Gas Control System With Gas Lines Supply And Installation Of Gas Control System With Gas Lines For Transfer Of Argon And Nitrogen Gas To Lab , Supply And Installation Of Gas Control System With Gas Lines For Transfer Of Argon And Nitrogen Gas To Lab (, trombay-Maharashtra

Directorate Of Purchase And Stores-DAE has published Gas Control System With Gas Lines Supply And Installation Of Gas Control System With Gas Lines For Transfer Of Argon And Nitrogen Gas To Lab , Supply And Installation Of Gas Control System With Gas Lines For Transfer Of Argon And Nitrogen Gas To Lab (. Submission Date for this Tender is 12-09-2022. Tanks and Cylinders Tenders in trombay Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

33534405
Gas Control System With Gas Lines Supply And Installation Of Gas Control System With Gas Lines For Transfer Of Argon And Nitrogen Gas To Lab , Supply And Installation Of Gas Control System With Gas Lines For Transfer Of Argon And Nitrogen Gas To Lab (
Open Tender
Indian
Maharashtra
trombay
12-09-2022

Tender Details

Gas Control System With Gas Lines Supply And Installation Of Gas Control System With Gas Lines For Transfer Of Argon And Nitrogen Gas To Lab , Supply And Installation Of Gas Control System With Gas Lines For Transfer Of Argon And Nitrogen Gas To Lab ( I ) High Pressure Gas Manifold System For Argon And Nitrogen Gas Cylinder With Pigtail ( 2Nos. ) ( Ii ) Cylinder Regulator With Fully S.S. Body With Ss 316 Diaphragm For Argon And Nitrogen Gas Inlet Pressure Gauge: 0-280 Kg / Cm2, Outlet Pressure Gauge: 0-14 Kg / Cm2, Outlet Connection : 1 / 8 & 1 / 4 Ferrule Fitting Inlet Connection : 5 / 8 Bsp Male ( Rht ) , Lht ( H2 ) ( 2Nos. ) ( Iii ) Suitable ¼” Ss Tubing 0.9Mm Thick With Color Coded Sleeves To Transfer Gas From The Cylinder To The Lab Facility ( ~ 100 Ft ) ( Iv ) Cylinder Cage With Suitable Mounting Brackets For Holding 3 Cylinders ( With Suitable Ss Braided Pigtail Of Suitable Length For Keeping Each Cylinder With Safety Ropes ) Inside The Cage. The Structure Should Have Ms Support Structure Bracket, Held Ms And Net For Proper Ventilation. It Should Have Door Opening From Outside.Size 3’X3’X1’ ( 2Nos ) ( V ) Genetic Valve With Pressure Gauge And Suitable Fittings For Outlet ( 2Nos. ) ( Vi ) 1 / 4“ , 1 / 8’’ Installation: Standard Fittings, Coupling, Clamps, Hardware As Well As Suitable Arrangement For The Transfer Of Gas From Cylinder To The Lab Facility Has To Be Carried Out By The Vender ( 1Pack ) , Exhaust System 3600Cfm With 40X40x6mm Ms Angel Frame With Protective Gi Mesh And Flap Cover , Work Stations Of Dimensions ( A ) ( Lxwxh~23”X30”X30” ) , ( B ) ( Lxwxh~12”X23”X42” ) , ( C ) ( Lxwxh~30”X65”X30” ) And ( D ) ( Lxwxh~8”X15”X45” ) Made Of 1Mm Or Thicker Gi Sheets Having Following Specifications ( I ) The Telescopic Drawer ( 3Nos ) Slide Should Be Used For Drawers And Should Be Able To Take Load Up To 30Kg. All Drawers Should Have Hettich Make Multipurpose Lock ( Ii ) The Top Of Work Station Should Be Made Of 17-19Mm Thick Granite Top With Chamfer Molding At The Front. ( Iii ) The Supplier Should Fix Work Stations Alongwith Wall-Mounted Cabinets In Our Laboratory. Prior To Installations The Lab Should Be Visited To Verify The Dimensions. ( Iv ) Good Quality Castor Wheels With Brake

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Item Details: Gas control system and workstations
Sl. No. Item Description
1Supply and Installation of Gas control system with gas lines for transfer of Argon and Nitrogen gas to lab (i)High Pressure Gas Manifold System for Argon and Nitrogen Gas cylinder with Pigtail (2Nos.) (ii)Cylinder Regulator with fully S.S. body with SS 316 Diaphragm for Argon and Nitrogen Gas Inlet Pressure gauge: 0-280 kg/cm2, Outlet Pressure gauge: 0-14 kg/cm2, Outlet Connection : 1/8" & 1/4" ferrule fitting Inlet Connection : 5/8" BSP Male (RHT), LHT (H2) (2Nos.) (iii)Suitable ¼” SS tubing 0.9mm thick with color coded sleeves to transfer Gas from the cylinder to the lab facility (~ 100 ft) (iv)Cylinder cage with suitable mounting brackets for holding 3 cylinders (with suitable SS braided pigtail of suitable length for keeping each cylinder with safety ropes) inside the cage. The structure should have MS support structure bracket, held MS and net for proper ventilation. It should have door opening from outside.Size 3’x3’x1’ (2Nos) (V)Genetic Valve with pressure gauge and suitable fittings for outlet (2Nos.) (vi)1/4“ , 1/8’’ Installation: Standard fittings, coupling, clamps, hardware as well as suitable arrangement for the transfer of gas from cylinder to the lab facility has to be carried out by the vender (1Pack)
2Exhaust system 3600CFM with 40x40x6mm MS angel frame with protective GI Mesh and flap cover
3Work stations of dimensions (a) (LxWxH~23”x30”x30”), (b) (LxWxH~12”x23”x42”), (c) (LxWxH~30”x65”x30”) and (d) (LxWxH~8”x15”x45”) made of 1mm or thicker GI sheets having following specifications (i) The telescopic drawer (3Nos) slide should be used for drawers and should be able to take load up to 30Kg. All drawers should have hettich make multipurpose lock (ii) The top of work station should be made of 17-19mm thick granite top with chamfer molding at the front. (iii) The supplier should fix work stations alongwith wall-mounted cabinets in our laboratory. Prior to installations the lab should be visited to verify the dimensions. (iv) Good quality castor wheels with brake
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail