}

Consultancy Services For Preparation Of Feasibility Study And Detailed Project Report For Construction Of Railway Over Bridge On Nh 753 At Km. 46.300 In Gondia City L.C. No. Gj1a Spl 3E On Balaghat To Gondia Line Section Between Nagra To Gondia On Ko, gondia-Maharashtra

Ministry Of Road Transport And Highways has published Consultancy Services For Preparation Of Feasibility Study And Detailed Project Report For Construction Of Railway Over Bridge On Nh 753 At Km. 46.300 In Gondia City L.C. No. Gj1a Spl 3E On Balaghat To Gondia Line Section Between Nagra To Gondia On Ko. Submission Date for this Tender is 30-09-2022. Bridge Work Tenders in gondia Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

33523266
Corrigendum : Consultancy Services For Preparation Of Feasibility Study And Detailed Project Report For Construction Of Railway Over Bridge On Nh 753 At Km. 46.300 In Gondia City L.C. No. Gj1a Spl 3E On Balaghat To Gondia Line Section Between Nagra To Gondia On Ko
Open Tender
Indian
Maharashtra
gondia
30-09-2022

Tender Details

Consultancy Services For Preparation Of Feasibility Study And Detailed Project Report For Construction Of Railway Over Bridge On Nh 753 At Km. 46.300 In Gondia City L.C. No. Gj1a Spl 3E On Balaghat To Gondia Line Section Between Nagra To Gondia On Ko

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 24-Aug-2022 Date Extension Date 08-09-2022
2 06-Sep-2022 Date Extension. Date 16-09-2022
3 15-Sep-2022 Date Extension.. Date 30-09-2022

Key Value

Document Fees
INR 5000 /-
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Construction of Railway Over Bridge on Kohmara - Gondia - Tirora - Tumsar - Ramtek Road NH 753 at Km. 46 + 300 in Gondia City (L.C. No. GJ1A-SPL/3E on Balaghat to Gondia line section between Nagra to Gondia) in Gondia District in the state of Maharashtra.
Sl. No. Item Description
1Professional Staff :
2Team Leader cum Sr. Bridge Engineer
3Highway cum Pavement Engineer
4Bridge / Structural Engineer
5Material-cum-Geo-technical Engineer-Geologist
6Senior Survey Engineer
7Environmental Specialist
8Quantity surveyor / Documentation Expert
9Land Acquisition Expert
10Utility Expert
11Sub Professional Staff : 4 Nos. (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
12Support Staff :
13Office Manager
14Typist
15Office Boy
16Night Watchman
17Transportation (Fixed Cost): 2 Nos. Ofvehicles (SUV Type) hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
18For Conusltant: Mahindra Bolero or Equivalent (Not more than 2 years old)
19For Conusltant: Innova or Equivalent (Not more than 2 years old)
20Duty Travel to Site (Fixed Cost) :
21Office Rent (Fixed Cost) : Minimum area of office - 150 sq.m (The rent cost includes maintenance, cleaning, Electric Bill, Water Bills, repairs, etc.)
22Office Supplies, Utilities and Communication :
23Office Supplies Drafting
24Supplies Computer
25Running Costs
26Domestic & International Communication
27Office Furniture and Equipment (Rental) : (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include 4 executive tables, 5chairs, 5 visitor chairs, 3 steel almirahs, 4 computer furniture, 1 conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (4 No., Intel i5, 19’’ colour TFT,RAM-8 GB, SSD-512 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 10 Business, pre-loaded anti-virus etc.), 1 Brother laser printers with scanner (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (3 no., 1.5 Ton), Water Coolers (as required)etc.
28Reports and Document Printing (Fixed):
29Monthly Report (3 Per Month)
30Inception Report & QAP
31Environment and Social Impact Screening Report
32Draft Feasibility Report
33Final Feasibility Report
34Strip Plan with L.A. Reports
35Draft LA and Clearances Report
36Final Land ClearancesReport
37Draft Environmental Assessment report & RAP
38Final Environmental Assessment report & RAP
39Draft Detailed Design Report& Drawings etc. (& Draft EMP)
40Draft Bidding Documents(& Draft EMP)
41Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.(& Final EMP)
42Final Bidding Documents
43Draft3(a), 3(A) and 3(D) notification for land acquisition (3 copies each)
44LA & Clearances II Report
45Survey and Investigation (Fixed):
46A. Topographical Survey :
47Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer etc.
48Detailed topographic surveys using mobile/aerial LiDAR or better technology
49B. Topographical Survey :
50Road and Bridge Inventory
51FWDTest and Pavemen tEvaluation
52Roughness Survey
53Axle Load Survey
54Material Survey and Investigation
55Sub-grade Investigation
56Traffic Survey
57Socio-economic & Census Survey / Studies
58Land Acquisition Studies
59Any other investigations/surveys
60*Sub-Soil Investigation(Boring) a) Boring in all type of soils (other than hard rock): 900 mtr b) Boring in Hard Rock : 250 Mtr
61C. NetWork Survey and GPR :
62Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. (For entire project length)
63GPR Survey for detection of underground utilities.(For entire project length)
64Cost of supply and fixing Boundary Pillars :
65Procuring and fixing boundary pillars and its installation, complete in all respect asper IRC:25,1967: Wherever the proposed alignment follows the existing alignment,the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highwayand/or construction of New Bypasses, Consultant shall fix boundary pillars along theproposed alignment on the extreme boundary on either side of the project Highway at 50m interval.(lumpsum) - For entire project length of 112 Km
66Land AcquisitionTeam includingsupportstaff :
671. Ex-Land RevenueInspector/Officer or equivalent,- 1 Nos. 2. Ex-Kanoogo/Girdwar or equivalent, -1 Nos. 3. Ex-Patwari or equivalent - 1 Nos. 4. Typist - 1 Nos. 5. Peon - 1 Nos.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail