| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 5 | Providing and laying in position reinforcement cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 8 | Foundations, footings, bases of columns etc. for mass concrete. |
| 9 | Suspended floors, roofs, landings, balconies and access platforms. |
| 10 | Edges of slabs and breaks in floors and walls. Under 20 cm wide |
| 11 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 12 | Providing and laying WBM Grade-II with specified stone aggregates 63mm to 45mm of size incl. stone screenings 13.20 nominal size and binding material complete incl. sorting, spreading to template and consolidations with power road roller 8 to 10 tone capacity etc. |
| 13 | Providing and laying WBM Gr-III with specified crushed stone aggregates 53mm to 22.4mm size incl. stone screenings 11.20 nominal size and binding material complete incl. sorting, spreading to template and consolidations with power road roller 8 to 10 tone capacity etc complete |
| 14 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On WBM surface @ 0.75 Kg/sqm. |
| 15 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On bitumen surface @ 0.50 Kg/sqm. |
| 16 | 2 cm premix carpet surfacing with 1.8cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 size respectively, per 100 sqm and 52kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). |
| 17 | With paving Asphalt grade VG-30 with no solvent |
| 18 | Providing and laying seal coat of premixed fine aggregate (passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 Kg of bitumen of grade VG-30 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface incl. rolling and finishing with road all complete |
| 19 | Carriage of material by Mechanical Transport including loading / unloading and stacking at site complete. |
| 20 | Stone aggregate above 40mm nominal size average lead 15.00 Km |
| 21 | Stone aggregate below 40mm nominal size average lead 15.00 Km |