Rate Contract For Execution Of Works For Agricultural Feeder Segregation Under Rds Scheme In Udumalpet Division Poolavady Sub Division Rate Contract For Execution Of Works For Agricultural Feeder Segregation Under Rds Scheme In Udumalpet Division Poolavad
Tender Overview
Project Description
Rate Contract For Execution Of Works For Agricultural Feeder Segregation Under Rds Scheme In Udumalpet Division Poolavady Sub Division Rate Contract For Execution Of Works For Agricultural Feeder Segregation Under Rds Scheme In Udumalpet Division Poolavady Sub Division
BOQ
| Sl. No. | Item Description |
| 1 | EXCAVATION OF POLE PITS / Stay Set: |
| 2 | For pole upto 8.00m length by using JCB/Manual |
| 3 | For pole above 8.00m length by using JCB/Manual |
| 4 | In Hard Soil (common to all size of poles) |
| 5 | In rocky area (common to all size of poles) by blasting / Manual |
| 6 | Excavation of Stay pit of 4.5 \" to 5 \"depth using JCB / Manual |
| 7 | Excavation of Stay pit in Hard rock soil |
| 8 | Excavation and back filling of Stay pit in Hard rock soil with out blasting |
| 9 | Excavation and back fillingof Stay pit inmedium rock and dense medium rock requires blasting |
| 10 | ERECTION OF POLES AND ACCESSORIES |
| 11 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 12 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 13 | Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles |
| 14 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
| 15 | Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. |
| 16 | Erection of stay set complete in the rock area by blasting |
| 17 | Fixing of Line Materials |
| 18 | V cross arm4.5 feet |
| 19 | Fixing of LT S phase cross arm |
| 20 | Fixing of LT 3 phase cross arm |
| 21 | Fixing of HT / LT Ti fitting |
| 22 | Fixing of HT PIN insulator with Pin 22 kv |
| 23 | Fixing of LT PIN insulator |
| 24 | Fixing of HT strain disc 11 KV |
| 25 | Fixing of HT strain disc 22 KV |
| 26 | Set right of all sizes of leaning poles |
| 27 | Fixing of shackle |
| 28 | Fixing of Aluminium knob |
| 29 | Fixing of HT LAS (3 Nos.) |
| 30 | Fixing of LT LAS (3 Nos.) |
| 31 | Fixing of Double channal X arm |
| 32 | Fixing of Tapping channal X arm |
| 33 | Fixing of Guarding channal X arm |
| 34 | LT open type fuse unit |
| 35 | DismandlingV cross arm4.5 feet |
| 36 | Dismandling of LT S phase cross arm |
| 37 | Dismandlingof LT 3 phase cross arm |
| 38 | Dismandling of HT / LT Ti fitting |
| 39 | Dismandling of HT PIN insulator with Pin 22 kv |
| 40 | Dismandlingof LT PIN insulator |
| 41 | Dismandling of HT strain disc 11 KV |
| 42 | Dismandling of HT strain disc 22 KV |
| 43 | Dismandlingof shackle |
| 44 | Dismandling of Aluminium knob |
| 45 | Dismandlingof HT LAS (3 Nos.) |
| 46 | Dismandlingof LT LAS (3 Nos.) |
| 47 | Dismandling of Double channal X arm |
| 48 | Dismandlingof Tapping channal X arm |
| 49 | Dismandling of Guarding channal X arm |
| 50 | DismandlingLT open type fuse unit |
| 51 | Dismandlingof Top Channel |
| 52 | Dismandlingof Belting Channel |
| 53 | Dismandlingof Bed Channel |
| 54 | Dismandlingof Metering set |
| 55 | Dismandlingof DT below 200KVA |
| 56 | Dismandlingof Dt above 200KVA below 500KVA |
| 57 | Dismandlingof Dt500KVA |
| 58 | Destruction of pole concreting at site |
| 59 | Retrieving grill from Deteriorated RCC pole |
| 60 | STRINGING OF CONDUCTORS: |
| 61 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 62 | Paving and stringing of conductors ofabove7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor |
| 63 | Paving and stringing of conductors of one run of PVC cable line of all sizes with GI wire and reel insulator. |
| 64 | Paving and stringing of conductors of7/4.09mm ACSR or other equivalent conductor |
| 65 | Paving and stringing of conductors of7/4.72 mm Dog Conductor or other equivalent conductor |
| 66 | Releasing and reerection (resagging) of one run of all sizes of conductor |
| 67 | Dismantling of conductor ofupto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
| 68 | Dismantling of conductor ofabove 7/3.35 including transporting the conductors to the nearest road side and stocking in coils |
| 69 | ERECTION OF DISTRIBUTION TRANSFORMERS: |
| 70 | Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II) |
| 71 | Erection of single pole Transformer structure completeas per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer |
| 72 | Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. |
| 73 | (i) Upto 25 KVA Distribution transformer / Metering set. |
| 74 | (ii) Above 25 KVA to 100 KVA |
| 75 | (iii) Above 100 KVA to 250 KVA |
| 76 | (iv) 500 KVA and above |
| 77 | ERECTION OF DP STRUCTURE: |
| 78 | Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., (Data as per Annexure I) (i) With 22 / 33 KV AB switch using all types of poles of size 9.14 m and above length |
| 79 | Erection of single pole DP with completeand with single earth |
| 80 | CONCRETING WORKS: |
| 81 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) |
| 82 | (i) Mass concreting of poles |
| 83 | (ii) Sleeveconcreting |
| 84 | (iii) Stay concreting |
| 85 | EARTHING: |
| 86 | (i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 87 | (ii) Provision of spike including earthing arrangement |
| 88 | (iii) Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length |
| 89 | (iv) Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination |
| 90 | (v) Replacement of corroded earth pipe |
| 91 | LOADING AND UNLOADING CHARGES: |
| 92 | Loading or unloading of Distribution Transformer |
| 93 | (i) Upto 100 KVA |
| 94 | (ii) Above 100 KVA and upto 500 KVA |
| 95 | (iii) Metering set of all ratios |
| 96 | Loading or unloading of various sizes of poles |
| 97 | (i) REC, RCC, PSC pole upto 8.00 m length |
| 98 | (ii) All REC, RCC pole above 8.00 m length |
| 99 | (iii) Metal poles all sizes |
| 100 | Loading of Conductor |
| 101 | Unloading of Conductor |
| 102 | Loading / Unloading of Iron & Steel |
| 103 | Loading / Unloading of line materials |
| 104 | Guarding Arrangement |
| 105 | Provision of guarding with two numbers earth pits excluding stay set erection |
| 106 | (i) Flat guarding with earth pit |
| 107 | (ii) Split neutral |
| 108 | TRANSPORTATION CHARGES: |
| 109 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 110 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) |
| 111 | (i) For a lead upto 5 KM |
| 112 | (ii) Above 5 KM of lead of every KM |
| 113 | Transport of Metal pole of all sizes by head loads in hill areas from road side to pole pit location |
| 114 | (i) Upto 1 KM |
| 115 | (ii) Above 1 KM per each KM |
| 116 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 117 | (i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 118 | (ii) Above 10 KM |
| 119 | PAINTING: |
| 120 | Numbering of poles including base painting and with cost of paint |
| 121 | Painting of iron poles up to 36 ft length with double coats including cost of paint |
| 122 | Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint |
| 123 | Painting of Cement poles by Distember coating including cost of distember |
| 124 | Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department) |
| 125 | WORKSHOP CHARGES: |
| 126 | Manufacturing / Altering of Clamps |
| 127 | Drilling of holes in the structure materials clamps etc., |
| 128 | AB switch or open type side arm stud, cutting and drilling holes |
| 129 | Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe |
| 130 | GENERAL: |
| 131 | Jungle clearance such as kattu karuvai in the various area without uprooting |
| 132 | Jungle clearance such as kattu karuvai in the various area with uprooting |
| 133 | Clearing of tree braches of coconut trees |
| 134 | Clearing of tree braches of Neem, Tamarin, Country etc |
| 135 | Leveling of Ground using Bul Dozer |
| 136 | Clearing of Branches / Trees with JCB |
| 137 | Fencing of Distribution Transformer Structure at Road side- Fabrication and Erection.(including all materials) |
| 138 | 33KVTermination Kits (HS Type) |
| 139 | Road cutting charges |
| 140 | 33KV Straight joints kits (HS Type) |
| 141 | watch and ward Cable |
| 142 | Supply and erection of cable marker |
| 143 | Uncoiling & laying of 33KV cable |
| 144 | cutting the cable |
| 145 | Refilling with excavated earth |
| 146 | Crusher dust provision |
| 147 | Earth work excavation |
| 148 | 33KV V Trough |
| 149 | Labour for bay Extension |
| 150 | Painting one coat of Red oxide paint (with out paint) |
| 151 | Painting two coat of Aluminiumpaint over coat of primer paint (with out paint) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender