Newly Water Supply Scheme At Parola Tq.Hingoli Dist. Hingoli Under Jal Jeevan Mission ( Jjm )
Tender Value
64.65 Lakhs
Estimated cost
Bid Submission
24 Aug 2022
0 days left
EMD
64653
Bank guarantee accepted
Document Fee
5600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
parola → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Newly Water Supply Scheme At Parola Tq.Hingoli Dist. Hingoli Under Jal Jeevan Mission ( Jjm )
BOQ
| Sl. No. | Item Description |
| 1 | EXISTING PERCOLATION WELL DEEPENING 9 MFROM 9 TO 18 M, DIAMETER = 6 M Excavationin generalinhard material comprisingofsoftrock,hardrock,Manjara rock,etc,byblasting/controlledblasting,chisellingasrequiredinwetordry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including baricading, guarding, disposingoffsurplusexcavatedstuffwithinaradiusof0.5km.asdirectedby Engineer-in-charge, excluding refillingAdd for each additional lift of 1.5 M beyond initial lift 1.5 M.Lift 9.00to 10.50 M |
| 2 | Lift 10.50to 12.00 M |
| 3 | Lift 12.00to 13.50 M |
| 4 | Lift 13.50to 15.00 M |
| 5 | Lift 18.00 to 19.50 M |
| 6 | Lift 16.50 to 18.00 M |
| 7 | Providing and fixing in position M.S.ladder 0.50 M wide consisting of 75 x10 mm M.S. flats as stringers and 16mm dia M.S. bars in double rows assteps placed at 25 cm c/c including costof material and labour involved,welding, anchoring and applying 3 coatsof anticorrosive paint, etc. complete asdirected by Engineer-in-charge(MJP SSR 2021-22 Item No. PG .217. Item No. 5) |
| 8 | Dewateringtheexcavatedtrenchesandpoolsofwaterinthe buildingtrenches/ pipeline trenches,well works by using pumps and other devices including disposing offwatertosafedistanceasdirectedbyEngineer-in-charge(includingcostof machinery, labour, fuel), etc. complete.7.5 BHP pumps daily 8 hrs for 40 daysMJP SSR 2021-22 Item No. 6.a PG. No. 229 |
| 9 | Taking Horizontal Bore of 115 mm Dia. In wells each length 30 mWell No.(1x4x30)GSDA DSR 21-22 P NO.1l No. A1 |
| 10 | Carrying out recuperation/ yield test for asserting the discharge of constructed well/ excavated profile as directed by Engineer-incharge. The test is carried out by drawing down water from the well/profile below normal/ subsoil water level upto full depth rise in water level is recorded. The normal water level/ subsoil water level in the well/ profile as well as stainer/ suction level at pump as per design of W.S. scheme shall be recorded prior to the test including cost of all materials, overhead, labourers, etc. completed as directed.Lps less than 25,000MJP SSR 2021-22 Item No. 17PG. No. 231 |
| 11 | Surface Vertical Borewell near Existing wellas per Borewell RA |
| 12 | PUMPING MACHINARY 5 BHP (100% STANDBY)Providing, erecting and giving tests of submersible pump set confirming to IS 8034 and motor confirming to IS 9283, with water proof winding and discharge with stainless steel shaft. Mortar suitable for working on 415 V = 10% 3 phase 50 Hz A.C. supply with cable guard, thrush carbon/fible bearing to withstand entire hydraulic thrust with suitable suction strainer, pump should have suitable discharge outlet as per manufacture\"s design. Antithrust streamlined run and 2 pairs of erection clamps 80 mm width non return valve.Submersible pump 100 & 150 mm dia (with bronze impeller upto 8 stages).Ex. Well to Exist. ESR/Prop. ESRProvide duplicate set of Submersible Pump capable of discharging 8609 litres/hour against a total head 65 M be driven by5.B.H.P. electrical motor directly coupled to it.One pump will be in operation and One pump will be standby. |
| 13 | Provide 3 B.H.P Submersible pump of Impeller/propeller 100mm Dia. Of Discharge 3000 Ltr. For borewell(MJP Mech. CSR 2021-22 P.no.2PM1-2-12) |
| 14 | Providing and Fixing L.T. skeleton panel board upto 5 HP. (As per detail sheet attached) |
| 15 | Supplying and erecting flat flexible 3 core 6 sq mm PVC sheathed submersible type copper cable suitably clamped at fixed intervals with column pipe assembly complete.(PWD Elect. CSR 2021-22 P. No. 218 I. No. 12-4-10) |
| 16 | Providing & erecting ISI mark G.I. pipeof followingclassanddia. including all local and central taxes, octroi, inspection charges, transportation to stores, etc. complete65 mm dia (heavy) on well(MJP CSR 2021-22 P. No. 82 l. No. 1.III.1.c.vii) |
| 17 | Providing and supplying ISI standard CI double flanged pipes excluding GST levied by GOI & GOM in all respect including railway freight, insurance, unloading from railway wagon, loading into truck transport to stores, unloading etc. complete as directed by Engineer-in-charge.\"100 MM(MJP CSR 2021-22 P. No. 72 l. No. 5) |
| 18 | Providing, supplying and fixing ISI mark CI D/F Reflux valve (non-return valves of following dia including all taxes (central and local), railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental store/site, unloading, stacking etc. complete. Reflux valves as per I.S. 5312 part I (1984) a) Without bypass arrangement - PN - 1 100 MM (MJP CSR 2021-22 P. No. 204, 214 l. No. 1Aiii, 4iii) |
| 19 | Providing and fixing double flanged sluice valve confirming for IS-2096/14846 including worn gear arrangements as per test pressure stainles steel spindle, caps including all taxes transportation etc complete.a) Sluice valve - PN - 1(Without bypass)100 mm dia (MJP CSR 2021-22 P. No.132l. No. 2Aiii) |
| 20 | Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.)a) Reflux valve/Sluice valve -- PN - 1(Without bypass)100 mm dia |
| 21 | b) Reflux valve/Sluice valve - PN - 1(Without bypass)150 mm dia(MJP CSR 2021-22 P. No.132l. No. 2Aiii) |
| 22 | Providing and erecting pressure gauge of required capacity complete with syphon tube, isolating cock suitable for 12mm dia GI pipe. Pressure gauge shall be installed as directed, with tapping on rising main pressure gauge (100 mm dia)(MJP Mech. CSR 2021-22 P. No.7 PM11-1) |
| 23 | Providing earthing with galvanized iron earth plate size 60 x60 x 0.6 cm with funnel with a wire mesh for watering and brick masonry block C.l. cover complete with all materials, testing & recording the results as per specification no. EA-EP.Plate type Electrode (IS 3043)1. For panel board- 1No.(PWD Elec. CSR 2021-22 Item No. 9-1-1) |
| 24 | Providing and supplying ISI standard CI Flanged/ S&S specials including all taxes (Central and local), railway freight, insurance, unloading from railway wagon, loading into truck transport to departmental store/site, unloading stacking etc. complete.CI D/F specials i) 80 to 300 mm dia (MJP CSR 2021-22 Section-I(I) P. No. 72 l. No. 6ai) |
| 25 | RISING MAIN Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipessuitable for potable water with solvent cementjoints including cost of couplers, as per ISspecification no. 4985 / 1988 excluding GSTlevied by GOI and GOM in all respect, includingtransportation, freight charges, inspectioncharges, loading, unloading, conveyance to thedepartmental stores and stacking the same inclosed shed duly protected from sun rays andrains including cost of jointing material i.e.solvent cement, etc. complete (selffit type to bejointed with cement solvent).RM(90 MM PVC PN6 PIPE) |
| 26 | RM(75 MM PVC PN 6 PIPE)MJP SSR Section I (II) Page No. 76 Revised rate SSR 2021-22 Corrigendum 07 |
| 27 | Providing and supplying ISI standard pvc specials & fittings including transportation to stores/ site,loading,unloadingchargesexcludingGSTleviedby GOI & GOM,etc. complete. |
| 28 | Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below.100 mm dia GI PIPE B ClassFor Nalla(MJP SSR 2021-22 P. No 82 I.No 1b) |
| 29 | 100 mm dia GI PIPE B Class For Road |
| 30 | ( 5% For specials of pipe cost) |
| 31 | Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, excluding GST lev-ied by GOI & GOM in all respect including inspection charges, transport to departmental stores, unloading and stacking etc. complete as per IS-458/1988.Note :One collar should be supplied with each full length plain ended RCC pipe, cost including in rates below. One rubber ring should be supplied with each full length of socketed pipe, cost included in rates below.200 mm RCC Class \"NP-III\" Pipe(MJP SSR 2021-22 P. No 96,97 I.No 1) |
| 32 | Providing and supplying Islmark CI D/F reflux valves (non-return valves ) of following dia including all taxes (Central and Local), railway freight, inspection charges unloding from railwaywagon,loadinginto truck, transportation upto departmentalstroes/ site, unloading, stacking etc. complete.Reflux valves as per I.S.5312 Part I (1984)Without by pass arrangement - PN -180 mm diaMJP SSR Section I(XII) 2aii) Page No. 132 |
| 33 | 100 mm dia |
| 34 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOt & GOM in all respect etc. complete Sluice valves PN-1 without bye-pass arrangement 80 mm dia. Sluice valve(MJP SSR P No. 132 Section I(XII) 2a.iv) |
| 35 | 100 mm dia. Sluice valve (MJP SSR P No. 132 Section I(XII) 2a.iv) |
| 36 | Providingandsupplying Air Valvesas per IS-10845and MJP’s standard specificationsdoubleorificetypecombinedwithscrewdownisolatingvalve,small orificeelasticballrestingonagunmetalorificenipple,largeorificevulcaniteball seatingon mouldedseatring,inletfaceanddrilled,includingall taxes(Centraland local), insurance, third party inspection charges, loading, unloding, transportatoin upto departmental stores / site, etc. complete. a) Air Valve Single Ball Flanged Type - PN -132 mm diaMJP SSR Section I(XII) 5a-1iv) Page No. 136 |
| 37 | \"Providing and supplying Islmark CI D/F reflux valves (non-return valves ) of following dia including all taxes (Central and Local), railway freight, inspection charges unloding from railwaywagon,loadinginto truck, transportation upto departmentalstroes/ site, unloading, stacking etc. complete.Reflux valves as per I.S.5312 Part I (1984)Without by pass arrangement - PN -1\"80 mm dia |
| 38 | Excavationfor foundation/ pipe trenchesin hard murumand boulders,W.B.M. road includingremovingthe excavatedmaterialupto a distanceof 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatreing, preparing the bed for foundation and excluding backfilling, etc. complete.Lift 0 to 1.5 M MJP DSR 2021-22 SECTION- E Sr.No.2 pg.no.42 |
| 39 | Excavationfor foundation/ pipe trenchesin soft rock&old cement& lime masonary foundation,asphaIt raod includingremoving the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift 0 to 1.5 MMJP DSR 2021-22 SECTION- E Sr.No.5 pg.no.42 |
| 40 | Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259)Lift 0 to 1.5 MMJP DSR 2021-22 Section E Sr.No.7 Pg.No.43 |
| 41 | Filling inplinth floors murum bedding intrenches with approved murum from excavatedmaterialsfromfoundation15to20cmlayersincludingwateringand compaction complete.Murum selected from excavated stuffMJP DSR 2021-22 SECTION- E Sr.No.16 pg.no.45 |
| 42 | Lowering Laying and jointing with P.V.C pipes and specials of following class and diameter including cost of conveyance from source to site of works including cost of all labour,material,except cement solvent,rubber ring,as per IS code etc.complete (with cement solvent joint/ring fit joint).90MMPN 6MJP SSR Section I (II) Page No. 81 |
| 43 | 75 MMPN 6 |
| 44 | Hydraulic testing of PVC pipe line to specified pressure includingcost of all materials and labour and water for testing for specified length including cutting, placing end cap makingarrangement forfillingsafewaterusingreciprocatingtypepumpswhich shouldbeabletoprovidespecified testpressuregaugesandothernecessary equipments,labour,operationcharges,etc. requiredfor testing.The rate underthis itemshallalsoincludecostofretesting,ifnecessaryandreinstatingtooriginal position90 MMPN6 |
| 45 | 75 MMPN 6 |
| 46 | Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.Well to ESR100 mm dia GI PIPE B Class For Nalla |
| 47 | 100 mm dia GI PIPE B Class For Road (MJP SSR 2021-22 P No.83 I.No.2b/c) |
| 48 | Hydraulic testing of G. I. pipe line to specified pressure including cost of all materials and labour and water for testing for the length upto 1km using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour operation charges etc. required for testing, The rates under this item shall also include cost of retesting if necessary and reinstating to original postion.Well to ESR100 mm dia GI PIPE B ClassFor Nalla/ Road(MJP SSR 2021-22 P No.83 I.No.2b/c) |
| 49 | 100 mm dia GI PIPE B Class For Road |
| 50 | Lowering, laying and jointing RCC pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.200 mm RCC Class \"NP-III\"Pipe(MJP SSR 2021-22 P No.98 I.No.2) |
