}

Tender For Maintenance Jobs At Outlets In Faridkot, Muktsar And Fazilka Distt. Of Bhatinda Retail Ro---Surface Dressing Of The Ground Including Removing Small Plants, Bushes , Vegetation ( Dia Less Than 4 ) And Making Surface Levelled, Fazilka-Punjab

Hindustan Petroleum Corporation Limited has published Tender For Maintenance Jobs At Outlets In Faridkot, Muktsar And Fazilka Distt. Of Bhatinda Retail Ro---Surface Dressing Of The Ground Including Removing Small Plants, Bushes , Vegetation ( Dia Less Than 4 ) And Making Surface Levelled. Submission Date for this Tender is 26-08-2022. Pneumatic Tools Tenders in Fazilka Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

33534292
Tender For Maintenance Jobs At Outlets In Faridkot, Muktsar And Fazilka Distt. Of Bhatinda Retail Ro---Surface Dressing Of The Ground Including Removing Small Plants, Bushes , Vegetation ( Dia Less Than 4 ) And Making Surface Levelled
Tender
Indian
Punjab
Fazilka
26-08-2022

Tender Details

Tender For Maintenance Jobs At Outlets In Faridkot, Muktsar And Fazilka Distt. Of Bhatinda Retail Ro---Surface Dressing Of The Ground Including Removing Small Plants, Bushes , Vegetation ( Dia Less Than 4 ) And Making Surface Levelled And Disposal Of Rubbish Outside Hpcls Premises To An Unobjectionable Place, As Directed By The Engineer In Charge., Excavation For Foundation Upto Required Depth Below Existing Ground Level Up To 1.5M In Any Tyoe Odf Soil Except Hard Rock. Rate To Include Dressing The Sides And Bottom, Bailing Out Of Water If Encountered, Shoring, Strutting, Backfilling After The Construction Of Foundation, Trenches / Plinth Beam Etccompacting By The Side Of The Foundation And Disposal Of Surplus Excavated Earth Within / Outside Hpcls Premises To An Unobjectionable Place, As Directed By The Engineer In Charge Including Spreading, Watering And Compaction, Complete. The Measurement Of The Excavation Would Be Based On Actual Depth Of Excavation With Applicable Rate For Different Depths., Excavation For Foundation Upto Required Depth Below Ground Level In Any Type Of Soil Except Hard Rock . Rate To Include Dressing The Sides And Bottom, Bailing Out Of Water If Encountered, Shoring, Strutting, Backfilling After The Construction Of Foundation, Foundation, Trenches / Plinth Beam Etc Compacting By The Side Of The Foundation And Disposal Of Surplus Excavated Earth Within / Outside Hpcls Premises To An Unobjectionable Place, As Directed By The Engineer In Charge Including Spreading, Watering And Compaction, Complete . The Measurement Of The Excavation Would Be Based On Actual Depth Of Excavation With Applicable Rate For Different Depths.Excavation In Earth Upto 3 M, Excavation For Foundation Upto Required Depth Below Ground Level In Any Type Of Soil Except Hard Rock . Rate To Include Dressing The Sides And Bottom, Bailing Out Of Water If Encountered, Shoring, Strutting, Backfilling After The Construction Of Foundation, Compacting By The Side Of The Foundation And Disposal Of Surplus Excavated Earth Within / Outside Hpcls Premises To An Unobjectionable Place, As Directed By The Engineer In Charge Including Spreading, Watering And Compaction, Complete . The Measurement Of The Excavation Would Be Based On Actual Depth Of Excavation With Applicable Rate For Different Depths. Excavation In Earth Between 3 To 4.5, Excavation For Foundation Upto Required Depth Below Existing Ground Level Up To 1.5 M. Depth In Concrete Road By Chiselling / Pneumatic Drilling . Rate To Include Dressing The Sides And Bottom, Bailing Out Of Water If Encountered, Shoring, Strutting, Backfilling After The Job To Restore The Original State Of The Ground And Disposal Of Surplus Excavated Earth Within / Outside Hpcls Premises To An Unobjectionable Place, As Directed By The Engineer In Charge Including Curing, Watering And Compaction And Complete . The Measurement Of The Excavation Would Be Based On Actual Depth Of Excavation, Excavation For Foundation Upto Required In Hard Rock And Excavation Shall Be Done By Chiselling / Pneumatic Drilling Or Blasting. Rate To Include Dressing The Sides And Bottom, Bailing Out Of Water If Encountered, Shoring, Strutting, Backfilling After The Construction Of Foundation, Trenches / Plinth Beam Etc Compacting By The Side Of The Foundation And Disposal Of Surplus Excavated Earth Within / Outside Hpcls Premises To An Unobjectionable Place, As Directed By The Engineer In Charge Including Spreading, Watering And Compaction, Complete . The Measurement Of The Excavation Would Be Based On Actual Depth Of Excavation With Applicable Rate For Different Depths. Excavation In Hard Rock 1.5 Mts- 3.0 Mts

Key Value

Document Fees
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail