Replacement Of Equipment Spares At Crushing Plant-11C -101 / 103 Apron Feeder: Roller Bearing / Plumber Block Replacement For All Shafts. Activities 1 101 / 103 Apron Feeder: Roller Bearing / Plumber Block Replacement For All Shafts. Act, kirandul-Chhattisgarh

Nmdc Limited has published Replacement Of Equipment Spares At Crushing Plant-11C -101 / 103 Apron Feeder: Roller Bearing / Plumber Block Replacement For All Shafts. Activities 1 101 / 103 Apron Feeder: Roller Bearing / Plumber Block Replacement For All Shafts. Act. Submission Date for this Tender is 06-09-2022. Spare Part Tenders in kirandul Chhattisgarh. Bidders can get complete Tender details and download the document.




Tender Notice

33525773
Replacement Of Equipment Spares At Crushing Plant-11C -101 / 103 Apron Feeder: Roller Bearing / Plumber Block Replacement For All Shafts. Activities 1 101 / 103 Apron Feeder: Roller Bearing / Plumber Block Replacement For All Shafts. Act
Limitted
Indian
Chhattisgarh
kirandul
06-09-2022

Tender Details

Replacement Of Equipment Spares At Crushing Plant-11C -101 / 103 Apron Feeder: Roller Bearing / Plumber Block Replacement For All Shafts. Activities 1 101 / 103 Apron Feeder: Roller Bearing / Plumber Block Replacement For All Shafts. Activities: Removal Of Damaged Bearing / Plumber Block By Carrying Out All Necessary Arrangements. Fitment Of New Bearing / Plumber Block. Re-Fitment Of All Other Removed Parts & Trail Run 2 101 / 103 Apron Feeder: Pinion / Gear Replacement Activities: Removal Of Damaged Pinion / Gear By Carrying Out All Necessary Arrangements. Fitment Of New Gear / Pinion. Re-Fitment Of All Other Removed Parts & Trail Run 3 101 / 103 Apron Feeder: Apron Pan Replacement. Activities: Removal Of Damaged Apron Pan By Carrying Out All Necessary Arrangements. Fitment Of New Apron Pans & Tightening Of It. Re-Fitment Of All Other Removed Parts & Trail Run 4 101 / 103 Apron Feeder, Set Pin / Link Pin Replacement Activities: Removal Of Damaged Set Pin / Link Pin By Carrying Out All Necessary Arrangements. Fitment Of New Set Pin / Link Pin. Re-Fitment Of All Other Removed Parts & Trail Run 5 103B Apron Feeder: Link Chain Replacement Activities: Removal Of Damaged Link Chain By Carrying Out All Necessary Arrangements. Fitment Of New Link Chain & Tensioning Of It, Alignment Of Feeder After Like Chain Fitment. Trail Run 6 101 / 103A Apron Feeder: Track Link Replacement Activities: Removal Of Damaged Track Link By Carrying Out All Necessary Arrangements. Fitment Of New Track Link & Tensioning Of It, Alignment Of Feeder After Like Chain Fitment. Trail Run 7 103 Apron Feeder: Feed Roller / Return Roller Replacement Activities: Removal Of Damaged Metallic Roller By Carrying Out All Necessary Arrangements. Fitment Of New Metallic Roller With Brackets. Trail Run 8 101 Apron Feeder: Feed Roller / Return Roller Replacement Activities: Removal Of Damaged Metallic Roller By Carrying Out All Necessary Arrangements. Fitment Of New Metallic Roller With Brackets. Trail Run 9 101 / 103 Apron Feeder: Main / Tail / Intermediate Shaft Replacement Activities: Removal Of Damaged Shaft By Carrying Out All Necessary Arrangements. Fitment Of New Shaft With Bearing & Plumber Block. Re-Fitment Of All Removed Spares. Trail Run 10 101 / 103 Apron Feeder: Apron Sprocket / Tail Guide Wheel / Drive & Driven Sprocket Replacement Activities: Removal Of Damaged Apron Sprocket Segments / Guide Wheels / Drive / Driven Sprocket Wheel By Carrying Out All Necessary Arrangements. Fitment Of New Damaged Apron Sprocket Segments / Guide Wheels / Drive / Driven Sprocket Wheel, Alignment Of Feeder / Drive Unit. Re-Fitment Of All Other Removed Spares. Trail Run 11 101 / 103 Apron Feeder: Return Side Base Structure Beam Replacement Activities: Removal Of Damaged Base Beam Structure With Rollers By Carrying Out All Necessary Arrangements. Fabrication Of New Roller Base Beam Structure. Fitment Of New Base Beam. Re-Fitment Of All Other Removed Spares. 12 102 Primary Crusher: Top Shell Concave Replacement. Activities: Removal Of Damaged Concave In All Rows And Removal Of Epoxy And Top Shell Surface Preparation, By Carrying Out All Necessary Arrangements. Setting Of All Row Concaves, Filling Of Epoxy With All Preparatory Work. 13 102 Primary Crusher: Mantle Liner Replacement. Activities: Removal Of Damaged Mantle Liner From Main Shaft, By Carrying Out All Necessary Arrangements. Fitment Of New Mantle Liner With Proper Alignment And Filling Of Epoxy, With All Preparatory Works. Re-Fitment Of All Other Removed Spares. 14 102 Primary Crusher : Preparation Of Eccentric Assembly. Activities: Removal Of Damaged Eccentric Bush From Eccentric, By Carrying Out All Necessary Arrangements. • Fitment Of New Eccentric Bush In Eccentric At Cws Or By Ice Box Cooling Method At Site, With All Preparatory Arrangements. Shifting Of Eccentric Assembly To Crusher Area. 15 102 Primary Crusher: Replacement Of Eccentric Gear. Activities: Shifting Of Eccentric Assembly To Cws, Removal Of Eccentric Gear From Eccentric Assembly, By Carrying Out All Necessary Arrangements. Fitment Of New Eccentric Gear To Eccentric Assembly By Press Arrangements. Shifting Of Eccentric Assembly To Crusher Area 16 108 Secondary Crusher: Top Shell Concave Replacement. Activities: Removal Of Damaged Concave In All Rows And Removal Of Epoxy And Top Shell Surface Preparation, By Carrying Out All Necessary Arrangements. Setting Of All Row Concaves, Filling Of Epoxy With All Preparatory Work. Site Clearance By Removal Of All Tools & Tackles. 17 108 Secondary Crusher: Mantle Liner Replacement. Activities: Removal Of Damaged Mantle Liner From Main Shaft, By Carrying Out All Necessary Arrangements. Fitment Of New Mantle Liner With Proper Alignment And Filling Of Epoxy, With All Preparatory Works. Re-Fitment Of All Other Removed Spares. Site Clearance By Removal Of All Tools & Tackles. 18 107 Scalping Screen: Screen Overhauling Activities: • Removal Of All Worn Out Screen Panels, Clamps, Worn Out Tie Bars, Damaged Beams / Bucker Up Structure And All Other Damaged Parts. Fabrication Of New Cross Beams, Tie Bar, Fitment Of All Cross Beams With Proper Alignment And Proper Welding Of It. Fitment Of Bucker Up Structure In Case Of Trf Screen. Installation Of All New Screen Panels & Bolting It At Rated Torque. Fitment Of All Clamps And Other Parts Of Screen. Site Clearance By Removal Of All Tools & Tackles 19 107 Scalping Screen: Screen Bearing Replacement Activities: Removal Of Bearing Housing From Screen, Removal Of Damaged Screen Bearing From Housing, By Carrying Out All Necessary Arrangements. Fitment Of New Screen Bearing In Housing & Fitment Of Housing To Screen & Bolting With Rated Torque. Fitment Of New Screen Bearing In Housing & Fitment Of Housing To Screen & Bolting With Rated Torque. Site Clearance By Removal Of All Tools & Tackles 20 All Conveyor: Pulley Replacement Activities: Removal Of Damaged Drive / Non-Drive Pulley From Conveyor, By Carrying Out All Necessary Arrangements. Fitment Of New Pulley With Plumber Block And Bearing With Proper Alignment. Re-Fitment Of All Other Removed Parts. Site Clearance By Removal Of All Tools & Tackles Trial Run 21 All Conveyor: Conveyor Belt Replacement & Joint Assistance Activities: • Shifting Of Belt From Store To Work Site, Arrangement Of All Tools, Vulcanizing Machine To Site For Work. • Removal Of Old Damaged Belt From Conveyor, By Carrying Out All Necessary Arrangements. • Installation Of New Belt To Conveyor By Proper Arrangements. • Assistance During Belt Joint Work. • Re-Fitment Of All Other Parts, Tensioning Of Belt • Site Clearance By Removal Of All Tools & Tackles. 22 All Conveyor: Conveyor Belt Re-Joint Assistance Activities: • Arrangement Of All Tools, Vulcanizing Machine To Site For Work. • Removal Of Damaged Belt Joint At Jointing Area. • Assistance During Belt Joint Work. • Re-Fitment Of All Other Parts, Tensioning Of Belt • Site Clearance By Removal Of All Tools & Tackles. • Trail Run 23 All Conveyor: Pulley Lagging Assistance Activities: • Freeing The Conveyor Belt Near Lagging Pulley, By Carrying Out All Necessary Arrangement & Creating A Belt Loop For Lagging • Assistance During Pulley Lagging. • Re-Fitment Of All Other Parts, Tensioning Of Belt • Site Clearance By Removal Of All Tools & Tackles. • Trail Run 24 120 Tripper Rail: Rail Replacement & Alignment Activities: • Removal Of Damaged Rail Wherever Required, By Carrying Out All Necessary Arrangements. • Alignment And Leveling Of Rails Throughout On Both Sides. 25 120 Tripper: Tripper Wheel Replacement Activities: • Removal Of Damaged Tripper Wheel With Shaft, By Carrying Out All Necessary Arrangements. • Fitment Of New Wheels In Shaft Along With Bearing & Plumber Block. • Installation Of New Wheel Shaft Assembly. • Site Clearance By Removal Of All Tools & Tackles. • Trail Run 26 Miscellaneous Work For Spare Replacement Activities: • Fabrication Of Support Structure & Platform Formation & Any Other Fabrication Work Required For Spare Replacement Work.

Key Value

Document Fees
Refer document
EMD
INR 24000.0 /-
Tender Value
INR 23.98 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail