Execution Of Contract Towards Extension Of Supply Works For Effecting Of New Services And Other Works Of Kadayanallur Division.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
22 Aug 2022
0 days left
EMD
2000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
kadayanallur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Execution Of Contract Towards Extension Of Supply Works For Effecting Of New Services And Other Works Of Kadayanallur Division.
BOQ
| Sl. No. | Item Description |
| 1 | Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 2 | Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 3 | Rocky ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 4 | Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 5 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
| 6 | Normal ground- Erection of 9M & 9.14M poles |
| 7 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
| 8 | Rocky ground- Erection of 9M & 9.14M poles |
| 9 | Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole |
| 10 | Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole |
| 11 | Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole |
| 12 | Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole |
| 13 | Loading and Unloading of Line Materials |
| 14 | Concreting of poles as per Board Standards (2\"*2\"*5\"). The materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.) |
| 15 | Coping of pole (0.6m*0.6m*0.35m) |
| 16 | Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement |
| 17 | Coil earthing per pole & pole earthing |
| 18 | Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 19 | Normal ground- Erection of stay set |
| 20 | Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 21 | Rocky ground- Erection of stay set |
| 22 | Loading &unloading charges of line materials |
| 23 | Fixing of V & Channel cross arm 3.5\" including transporting of materials from road side to site |
| 24 | Fixing of LT 3Phase cross arm including transporting of materials from road side to site |
| 25 | Fixing of LT 1Phase cross arm including transporting of materials from road side to site |
| 26 | Fixing of HT LT TI fitting including transporting of materials from road side to site |
| 27 | Erection of HT Side arm with stud including transporting of materials from road side to site |
| 28 | Erection of LT Side arm with stud including transporting of materials from road side to site |
| 29 | Fixing of insulator (per location) including transporting of materials from road side to site |
| 30 | Fixing of Tapping channel X arm |
| 31 | Fixing of 11 KV Strain Disc |
| 32 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire) |
| 33 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) |
| 34 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire) |
| 35 | For HT line clear works for For 7/2.59 ACSR (1Span/Wire) |
| 36 | For HT line clear works for For 7/3.35 ACSR (1Span/Wire) |
| 37 | For HT line clear works for For 7/4.09 ACSR (1Span/Wire) |
| 38 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR |
| 39 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR |
| 40 | For LT line clear works for For 7/2.59 ACSR (1Span/Wire) |
| 41 | For LT line clear works for For 7/3.35 ACSR (1Span/Wire) |
| 42 | Split Neutral guarding |
| 43 | Flat Guarding |
| 44 | Erection of transformer/dismantling upto 200KVA |
| 45 | Erection of feeder cable with open type fuse unit per feeder and for each addl feeder |
| 46 | Erection of feeder cable with open type fuse unit - for each addl feeder |
| 47 | Erection of feeder cable -Bus bar arrangement with open type |
| 48 | Loading & unloading of Distribution transformer below 250KVA |
| 49 | Erection of centre Support(Incl. Concrete) |
| 50 | Alteration of clamps |
| 51 | Drilling less than 23mm holes per hole/slatted hole |
| 52 | Cutting of channel |
| 53 | Cutting of Flat |
| 54 | Cutting of Angle |
| 55 | RSJ Pole Cuttiing |
| 56 | LT-Changing of pin point to cut point |
| 57 | HT-Changing of pin point to cut point |
| 58 | Erection of service connection materials- single phase |
| 59 | Erection of service connection materials- Three phase |
| 60 | Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., |
| 61 | Dismantling of poles without concrete in damaged condition including grill separation etc., |
| 62 | Providing jumpering at cut point |
| 63 | Tree clearance in HT or LT Location- For ordinary Tree clearance and Throng Bushes & Trees |
| 64 | For coconut Trees |
| 65 | For Palmrah Trees |
| 66 | Set Right of leaning of HT pole or LT pole including X arm,TI fittings |
| 67 | Transporting of 42\" twin RSJ pole from roadside pole pit |
| 68 | Fabrication of 42\" Twin RSJ pole, Materials supplied by Board. |
| 69 | Excavation & Erection of Twin 42\"2\" fabricated RSJ pole |
| 70 | Concreting of 42\" twin RSJ pole |
| 71 | Loadiing & Unloading of 42\" Twin RSJ pole |
| 72 | ReSagging |
| 73 | Dismantling of 7.5m /8m pole with out damage |
| 74 | Dismantling of 9.14m pole/ RSJ with out damage |
| 75 | Erection of Distribution Transformer double pole structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. |
| 76 | Erection of 11 KV single pole Structure including erection of DT complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. |
| 77 | Dismantling of stay set complete including stay rod |
| 78 | Dismantling of stay set complete Without stay rod |
| 79 | Dismantling of conductor ofupto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
| 80 | Dismantling of conductor ofabove 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
| 81 | Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side |
| 82 | Dismantling of V Cross arm |
| 83 | Dismantling of 3 phase X Arm |
| 84 | Dismantling of Single phase X arm |
| 85 | Dismantling of HT/LT TI Fitting |
| 86 | Dismantling of HT pin Insulators |
| 87 | Dismantling of LT pin Insulators |
| 88 | Dismantling of Strain Disc |
| 89 | Hiring of JCB |
| 90 | Hiring of Crane |
| 91 | Exceeding 1 Hour for every hour |
| 92 | Transporting of Charges of DT / Line materials using private vehicle upto 20 KM( Up and Down) |
| 93 | Beyond 20 KM for every KM |
| 94 | Maintenance of Distribution Transformer-Providing of \"U\" jumpering |
AI Tender Summary
Tender Timeline
Aug 06, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedAug 22, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 23, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender