}

Tender For Installation Of Equipment At Se1#A1 Qps At Ghuma Ahmedabad Block: ( Cb-Onn-2000 / 1 ) In Gujarat, India-Well Manifold Connecting Tubing / Annulus Of Well, Sitc Of Breather Valve Flame Arrestor ( Inbuilt Type ) With 1 Year Gu, ahmedabad-Gujarat

Gujarat State Petroleum Corporation Limited has published Tender For Installation Of Equipment At Se1#A1 Qps At Ghuma Ahmedabad Block: ( Cb-Onn-2000 / 1 ) In Gujarat, India-Well Manifold Connecting Tubing / Annulus Of Well, Sitc Of Breather Valve Flame Arrestor ( Inbuilt Type ) With 1 Year Gu. Submission Date for this Tender is 23-08-2022. Kitchen Equipment Tenders in ahmedabad Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

33372808
Tender For Installation Of Equipment At Se1#A1 Qps At Ghuma Ahmedabad Block: ( Cb-Onn-2000 / 1 ) In Gujarat, India-Well Manifold Connecting Tubing / Annulus Of Well, Sitc Of Breather Valve Flame Arrestor ( Inbuilt Type ) With 1 Year Gu
Open Tender
Indian
Gujarat
ahmedabad
23-08-2022

Tender Details

Tender For Installation Of Equipment At Se1#A1 Qps At Ghuma Ahmedabad Block: ( Cb-Onn-2000 / 1 ) In Gujarat, India-Well Manifold Connecting Tubing / Annulus Of Well, Sitc Of Breather Valve Flame Arrestor ( Inbuilt Type ) With 1 Year Guarantee After Dismantling Of Vent Pipe From Tank Nozzle Of 45 Scm-Tank With Necessary Fittings. ( Make / Model: Fidicon Devices India -Fdi-Bvfa-717 / Equivalent ) , 3 Sitc Of Complete Burner Management System With Flame Proof Panel Including Liquid Level Controller & Gas Detector System [ Ibh No: 1, Size-Dia: 1600 Mm, Length:4500 Mm ] 3.A Extension Of Gas Intake Line & Installation Of Temperature Sensor On Ibh Body 3.B Sitc Of 2 Gas Pressure Reducing System 3.C Sitc Of Industrial Power Gas Burner 3.D Sitc Of Flame Proof Panel With Temperature Controller ( 2-Set Point, Make :Narayan Or Equivalent ) On 5 Ft M.S Stand With Cabling Under Galvanized Perforated Cable Tray With Top Cover Up To Temp Sensor. 3.E Sitc Of Side Mounted Low Level Switch System ( Make: Flowtech Measuring Instrument / Equivalent ) In Ibh To Ensure That Liquid Level Is Always Above The Fire Tube. The Switch Will Send Signal To Burner Panel To Close The Fuel Gas Supply To Main Burner, If Liquid Level Drops Below The Fire Tube Including All Necessary Cable & Fittings. This Includes Making A Suitable 2 Hole In Ibh Body, Welding 2 Nipple With 2 Flange & Re-Insulation / Sealing For Mounting Switch. Switch Specification: Switch Housing: Die Cast Aluminum, Weather Proof Ip67 & Flame Proof Ip65 Flange: Mini 2 Nb In C.S Or S Rating: 5 Amp @ 240 V Ac Float : S.S 316 Switching Differential: Fixed 25 +-2Mm 3.F Sitc Of 2 Nos Of Gas Detector With Hotter Cum Flasher As Per Specification Annex-Ii ( 2 Yrs Standard Warranty ) On 5 Ft Ms Skid Near The Potential Source Of Gas Leakage In Burner Side Area Of Ibh Which Should Give Audio And Visual Alarm In Case Gas Leakage Is Detected & Send Signal To Burner Panel To Close The Fuel Gas Supply To Main Burner Including All Necessary Cable Under Galvanized Perforated Cable Tray With Top Cover & Other Necessary Fittings. 3.G Sitc Of Underground 4-Core X 4 Sq.Mm Copper Armored Cable ( Make: Polycab / Havels ) From Eps Electrical Room Upto Ibh No:1 This Includes : ▪ Laying Cable By Making Trench With Suitable Width & Depth Deep All Over The Run, Covering Of Cable With Second Class Bricks Laid Over The Cable Cross Wise , Backfilling The Same & Making The Surface As Normal Ground. ▪ Providing & Erecting 10 Nos Of Iron Clad Route Marker Duly Marked With Foundation As Desired By Eic At Every 20 Meter Interval. 4 Supply & Installation Of Orifice Based Digital Gas Flow Meter As Per Specification Mentioned In Table-I 5 Installation Of Dismantled Electric Pole 6 Sitc Of 3 Core X 2.5 Sq. Mm Copper Arm Cable ( Make: Havels / Ploycab ) 7 Construction Of Separator Platform ( Size 8 M X 8 M X 1 M ) For Installation And Commissioning Of Gspc Supplied Vertical Separator Along With Piping Work 7.A Excavation Upto 1.5 Mtr For Wall 7.B Sand Filling For Wall 7.C Cc 1:3:6 For Wall 7.D Brickwork In Foundation And Plinth For Wall 7.D Earth Filling - Platform 7.E Rcc 1:1.5:3 For Rcc Foundation For Separator 7.F Tmt For Rcc Foundation 7.G Ms Angle Sections For Support & Bolts 7.H 15Mm Plastering For Wall 8.A Construction Of Cc Support With Angles ( 0.4M 0.4 M X 0.8M ) Above Ground Level 8.B Construction Of Cc Pit ( 3.5 M X 2M X 1 M ) For Installation Of Knock Out Drum In Flare Line 9 Construction Of Underground Drain Pit ( 1M X 1M X1m ) 10 Installation & Commissioning Of Gspc Supplied Group ( 8” ) & Test ( 4 “ ) Oil Header On Separator Platform With Necessary Cutting & Welding Work ( Refer Sketch Ii ) . Work Also Include Providing Necessary C – Section Support. 11 Installation & Commissioning Of Gspc Supplied Oil Flow Lines On Cc-Support With Necessary Cutting And Welding At Ten ( 10 ) Joints With Flange Connection. 12 Installation & Commissioning Of Gspc Supplied Gas Flow Lines On Cc-Support With Necessary Cutting And Welding At Two Joints On 4 Inch Line And 11 Joints On 1 Inch Line With Flange Connection. 13 Installation & Commissioning Of Gspc Supplied Hot Water Circulation Line On Ccsuport With Necessary Cutting And Welding At Twelve ( 12 ) Joints With Flange Connection. 14.A Installation & Commissioning Of Gspc Supplied Vertical Separator Along With Skid Installed At Se1#A1 Eps At Ahmedabad ( Refer Plot Layout Sketch-Ii ) . Skid Includes Vertical Two Phase Separator, Kod, Solar Flow Computer, And Piping On Skid As Per Sketch -Ii. Dismantled Material Is Available At Se1#A1 Qps. 14.B Installation & Commissioning Of Gspc Supplied Vertical Separator Along With Oil And Gas Flow Line System Including Instrumentation System. Job Includes Shifting Of All Material Indicated Above Of Separator System From Se1 Qps To Se1#A1 Qps ( Approx 1 Km Distance ) Along With Welding And Cutting Work. ( Refer Plot Layout Sketch-Ii ) . - Bidder Has To Visit And Estimate For Transport Of Separator From Se#1 To Se#A1 Qps. - Bidder To Provide Crane For Loading And Unloading Operation. - Shifting And Loading Charges To Be Included In Quoted Rate. - Bulk Items Such As Flanges, Gasket, Bolts Etc To Be Included In Quoted Rates. - Required Welding Work During Installation To Be Included In The Quoted Rates. - Bidder To Provide Support As Per Engineering Practice 15.A Thermal Insulation With 75 Mm Thick Glass Wool & Aluminum Sheet Cladding On Hot Water Piping Of 2 -7 / 8 Inch 15.B Thermal Insulation With 75 Mm Thick Glass Wool & Aluminum Sheet Cladding On Hot Water Piping Of 4 Inch 16 Supply & Installation Of Fittings In Flow Line System 16.A 4 #150 Sorf Flange With Copper Strip In Line 16.B 4 90 Deg Elbow ( Sch 40 ) In Line 16.C 2 90 Deg Elbow ( Sch 40 ) In Line 16.D 1 90 Deg Elbow ( Sch 40 ) In Line 16.E 4 45 Deg Elbow ( Sch 40 ) In Line 16.F 2 45 Deg Elbow ( Sch 40 ) In Line 16.G 1 45 Deg Elbow ( Sch 40 ) In Line 16.H 1 #150 Sorf Flange With Copper Strip In Line 16.I 4 #150 Blind 17 Construction Of Earthing Pits ( 2 Nos ) As Per Electrical Standard 3 Mtrs Long X 40 Mm Dia G.I. Pipe, G.I. Funnel With G.I. Earth Connection Bolt With Nut, With Cast Iron Cover, Salt, Charcoal, Etc. And Its Connection To Separator With 25X3 Mm Gi Strip. 18 Supply, Installation, Testing & Commissioning Of 8” Suction Line With Foot Valve As Per Is Standards Including All Bends, Flange, Fittings And Length Of Pipe As Per Sketch-Iv ( Pipe Specification As Per Is 3589 )

Key Value

Document Fees
Refer document
EMD
INR 61000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail