Nandyal End At Yerraguntla (5.50 Km) (Total Project Length 38.50 Km) - Fixing Of Alignment, Pegging Out Centre Line, Taking Levels, Finalization Of Land Requirement (Survey Number Wise), Soil Investigations, Geological Investigations For Bridges By Drilling Bore Holes, Collecting Samples, Calculation Of Water-Way Requirement For All The Proposed Bridges And Preparation Of Gads For Bridges, Station Yards, Project Sheets And Preparation Of Detailed Estimate Etc. |
| 2 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender