maintenance of Mtc. Of Pwd Roads ( I ) Tsecl Office To Netaji Chowmuhani At Dighalbak I.E. Portion From Ch.0.00 Km To Ch.1.00Km ( Ii ) Geeta Bhavan Road ( Iii ) Widening Portion Near Tsecl Office Widening, Re-Carpeting And Patch Carpeting, Gsb
Tender Overview
Project Description
maintenance of Mtc. Of Pwd Roads ( I ) Tsecl Office To Netaji Chowmuhani At Dighalbak I.E. Portion From Ch.0.00 Km To Ch.1.00Km ( Ii ) Geeta Bhavan Road ( Iii ) Widening Portion Near Tsecl Office Widening, Re-Carpeting And Patch Carpeting, Gsb, Wbm And Patch Wbm And Grouting, Surface Drains, Stripping Etc.
BOQ
| Sl. No. | Item Description |
| 1 | Compacting original ground supporting subgradeLoosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per MoRD Technical Specification Clause 303 5 2. |
| 2 | Granular Sub-base with Well Graded Material (Table 400.1)By Mix in Place MethodConstruction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Technical Specification Clause 401.(I) For Grading I Material |
| 3 | Water Bound Macadam Sub-Base / Base(ii) WBM Grading 2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density \"Grading 2\" as per MoRD Technical Specification Clause 405.(A) By Manual Means |
| 4 | (iii) WBM Grading - 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density \"Grading 3\" as per MoRD Technical Specification Clause 405.(A) By Manual Means |
| 5 | Brick solingi) Brick on edge solingProviding and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross- section shown on the drawing, filling joints with sand, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 6 | ii) Flat Brick solingProviding and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 7 | iii) Brick edging laid in full brick widthProviding and laying brick edging on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 8 | Tack CoatTack coat using hot straight run bitumen of grade VG-30 on bituminous surfaceProviding and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: On bituminous surface @ 0.50 Kg/ Sqm. |
| 9 | Tack coat using hot straight run bitumen of grade VG-30 on W.B.M.Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: On W.B.M. @ 0.75 kg/ sqm. |
| 10 | 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) BinderProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508.Case - I : By Mechanical Means(I) Bitumen of VG-30 |
| 11 | Seal CoatProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510.(A) By Manual MeansCase - IV : Type D (premix with fine sand)(I) Bitumen of VG-30 |
| 12 | Maintenance of Earthen shoulder (2) Maintenance of Earthen shoulder (Stripping of excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903. |
| 13 | Maintenance of bituminous surface road(I) Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with 75 mm B.M, after applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per MoRD technical specification Clauses 1900, 502, 503 and 504. |
| 14 | Surface DrainsConstruction of unlined surface drains of average cross- sectional area 0.40 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per MoRD Technical Specification Clause 307.(i) Surface Drains in Ordinary Soil(A) Manual Means |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender