| 1 | CIVIL CONSTRUCTION WORK (Phase –II) |
| 2 | Dismantling, clearing away and carefully stacking materials useful for any thickness of walls of bricks, in cement mortar including disposal of debris. (Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material as per direction of Engineer-in-charge). |
| 3 | Dismantling existing CC&RCC floors, cement concrete, steel work, including T& P and scaffolding where ever necessary sorting the dismantled material , disposal of un serviceable materials and stacking the serviceable material with all lifts and lead (Demolishing RCC work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material as per direction of Engineer in charge). |
| 4 | Earthwork excavation for hard soil in foundation (trench)and conveying the soil up to a distance 200 m and pointed out by the authorities including neat banking all leads and lifts etc. complete (Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq. M on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed). |
| 5 | PCC 1:3:6 in foundation PCC in 1:3:6 nominal mix in foundation with cement crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibrating, curing.excluding cost of cement Etc complete. (Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40mm nominal size) |
| 6 | Brick masonry in cm 1:5 using cement solid block approved quality and size for trench wall with excluding cost of cement charges etc. complete (Brick masonry in cement mortar 1:5 using cement solid block approved quality and size for trench wall with all cost and conveyance). |
| 7 | Plastering with cm 1:4 , 12 mm thick one coat including, finishing all corners with neat cement grout excluding cost of cement. Complete |
| 8 | Centering and shuttering including strutting etc. and removal form work as per specification |
| 9 | Plain/ Reinforcement cement concrete in floor and available places complete by vibration including curing as per drawing and technical specifications RCC Grade M 25 using concrete mixer excluding cost of cement. (Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, columns, pillars, piers, abutment, posts and struts etc, up to floor five level excluding cost of cement, centering shuttering finishing and reinforcement. M 25) |
| 10 | Labour Charges for Fitting, bending and placing un-coated HYSD bar reinforcement in foundation complete as per drawing technical specifications and excluding cost of steel. (Labour Charges for Steel reinforcement for R.C.C work including straightening, cuffing, bending placing is position and binding all complete up to plinth level). |
| 11 | vacuum dewater flooring over existing RCC flooring with cement concrete M15 using 6mm (40%) and 12 mm metal(60%), 60mm thick after spraying latex solution(1 ltr +/10 m2 ) and top finished with industrial floor hardener (chapdur /Dr: fixit at 3kg / m2 ) and power toweled to get smooth finish cutting expansion grooves (1m x1 m intervals) and filling with 1 gas/sea land (one kg for 15 running meter) including all labour charges cement steel and all floors hardening materials |
| 12 | Fixing Humidification floor grills and frames (will be provided by the mill). In concrete after making necessary holes in trench slab and finishing the openings with cement grout with all charges |
| 13 | Cutting expansion joint in flooring Concrete of specified size and filling solvent free filler with all cost and charges |