Construction Of Pcc Road Along Railway Line Towards Telgama Village At Hatia Rehab Site.L-100 Mtrs.
Tender Value
10.83 Lakhs
Estimated cost
Bid Submission
15 Aug 2022
0 days left
EMD
13600
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
hatia → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Pcc Road Along Railway Line Towards Telgama Village At Hatia Rehab Site.L-100 Mtrs.
BOQ
| Sl. No. | Item Description |
| 1 | Item Description/ Heading |
| 2 | Dry lean Cement Concrete Sub-base (Construction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing ) |
| 3 | Cement concrete pavement (Cosntruction of un-reinfroced, dowel jointed, plain cement concrete pavement M-30 grade concrete over a prepared sub base with cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous opreation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealnt primer, joint sealant, debonding strip, admixtures as approved curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of sprcifications complete but excluding cost of steel in dowel bar and tie rods etc). (deduct above if paver with electronic sensor is not used and laying, compaction is done by any other method.) |
| 4 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density) Grading-II Using Screening Type-A (13.2 mm Agg.)(deduction of vibratory roller/motor grader is not used with prior written approval by C.E. If motor grader is not used.) |
| 5 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density) Grading-III Using Screening Type-B (11.2 mm Agg.)(deduction of vibratory roller/motor grader is not used with prior written approval by C.E. If motor grader is not used.) |
| 6 | Deduct from above item if paver with electronic sensor, vibratory roller are not used and laying, compaction is done by any other method. (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid work). |
| 7 | Deduction if vibratory roller/motor grader is not used with prior written approval by C.E if motor grader is not used. |
| 8 | Deduct above if paver with electronic sensor is not used and laying, compaction is done by any other method (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid work) |
| 9 | Total impact of GST for the purpose of CTC |
AI Tender Summary
Tender Timeline
Aug 04, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedAug 15, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 17, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender