Retrofitting To Pipe Water Supply Scheme At Kante Tal. Lanja Dist. Ratnagiri
Tender Value
24.30 Lakhs
Estimated cost
Bid Submission
18 Aug 2022
0 days left
EMD
24308
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
lanja → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Retrofitting To Pipe Water Supply Scheme At Kante Tal. Lanja Dist. Ratnagiri
BOQ
| Sl. No. | Item Description |
| 1 | SUB ESTIMATE NO. 1 -DISTRIBUTION SYSTEM |
| 2 | Item No.1 -Providing & supplying in standard lengths polyethelene Pipes, conforming to IS 4984/14151/12786/ 13488 with necessary jointing material like mechanical connector i.e.thread/ insert joint/ quick release coupler joint, including all local & central taxes, transportation and freight charges inspection charges, loading/unloading charges, conveyance to the departmental stores/ site & stacking the same in closed shade duely protecting from sunrays & rains, etc. |
| 3 | 90 mm dia HDPE Pipe PE-100-6kg/cm2 |
| 4 | 75 mm dia HDPE Pipe PE-100-6kg/cm2 |
| 5 | 63 mm dia HDPE Pipe PE-100-6kg/cm2 |
| 6 | Item No.2-Providng and supplying Idouble flangeSluice valves & single acting Air valve confirming for IS 2906/14846 including worn gear arrangement as per test pressurestainless steel spindle, caps including all taxes transportation etc.complete. |
| 7 | 80 mm dia Sluice valve PN-1 |
| 8 | 65 mm dia Sluice valve PN-1 |
| 9 | 50 mm dia Sluice valve PN-1 |
| 10 | 15mm dia Air valve PN-1 |
| 11 | B) Labour Section |
| 12 | Item No.1-Excavation for foundation/ pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 mtrs. and lifts as below, stacking and spreading as directed, normal dewatering,preparing the bed for foundation and excluding backfilling etc.complete. |
| 13 | Item no2 :-Excavation for foundation / pipe trenches in hard rock by controlled blasting including trimming and levelling the bed by chiselling where necessary & removing the excavated material & stacking it in measu-rable heaps,within a distance of 50 m. |
| 14 | Item No.3- Lowering laying & jointing H.D.P.E. Pipe by heating to the ends of pipe with the help of tefflon coated electrimirror/heater to the required temparature & then pressing the end together against each other to form a monolithic & leak proof joint by thermosetting process. the pressing may be required to be done with Jack/Hydraulicjack/Vutt fusion machine etc. complete. with all maerial,labours as directed by Engineer in charge including given satisfacory hydraulic test. |
| 15 | 90mm dia HDPE 6kg (67+10%) |
| 16 | 75mm dia HDPE 6kg (48+10%) |
| 17 | 63mm dia HDPE 6kg (45+10%) |
| 18 | Item No.4- Lowering, laying and jointing in position followingvalve including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. |
| 19 | 80 mmdia sluice valve PN-1(1738+10%) |
| 20 | 65 mmdia sluice valve PN-1(1251+10%) |
| 21 | 50 mmdia sluice valve PN-1(833+10%) |
| 22 | 15mm dia Air valve1 (133+10%) |
| 23 | Item No.5-Providing and laying in situ cement concrete mortar 1:2:4 of trap metal for foundation and bedding including bailing out water manually formwork compacting & curing etc. complete. |
| 24 | Item No.6:- Providing & fixing C I Road box including loading unloading and carting to site of work including all necessary excavation in all types of strata and fixing in muram packing etc complete (100 mmx 225 mm (20kg) |
| 25 | Item No.7 - Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 26 | Item No 8 :- Providing and fixing Name Board giving details of scheme etc.comp. (Market rate) |
| 27 | SUB ESTIMATE NO 2( PUMPING MACHINRY ) |
| 28 | Item No. 1-Providing installing, commissioning and testing of submerssible pump set 27 LPM discharging water against a total head of 89 m from all causes when running at 2900 RPM (Approx) directly coupled to submotor squrrel gage induction type of adquate capacity as per detail specifications.7 0 H.P. 12 Stages (R.A-1.) |
| 29 | Item No. 2-Providing, erecting , commissioning & testing of floor mounting type L.T. pannel board (skeletion type) as per detail specifications. (R.A.-2) |
| 30 | Item No. 3-Providing at site and jointing and testing at site of work double flanged type valve as per detail specifications |
| 31 | a) Non return valve (50 mm dia) (R.A.-3) |
| 32 | Item No.4-Providing erecting jointing & testing of vertical drop pipe 50 mm dia G.I. medium duty in 1.5m/1.00m or in length as per site condition with heavy duty flanges etc.complete. as per detail specifications. (R.A.-4) |
| 33 | Item No. 5 -Providing erecting, jointing & testing of required size M.S.D/F specials & pipe & flanges tubes etc.complete as per detail specifications.(R.A.-5) |
| 34 | Item No. 6-Providing installing and commissioning with test & trial Pr. guage arrangement having range about 15 kg / cm with syphon tube etc. complete.(R.A.-6) |
| 35 | Item No. 7(a) -Providing laying, jointing and testing of PVC water proof sub cable proper conductor of type ( 1x 3 x 2.5) sqm size as per detail specifications.(R.A.-7) |
| 36 | Item No.7(b) -Providing laying & testing of PVC allu. conductor armoured cable (1x3x4) core size & as per details specifications.(R.A.-7) |
| 37 | Item No.7(c)-Providing and testing varnished plank 20 mm thick fixed towall cr on provided pannel board for fitting MSEB connection with necessary materials supports etc. complete.(R.A.-7) |
| 38 | Item No. 7(d)-Excavation of trench in any type of, trench in any type of strata 0.3 mtr width and 0.6 mtr depth including removing of excavated material laying PVC conduit pipe and refilling the trench with excavated material.(R.A.-7) |
| 39 | Item No. 7e)-Providing and lowering, laying and jointing with provided cable of PVC conduit pipe suitable for insarting cables etc. complete.(R.A.-7) |
| 40 | Item No.8-Providing, installing, testing, earthing arrangement to installation of motor, L.T. pannel board starter etc. comp. as per details specifications.(R.A.-8) |
| 41 | Item No.9-Testing operating & trial of pumping machinary & allied equipment as directed by Engineer & as per specification complete.(R.A.-1) |
| 42 | SUB ESTIMATE NO - 3 PUMP HOUSE |
| 43 | Item 1:- Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. |
| 44 | Item No 2:- Providing &laying in situ reinforced cement concrete 1:2:4 (M- 20) of trap metalsincluding formwork compacting curing etc.complete |
| 45 | Item No3 :-providing &fixing in position Steel reinforcement of verious diameters for R.C.C. footings, foundations, slabs, beams, staining walls, etc. as per detailed drawings, designs,including cutting, bending, hooking, & etc. |
| 46 | Item No 4 :-Removing mud Plaster including disposing of the spoils as directed with all leads,lift etc.complete |
| 47 | Item No5:-Providing internal &External plastering 12mm.Tk.in single coat in C. M. 1:3 without neeru finish to stone masonary surface in all positions includingracking out joints,scaffolding curing etc. comp. |
| 48 | Item No. 7Providing and applying washable oil-bound distemper of approved colour and shade to old and new surfaces in two coats including scaffolding, preparing the surfaces. (excluding the primer coat.) etc. complete. SSR 36.11 |
| 49 | Sub Work No. 3 Trial Run |
| 50 | Item No.1-Commisioning running and maintaining the scheme to quantites, rated capacity, including manning necessary personnel such as operator, valveman, etc. as per requirements of the scheme and who should also administer chemical dose for a period of 1 month for individual scheme and 3 month for regional scheme, together with training of personne spared by MJP/ Local Body and handing over the scheme to Local Body after completion of the above period as directed by Engineer-in charge. |
| 51 | For Single Village.(Three Months) |
| 52 | GST |
AI Tender Summary
Tender Timeline
Aug 12, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedAug 18, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 22, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender