|
| 1 | Earth work in excavation over areas exceeding 30 cm and upto 1.5 m in depth 1.5 m in width as well as 10 sqm on plan inculding disposal of excavated soil upto1mt from cutting edge. |
| 2 | a) All Kinds of Soil |
| 3 | Earthwork in excavation over areas exceeding 30 cm in depth 1.5m in width as well as 10 sqm on plan) including disposal of excavated soil up to 50m from cutting edge, disposed earth to levelled and neatly dressed in allsorts of soil. |
| 4 | Extra for every additional lift of 1.5m or part thereoff. |
| 5 | Providing and laying of dry stone soling 50 mm thick tightly hand packed including all carriages |
| 6 | Providing and laying of1:4:8 nominal mix cement concrete using 40 mm aggregate . |
| 7 | Providing & Laying Reinforced cement concrete of specified grade in 1:1.5:3 nominal mix. |
| 8 | Reinforced cement concrete in walls, attached plasters columns etc of specified grade in 1:1.5:3 nominal mix. |
| 9 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. |
| 10 | All works upto plinth level |
| 11 | All works above plinth level upto floor V level |
| 12 | Reinforced cement concrete of specified grade in 1:1.5:3 nominal mix in Suspended Floors etc |
| 13 | Reinforced cement concrete of specified grade in 1:1.5:3 nominal mix in beams etc in domes, arches etc. |
| 14 | Centering and shuttering including struting proping and removal of form work. |
| 15 | a) Foundations |
| 16 | b) Walls |
| 17 | c) Beams, Lintels etc |
| 18 | d) Suspended Floors, Roofs, Landings etc |
| 19 | e) Arches, Domes etc upto span 6mtr |
| 20 | f) Edges of Slabs & breaks in floor walls |
| 21 | Extra for Shuttering in Circular Works |
| 22 | i)Foundations |
| 23 | ii) Walls |
| 24 | iii) Beams |
| 25 | vi) Extra for Domes |
| 26 | Cement Plaster in 1:3 mix with floating coat of neat Cement. |
| 27 | 12mm Cement plaster in 1:4 nominal mix. |
| 28 | Providing Reinforcement to RCC works including bending, binding, cuttingstratining and placing in position complete. |
| 29 | Extra for providing water profing compound to cement concrete works. |
| 30 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) |
| 31 | Structural steel works in built up sections. |
| 32 | Back-filling of available excavated soil into the trench excluding rock. |
| 33 | Carriage of material from source to dumping site at road by mechnical transport. |
| 34 | a)Cement/ Steel (15 Km) |
| 35 | b) Sand (40 Km) |
| 36 | c) 20 mm Aggregate (25 Km)` |
| 37 | d) 40 mm Aggregate (25 Km) |
| 38 | Extra Carriage of Pipes from nearest dumping site to actual site of work by manual labour for |
| 39 | a)Cement (500 Mtr) |
| 40 | b)Steel (500 Mtr) |
| 41 | c) Sand & 20 mm Aggregate (500 Mtr) |
| 42 | d) 40 mm Aggregate (500 Mtr) |