Running Contract For The Erection Of Works For Lt Overhead Feeder, Dismantling Works, Eos To Aggl Normal Services, Tatkal Aggl Services And Sfs Aggl Services And Natural Calamities Pertaining To South/Kangayam Sub Division Of Kangayam Division Running Contract For The Erection Of Works For Lt Overhead Feeder, Dismantling Works, Eos To Aggl Normal Services, Tatkal Aggl Services And Sfs Aggl Services And Natural Calamities Pertaining To South/Kangayam Sub Division Of Kangayam Division , Excavation Of Pole Pits- For Pole Upto 8.00M Length By Using Jcb/Manual , Excavation Of Pole Pits -For Pole Above 8.00M Length By Using Jcb/Manual , Erection Of Rcc, Rec, Psc Poles Upto 8.00M Length By Using Crane / Manual , Erection Of Rcc, Rec, Psc Poles Above 8.00M Length By Using Crane / Manual , Erection Of Metal Supports Above 9M / Rsj / Rail Pole/Tubular Poles , Excavation Of Stay Pit Of 4.5 To 5 Depth Using Jcb / Manual , Erection Of Stay Set Complete With Fixing Up Stay Wire Eye, Bow, Guy Shackle, Binding Etc. , Fixing Of V Cross Arm 3.5Feet , Fixing Of Lt S Phase Cross Arm , Fixing Of Lt 3 Phase Cross Arm , Fixing Of Ht / Lt Ti Fitting , Fixing Of Ht Pin Insulator With Pin 11 Kv , Fixing Of Lt Pin Insulator , Fixing O Tapping Channel Cross Arm/Guarding Cross Arm , Fixing Of Ht Strain Disc 11 Kv , Fixing Of Shackle , Fixing Of Aluminium Knob , Fixing Of Open Type Fuse Unit , Fixing Of Ht Las (3 Nos.) , Fixing Of Lt Las (3 Nos.) , Fixing Of Lt Capacitor , Paving And Stringing Of Conductors Of Sizes Upto 7/2.59 Mm Acsr Or Other Equivalent Conductor , Paving And Stringing Of Conductors Ofabove7/2.59 Mm Acsr Or Other Equivalent Conductor Upto 7/3.35Mm Acsr Or Other Equivalent Conductor , Erection Of Distribution Transformer Structure Complete As Per Tneb Standard Including Painting, Feeders Arrangrment, Colour Washing Of Rcc Poles Etc.. Fixing Of Poles Type To Be Unit Ht / Lt Las And Jumpering 3 Nos Earth Pits With Earth Trough Except Erection Of Distribution Transformer. , Erection Of Distribution Transformer Including Loading Of Distribution Transformer At Stores And Erection At Structure Or Vice Versa. , (I) Upto 25 Kva Distribution Transformer / Metering Set. , (Ii) Above 25 Kva To 100 Kva , (Iii) Above 100 Kva To 250 Kva , (Iv) 500 Kva And Above , Erection Of 11 Kv Single Pole Structure Including Erection Of Dt Complete Without Centre Support , Erection Of 11 Kv Single Pole Structure Including Erection Of Dt Complete With Centre Support , Erection Of Dp Structure With Stay As Per Tneb Standard Including Fixing Of Top Channel, Cross Bracing, Concreting, Painting, Colour Washing Etc., , (I) With 11 Kv Ab Switch Using All Types Of Poles Of Size 9.14 M And Above Length , Erection Of Single Pole Dp With Completeand With Single Earth , Concreting With 1:4:8 Mix Using 40 Mm Jelly Including Curing(Material + Labour) , (I) Mass Concreting Of Poles , (Ii) Sleeveconcreting , (Iii) Stay Concreting , (I) Earthing Of Poles With Gi Wires 4 Or 6 Swg By Coil Earthing , Loading Or Unloading Of Distribution Transformer , (I) Upto 100 Kva , (Ii) Above 100 Kva And Upto 500 Kva , (Iii) Metering Set Of All Ratios , Loading Of Various Sizes Of Poles , (I) Rec, Rcc, Psc Pole Upto 8.00 M Length , (Ii) All Rec, Rcc Pole Above 8.00 M Length , (Iii) Metal Poles All Sizes , Unloading Of Various Sizes Of Poles , (I) Rec, Rcc, Psc Pole Upto 8.00 M Length , (Ii) All Rec, Rcc Pole Above 8.00 M Length , (Iii) Metal Poles All Sizes , Loading Of Conductor , Unloading Of Conductor , Loading / Unloading Of Iron & Steel , Loading / Unloading Of Oil , Loading / Unloading Of Line Materials , Loading / Unloading Of 11 Kv Strain Disc , Loading / Unloading Of Lt Pin Insulator Shackle, Guy Shackle, Lt Pin, Metal Parts, Ht Pin Etc., , Provision Of Guarding With Two Numbers Earth Pits Excluding Stay Set Erection , (I) Flat Guarding With Earth Pit , (Ii) Split Neutral , Transportation Charges: , Transportation Of All Type Of Poles By Bullock Cart Or Other Vehicle (For All Sizes Of Poles Including Loading And Unloading) , (I) For A Lead Upto 5 Km , (Ii) Above 5 Km Of Lead Of Every Km , Transport Of Metal Pole Of All Sizes By Head Loads In Hill Areas From Road Side To Pole Pit Location , (I) Upto 1 Km , (Ii) Above 1 Km Per Each Km , Transporting Of Conductors Of All Sizes From Road Side To Pit Locations Upto One Km Of Conductor , (I) Transporting Of Distribution Transformer / Line Materials From Stores To Office / Site Upto 10 Km Distance By Engaging 1 Ton Capacity Minidor (Lorry) , (Ii) Above 10 Km , Dismantling Charges , Dismantling Of Rcc, Rec, Psc & Metal Pole Of All Sizes Including The Closing Of The Pit , For Breaking The Mass Concrete Of All Supports , Dismantling Of Stay Set Complete , (I) Including Stay Rod , (Ii) Without Stay Rod , Dismantling Of Conductor Ofupto 7/3.35 Including Transporting The Conductors To The Nearest Road Side And Stocking In Coils , Dismantling Of Conductor Ofabove 7/3.35 Including Transporting The Conductors To The Nearest Road Side And Stocking In Coils , Dismantling Of Transformer Structure Materials Complete Set And Transporting The Same From The Location To The Road Side , Dismantling Of Cross Arm Clamps Ti Fitting Hardwares, Insulators Etc., , Dismantling Of H.T/L.T. T.I. Fitting , Dismantling Of 3Ph X -Arm , Dismantling Of 1Ph X -Arm , Dismantling Of Aluminium Knob , Dismantling Of Lt Shackle With Mp , Dismantling Of Lt Pin With Insulator , Dismantling Of Lt Open Type , Dismantling Of Guarding Cross Arm , Dismantling Of Tapping Channel X Arm , Dismantling Of 11Kv Pin With Insulator , Dismantling Of 11Kv Composite Disc With Mp , Releasing And Erection 1 Ph Sc Wire [During Conductor Or Support Change] , Releasing And Erection 3 Ph Sc Wire [During Conductor Or Support Change] , Destruction Of Pole Concreting At Site , Retrieving Grill From Deteriorated Rcc Pole , Engaging Crane Per Hour (For Handling Of Poles, Metering Set,Dt Etc) , Engaging Jcb Per Hour (For Extension Works & Maintenance Works Etc) , Manufacturing / Altering Of Clamps , Drilling Of Holes In The Structure Materials Clamps Etc., , Ab Switch Or Open Type Side Arm Stud, Cutting And Drilling Holes , Clearing Of Branches / Trees With Jcb/Leveling Of Ground Using Bul Dozer , Sub Total , Epf @ 13% , Esi @ 3.25% , Sgst % , Cgst % , Igst %