| 51 | Lowering, laying, jointing in positionfollowing CI/DF Reflux, butterfly valves and sluice valves including cost of all labors jointing material including nutbolts and giving satisfactory hydraulic testing etc complete ( Rates for all class of valves )80 mm dia |
| 52 | 80 mm dia. Sluice valve |
| 53 | 100 mm dia |
| 54 | 100 mm dia. Sluice valve |
| 55 | Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete, 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M-150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve tee, etc. complete as per type design and as directed by Engineer -in- charge for following diameters of pipe lines (type design attached.)32 mmMJP DSR 2021-22 Item No. 10.a.iv Sec. I (XII)pg.no.137 |
| 56 | Refillingthetrenches withavailableexcavated stuffwithsoftmaterialfirstover pipelineandthenhardmaterialin15cmlayerswithallleadsandliftsincluding consolidation, surcharging,etc. complete.Net Volume of RefillingMJP DSR 2021-22 Item No. 1 A,BSec. Gpg.no.49 |
| 57 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum)For Road ReconstructionPCC M150 MJP DSR 2021-22 Item No. 16 Sec.G pg.no.49 |
| 58 | ProvidingandconstructingB.B.masonryvalvechamberwith15cmthick1:2:4 proportionPCCbedding,excludingexcavation,B.B. masonryin C.M. 1:5 Proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge.As above of 60x45cm internal size and depth upto 0.9 m with precast R.C.C slab and cover.MJP DSR 2021-22 Item No. 1 A,B Sec. I (XX)pg.no.220 |
| 59 | RCC GSR 33000 LITRES Designing (aesthetically), and constructing RCC ground service reservoirs / RCC sumps in M-300 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab top RCC roof slab / or dome, 20 mm thick cement plaster with water proofing compound in CM 1:3 proportion to inside face of the container, including epoxy paint from inside including refilling and disposing of surplus stuff within lead of 50 M, all labourand material charges, for laying and jointing of pipe assembly for inlet, outlet washout, over flow and bypass arrangement consisting of C.I. M.S. D/F. pipes, specials and valves of given diameters, providing and fixing accessories such as M.S. ladder inside and outside, C.I. Manhole frame and cover, water top slab, B.B. masonry chamber for all valves, ventilating shafts, including giving satisfactory hydraulic test and water tightness test as per IS code and providing three coats of cement paints to all exposed surface of structure including roof surface etc. complete as per design data, criteria, obligatory requirements and detailed specifications. Anti-termite treatment shall be given for underground portion of the structure. |
| 60 | Providing & supplying ISI standard CI double flanged pipes excluding GST levied by GOI & GOM in all respect including railway freight, insurance , unloading from railway wagon, loading into truck transport to stores, unloading etc. complete as directed by Engineer-in-charge. Inlet 100 mm dia |
| 61 | Outlet100 mm dia.CI.D./F pipes |
| 62 | Overflow100 mm dia.CI.D./F pipes |
| 63 | Washout100 mm diaCI.D./F pipes(MJP SSR P No. 72 Section I(I)5.ii/iv) |
| 64 | Providing and supplying ISI standard C. I. specials & fitting with sealing rubber gasket of S.B.R,complete with cast iron follower gland and M.S. nut holts coated or otherwise protected from rusting and suitable for D.l.pipes including cost of labour, materials, and transpoffation to stores, loading and unloading excluding GST levied by GOI & GOM in allrespect etc. complete as per IS-9523.80 mm to 300 mm dia(MJP SSR P No. 73 Section I(I) 4.iv/vi) |
| 65 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOt & GOM in all respect etc. completeSluice valves PN-1 without bye-pass arrangement100 mm dia. Sluice valve - Outlet/Distribution |
| 66 | 100 mm dia.. Sluice valve - Inlet/Bypass |
| 67 | 100 mm dia. Sluice valve - Washout(MJP SSR P No. 132 Section I(XII) 2a.iv) |
| 68 | DISTRIBUTION SYSTEM Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no. 4985 / 1988 excluding GST levied by GOI and GOM in all respect, including transportation, freight charges, inspection charges, loading, unloading, conveyance to the departmental stores and stacking the same inclosed shed duly protected from sun rays and rains including cost of jointing material i.e.solvent cement, etc. complete (self fit type to be jointed with cement solvent).75 mm dia |
| 69 | 90 mm dia |
| 70 | 110 mm dia MJP SSR 2021-22 (Revised) Section I (II) Page No. 76 |
| 71 | Providing and supplying ISI standard PVC & GI specials and fittings including transportation to stores/site, loading, unloading charges excluding GST levied by GOI & GOM, etc. complete.5% of cost of pipes |
| 72 | Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004.Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below65 mm dia. GI PIPE B class |
| 73 | 80 mm dia. GI PIPE B class |
| 74 | 100 mm dia. GI PIPE B class MJPDSR-2021/22 Sec.I (XI) Pg.No 82 Item No. 2a |
| 75 | 5% of cost of pipesMJPDSR-2021/22 Sec.I (XI) Pg.No 82 Item No. 2a |
| 76 | Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, excluding GST lev-ied by GOI & GOM in all respect including inspection charges, transport to departmental stores, unloading and stacking etc. complete as per IS-458/1988. One collar should be supplied with each full length plain ended RCC pipe, cost including in rates below. One rubber ring should be supplied with each full length of socketed pipe, cost included in rates below.300 mm Dia. RCC NP III PIPESMJP DSR 2021-22 SECTION- I(V)pg.no.97 |
| 77 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOt & GOM in all respect etc. complete.Without by pass arrangement - PN-1.100 mm sluice valveMJPDSR-2021/22 Sec.I (XI) Pg.No132 Item No. 2a |
| 78 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation andexcluding backfilling, etc. complete. (Bd-A-1/259) Lift 0 to 1.5MJP DSR 2021-22 Section E Sr.No.1 Pg. No. 43 |
| 79 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift 0 to 1.5MJP DSR 2021-22 Section E Sr.No.2 Pg. No.42 |
| 80 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift 0 to 1.5MJP DSR 2021-22 Section E Sr.No.5 Pg.No.42 |
| 81 | Excavation for foundation / pipe trenches in Hard rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift 0 to 1.5MJP DSR 2021-22 Section E Sr.No.7 Pg.No.43 |
| 82 | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction complete.Murum selected from excavated stuffMJP DSR 2021-22 Section E Sr.No.16 Pg.No.45 |
| 83 | Lowering Laying and jointing with P.V.C pipes and specials of following class and diameter including cost of conveyance from source to site of works including cost of all labour,material,except cement solvent,rubber ring,as per IS code etc.complete (with cement solvent joint/ring fit joint)Working Pressure 4 kg/cm275 mm dia |
| 84 | 90 mm dia |
| 85 | 110 mm dia MJP DSR 2021-22 Section I(II) Sr.No.4 Pg. No.80 |
| 86 | Hydraulic testing of PVC pipe line to specified pressure including cost of allmaterials and labour and water for testing forspecified length including cutting, placing endcap making arrangement for filling safe waterusing reciprocating type pumps which shouldbe able to provide specified test pressuregauges and other necessary equipments,labour, operation charges, etc. required fortesting. The rate under this item shall alsoinclude cost of retesting, if necessary andreinstating to original position.75 mm dia |
| 87 | 90 mm dia |
| 88 | 110 mm dia |
| 89 | Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.65 mm dia. GI PIPE C class |
| 90 | 80 mm dia. GI PIPE C class |
| 91 | 100 mm dia. GI PIPE C class |
| 92 | Hydraulic testing of G. I. pipe line to specified pressure including cost of all materials and labour and water for testing for the length upto 1km using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour operation charges etc. required for testing, The rates under this item shall also include cost of retesting if necessaryand reinstating to original postion.65 mm dia. GI PIPE B class |
| 93 | 80 mm dia. GI PIPE B class |
| 94 | 100 mm dia. GI PIPE B class |
| 95 | Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge (For all class of pipes.) as per IS- 783-1985.300 MM RCC Class \"NP-III\" PIPEMJP SSR 2021-22, I.No 1.e.vii. Page No.97 |
| 96 | Lowering, laying, jointing in positionfollowing CI/DF Reflux, butterfly valves and sluice valves including cost of all labors jointing material including nutbolts and giving satisfactory hydraulic testing etc complete ( Rates for all class of valves )100 mm sluice valveMJP DSR 2021-22 Item No. 4a Sec. I (XII)pg.no.135 |
