Name of Work: Construction of Steel Girder Bridge for Span 1 and Span No 2 of 129 mtrs long bridge over river Jhelum at Dogripora Pulwama. Estimated Cost Rs. 218.90 Lacs
Sl. No.
Item Description
1
Providing andfabrication, erection , launching, assembling , hoisting , placing in position of structural steel work( Superstructure steel truss Girder with railing of channels/MS pipes) welded in built up sections in beams, joists, Channels, Angles, Tees, Flats with connecting plates or Angles, Cleatswith stiffeners includingcutting, Gas welding , Drilling of holes and fixing in position , staging, scaffolding, POL, MOL,Grease, including two coat of Zinc Cromatemetal primer as per approved design and drawings and arragement for mechnical /Manual launching and fixing of Girders complete including cost of structural steel, taxes , loading , unloading and all carriages upto site of work. Including carriage of departmental supply of structural steel of at least 10.00 Metric tonne ( approximate)or whatever is availablefrom fabrication site to actual site of work for a lead upto 8 Km
2
Providing and installing in position true to line and level elastomeric bearings over abutment and pier locations with all accessories as per drawing and technical specifications including provision of epoxy mortar for levelling and seating including carriage of bearings ( to be supplieddepartmentally) from Pampore to site of work
3
Note: Cost of departmental supply of structural steelif any shall be deducted @ Rs 80000.00 per metric tonne and cost ofbearings shall be deducted @ Rs 40000.00 per each
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.