| 1 | Installlatiion & commissioning bal C&I |
| 2 | Installation of Fire Siren with Panel |
| 3 | Laying of cable 2Cx1.5 sqmm on cabletray |
| 4 | Laying of cable 2Cx2.5 sqmm on cabletray |
| 5 | Laying ofcable 2Cx1.5 sqmm thru saddle |
| 6 | Laying of cable 2Cx2.5 sqmm thru saddle |
| 7 | Laying of MICC 2cx1.5 Sqmm cable for CHP |
| 8 | Laying of MICC 2cx2.5 Sqmm cable CHP/CER |
| 9 | Laying of LHS cable along coal conveyor |
| 10 | Laying of LHS cable in cable galleries |
| 11 | Cable tray /gi installation with support |
| 12 | Installation of IR type heat detectors |
| 13 | Installation of DVLCP |
| 14 | Installation of Pressure Switches with v |
| 15 | Installation of Solenoid Valve for DV , |
| 16 | Limit switches with Termination |
| 17 | Installation ofDetectors with JB -Glan |
| 18 | Installation of Response Indicator |
| 19 | Installation of CT1 for other areas |
| 20 | Installation of CT1 for CHP area |
| 21 | Installation of Monitor Module CT2 |
| 22 | Installation of Control Module CR |
| 23 | Installation , Termination of MCP |
| 24 | Installation & commissioning of SM |
| 25 | Installation , termination of Hooter |
| 26 | Installation/Termination of Beam Detectr |
| 27 | Installation of SIGA-IM |
| 28 | 2Cx1.5 sqmm cable layng with saddleMCC1B |
| 29 | 2Cx2.5 sqmm cable layng withsaddle-MCC1B |
| 30 | Installation,termination of Hooter-MCC1B |
| 31 | Installation,Termination of MCP-MCC1B |
| 32 | Installation&commissioning of SM MCC1B |
| 33 | 2Cx1.5 sqmm cable layng ontray-MCC1D |
| 34 | 2Cx2.5 sqmm acable laying on tray-MCC1D |
| 35 | 2Cx1.5 sqmm cable layng thru saddle-MCC1 |
| 36 | 2Cx2.5 sqmm cable layig withsaddle MCC1D |
| 37 | Installation,termination of Hooter MCC1D |
| 38 | Installation,Termination of MCP-MCC1D |
| 39 | Installation &commissioning of SM-MCC1D |
| 40 | Installation ofDetectors with JB-MCC1D |
| 41 | Installation of Response Indicator-MCC1D |
| 42 | Installation , termination of Hooter WT3 |
| 43 | Installation,Termination of MCP WT3 |
| 44 | Installation &commissioning of SM WT3 |
| 45 | Installation of Detectors with JB WT3 |
| 46 | Installation of Response Indicator WT3 |
| 47 | LCP on stacker reclaimer with OWS |
| 48 | 2Cx1.5 sqmm cable laying-SR |
| 49 | 2Cx2.5 sqmm cable laying- power SR |
| 50 | Installation, termination of Hooter -SR |
| 51 | Installation,Termination of MCP SR |
| 52 | Installation &commissioning of SM SR |
| 53 | Installation of Detectors with JB SR |
| 54 | Installation,termination of Hooter FOPH |
| 55 | Installation,Termination of MCP FOPH |
| 56 | Installation&commissioning of SM FOPH |
| 57 | Installation of Detectors with JB FOPH |
| 58 | Installation of Response Indicator FOPH |
| 59 | Installation,termination of Hooter Foam |
| 60 | Installation,Termination of MCP Foam |
| 61 | Installation&commissioning of SM Foam |
| 62 | Installation of Detectors with JB FOAMPH |
| 63 | Installation of Response Indicator FoamP |
| 64 | 2Cx1.5 sqmm armoured cable laying AHP |
| 65 | 2Cx2.5 sqmm armoured cable laying AHP |
| 66 | 2Cx1.5 sqmm cable laying with saddle AHP |
| 67 | 2Cx2.5 sqmm cable laying with saddle AHP |
| 68 | Installation,termination of Hooter AHP |
| 69 | Installation,Termination of MCP AHP |
| 70 | Installation&commissioning of SM AHP |
| 71 | Installation ofDetectors with JB AHP |
| 72 | Installation of SIGA-IM AHP |
| 73 | Installation of Response Indicator AHP |
| 74 | 2Cx1.5 sqmm armoured cable laying CT |
| 75 | 2Cx2.5 sqmm armoured cable laying CT |
| 76 | 2Cx1.5 sqmm cable laying with saddle CT |
| 77 | 2Cx2.5 sqmm cable laying with saddle CT |
| 78 | Installation , termination of Hooter CT |
| 79 | Installation , Termination of MCP -CT |
| 80 | Installation&commissioning of SM - CT |
| 81 | Installation ofDetectors with JB -CT |
| 82 | Installation of SIGA-IM CT |
| 83 | Installation of Response Indicator CT |
| 84 | 2Cx1.5 sqmmcable laying Ex Air Comp MC |
| 85 | 2Cx2.5 sqmmcable laying Ex Air Comp MC |
| 86 | 2Cx1.5 sqmm cable laying with saddle EAC |
| 87 | 2Cx2.5 sqmm cable laying with saddle EAC |
| 88 | Installation,termination of Hooter EAC |
| 89 | Installation,Termination of MCP EAC MCC |
| 90 | Installation&commissioning of SM EAC |
| 91 | Installation of Detectors with JB EAC |
| 92 | 2Cx1.5 sqmm cable layng with saddle RWPH |
| 93 | 2Cx2.5 sqmm cable layng with saddle RWPH |
| 94 | Installation,termination of Hooter RWPH |
| 95 | Installation,Termination of MCP RWPH |
| 96 | Installation&commissioning of SM RWPH |
| 97 | Installation ofDetectors with JB RWPH |
| 98 | Installation of SIGA-IM RWPH |
| 99 | Installation of Response Indicator RWPH |
| 100 | 2Cx1.5 sqmm armoured cable laying CSSP |
| 101 | 2Cx2.5 sqmm armoured cable laying CSSP |
| 102 | 2Cx1.5 sqmm cable layng with saddle CSSP |
| 103 | 2Cx2.5 sqmm cable layng with saddleCSS |
| 104 | Installation,termination of Hooter CSSP |
| 105 | Installation,Termination of MCPCSSP |
| 106 | Installation&commissioning of SMCSSP |
| 107 | Installation ofDetectors with JB CSSP |
| 108 | Installation of SIGA-IMCSSP |
| 109 | Installation of Response Indicator CSSP |
| 110 | 2Cx1.5 sqmm cable laying H2 plant |
| 111 | 2Cx2.5 sqmmcable laying H2 plant |
| 112 | 2Cx1.5 sqmm cable layng with saddle H2 |
| 113 | 2Cx2.5 sqmm cable layng with saddle H2 p |
| 114 | Installation,termination of Hooter H2 pl |
| 115 | Installation,Termination of MCP H2 plant |
| 116 | Installation&commissioning of SM H2 plan |
| 117 | Installation ofDetectors with JB H2 pl |
| 118 | Installation of SIGA-IM H2 plant |
| 119 | Installation of Response Indicator H2 pl |
| 120 | 2Cx1.5 sqmm cable laying on tray-AudBu |
| 121 | 2Cx2.5 sqmm cable laying on tray-AudBuil |
| 122 | 2Cx1.5 sqmm cable laying on tray WSW |
| 123 | 2Cx2.5 sqmm armoured cable on tray SWS |
| 124 | Installation,termination of Hooter ESP-3 |
| 125 | Installation,Termination of MCP ESP-3 |
| 126 | Installation of Signal Module-CC1 ESP-3 |
| 127 | Installation of Detectors with JB ESP-3 |
| 128 | Installation ofDetectors with JB Aux B |
| 129 | Installation of Response Indicator Aux B |
| 130 | Installation,termination of Hooter Aux B |
| 131 | Installation,Termination of MCP Aux Boil |
| 132 | Installation,Termination of SIGA-IM AuxB |
| 133 | Installation of SM-CC1 Aux Boiler |
| 134 | Installation of Detectors with JB MCC1B |
| 135 | Installation of Response Indicator-MCC1B |
| 136 | Commissioning of erected C&I systems |
| 137 | Commissioning, Termination of Hooter WSW |
| 138 | Commissioning,Termination of MCP WSW |
| 139 | Commissioning & termination of SM WSW |
| 140 | Commissioningof Response Indicator WSW |
| 141 | Commissioning ofModule CT1 WSW |
| 142 | Commissning of Detectors withJB AudBuild |
| 143 | Commissning of Response Indicator AudBui |
| 144 | Commissning,termination of Hootr AudBuil |
| 145 | Commissning,termination of MCP AudBuild |
| 146 | Commissning of Signal Module AudBuild |
| 147 | Commissioning of Detectors CPU Build |
| 148 | Commissioning of RI CPU Build |
| 149 | Commissioning,termination of Hooter CPU |
| 150 | Commissioning,Termination of MCP CPU |
| 151 | Commissning of Signal Module-CC1 CPU |
| 152 | Commissioning of Detectors Adm Build |
| 153 | Commissioning of Resp.Indicator Adm Buil |
| 154 | Commissioningof Hooter Adm Build |
| 155 | Commissioning of MCP Adm Buildng |
| 156 | Commissioning of SM Adm Buildng |
| 157 | Commissioning,termination of Hooter SerB |
| 158 | Commissioning,Termination of MCP SerBuil |
| 159 | Commissioning of SM-CC1 Serv Build |
| 160 | Commissioning of Detectors Serv Build |
| 161 | Commissioning of Resp.Indicator Serv Bui |
| 162 | Commissioning,termination of Hooter LT-1 |
| 163 | Commissioning,Termination of MCP LTU-1 |
| 164 | Commissioningof SM-CC1 LT U1 |
| 165 | CommissioningofDetectors LT U1 |
| 166 | Commissioning,termination of Hooter HTU1 |
| 167 | Commissioning,Term. of MCP HTU1 |
| 168 | Commissioningof SM-CC1 HTU1 |
| 169 | CommissioningofDetectors HTU1 |
| 170 | Commissioning of Sol. Valve for DV U1 |
| 171 | Commissioning of Pressure Switches U1 |
| 172 | Commissioning of Limit Siwtches U1 |
| 173 | Commissioning of DLCP U-1 |
| 174 | Commissioning of CT1 U-1 |
| 175 | LHS cable commissioning Main plant &ESP |
| 176 | Commissioning of Monitor Module CT2 U1 |
| 177 | Commissioning of CR U-1 |
| 178 | Commissioning ofDetectors AHp |
| 179 | Commissioning,termination of Hooter AHP |
| 180 | Commissioning,Termination of MCP AHP |
| 181 | Commissioning of Signal Module-CC1 AHP |