| 97 | Providing and fixing C.I. road box including loading, unloading and carting to site of work including all necessary excavation in all types of strata and fixing in murum packing, etc. complete225 mm x 300 mm (40 kg)MJP DSR 2021-22 Item No. 16 Sec.E pg.no.45 |
| 98 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete.Net volume of refillingMJP DSR 2021-22 Item No. 16 Sec.E pg.no.45 |
| 99 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum)For Road ReconstructionPCC M150 MJP DSR 2021-22 Item No. 16 Sec.G pg.no.49 |
| 100 | CHLORINATION ARRANGEMENTProviding and installing simplegravityfeed disinfection arrangement with TCL powder solution on the percolation well / service reservoir including solution tankfeeding pipe, dosing arrangement all other accessories giving tgrialand test etc. complete Drip Type Chlorinator 2 set |
| 101 | TRIAL & RUNITEM NO.1Commisioning running and maintaining the scheme to quantities, rate capacity, including manning necessory personnel such as operator, valveman, etc, as pr requirements of the scheme and who should also administer chemical dose for a period of one month for individual scheme together with training of personnel spared by MJP/ Local Body and handling over the scheme to Local Body after completion of the above period as directed by Engineer - in charge.For single village (3 Months) (M.J.P. SSR 21-22 P. No 232 I.No.1a) |
| 102 | WIRE FENCING ITEM NO.1Providing & erecting chain link fencing 1.6 Mtr height with GI chain link of size 50*50 mm 8 SWG thick and fixed 75 mm above GL vertical M.S. angle of 40*40*6 mm size embedded in cc block 1 :4 :8 mix of size 450*450*670 mm at 1.75 m centre to centre wiyh iron bar 16 mm dia as a hold fast including welded link with angle frame at 30 cm cenre to centre nuts & bolts & horizontal MS angle at top & bottom of 25 * 25* 5 mm size & vertical MS flat 35 * 5 mm & 25 * 5 mm horizontal including cross supports of 40 *40*6 mm angle both sides at every corner in cc with 3 coat of oil painting etc complete PWD SSR 2021-22 I.No 46.39 BDW P.No.217 |
| 103 | ITEM NO.2Providing and fixing M.S. gate 2.5 M wide for compound with 40 mm dia G.I. pipe, approved grill work, RCC M-150 side pillars of 25 cm x 40 cm x 2.5 M height, its foundation, finishing, painting, etc. complete.MJP SSR Section-H: Miscellaneous P.No.58 |
| 104 | ITEM NO.3Providing and fixing board displaying information, such as \"Name of work, Tender cost, Name of Contractor, Work completion and liability period etc\", having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in ChargePWD SSR 2021-22 I.No 288 ( 6.36) BDW P.No.47 |
| 105 | FUNCTIONAL HOUSEHOLD TAP CONNECTIONProviding and making UPVC/MDPE pipe consumer service connection on Distribution main by drilling hole with suitable means , including all labour , UPVC/MDPE Pipe of required length with or without Road crossing as described below, including cost of specials like Saddle/Clamp Saddle of suitable material, and diameter suitable for Distribution main, 15mm /20mm/ 25mm respective Dia Heavy duty Brass/Polyprophylyne(Twin Jacketed ) Ferrule , Male and Female thread adapter Elbow, Bends,couplers ,Tees, Clamps of suitable material and sundry materials as per requirment, including providing and fixing medium duty 15.mm brass bib tap, GI casing pipe of suitable diameter of 32mm/ 40mm/ 50mm respectively of required length for Road crossing, including requird labour for excavation in all types of strata up to the depth of 0.75m or as per site requirement,all types of plumbing fittings, refilling , Closing the water supply in that area, dewatering, hydraulic testing and restarting the water supply ,transportation of material etc. complete as directed by Engineer (With Road Crossing)For 15 mm Service connection |
| 106 | (Withought Road Crossing)For 15 mm Service connection |
AI Tender Summary
Tender Timeline
Aug 18, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedAug 24, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 25, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender