Extention of HT/LT line in/c installation of 11/0.43 KV, 63 KVA Distribution Sub Statiion for providing 3 ph Service connection to 51 (Fifty one ) No ofDTW Scheme under ED Jirania (partial turnkey ), jirania-Tripura

Tripura State Electricity Corporation Limited-TSECL has published Extention of HT/LT line in/c installation of 11/0.43 KV, 63 KVA Distribution Sub Statiion for providing 3 ph Service connection to 51 (Fifty one ) No ofDTW Scheme under ED Jirania (partial turnkey ). Submission Date for this Tender is 10-08-2022. Overhead Line Tenders in jirania Tripura. Bidders can get complete Tender details and download the document.




Tender Notice

33327666
Corrigendum : Extention of HT/LT line in/c installation of 11/0.43 KV, 63 KVA Distribution Sub Statiion for providing 3 ph Service connection to 51 (Fifty one ) No ofDTW Scheme under ED Jirania (partial turnkey )
Open Tender
Indian
Tripura
jirania
10-08-2022

Tender Details

Extention of HT/LT line in/c installation of 11/0.43 KV, 63 KVA Distribution Sub Statiion for providing 3 ph Service connection to 51 (Fifty one ) No ofDTW Scheme under ED Jirania (partial turnkey )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 03-Aug-2022 Corrigendum Date 10-08-2022

Key Value

Document Fees
INR 2000 /-
EMD
INR 129826.0 /-
Tender Value
INR 64.91 Lakhs /-

BOQ Items

Name of Work: Extention of HT/LT line in/c installation of 11/0.43 KV, 63 KVA Distribution Sub Statiion for providing 3 ph Service connection to 51 (Fifty one ) No ofDTW Scheme under ED Jirania (partial turnkey )
Sl. No. Item Description
1Supplyof 9 mtr long PCC pole direct in Earth inc Excavation ,Back filling & ramming etc as Required ( the poles should be Burried 1/6 th of their length) as per Technical Specification 9 Mtr. Long pcc pole
2Supply of Stay Set Complete
3Suppl;y of Stay Wire
4Supply of HT Stay Insulator
5Supplyof 11 KV polymeric pin insulator along with necessary fittings.
6Supply of 11 KV Disc insulator
7Supply of 11 KV Disc fitting
8Supply, of conductor 6/1/2.59 mm ACSR WEASEL including laying hoisting, binding and jumpering etc. Complete as reqd. Single conductor per KM.
9Supplyof 1 KM (Single conductor ) 8SWG GI wire in/c hoistingand binding etc complete as required
10Supplyof 11 KVCraddle Guarding by GI wire 8 SWG as per technical specification in horizontal specification
11Supply,of triple pole ( 3 ph , 12 KV , 200 A manually Gang operated air Breakswitch including necessary Connection
12Supply,of triple pole ( 3 ph , 12 KV , 200 A manually Drop out fuse unitsuitable for operation for 11 KV 50 Hz AC system including necessary Connection
13Supplyof 11 kv SP metal oxide gapless surge type LA suitable for nominal system voltage of 11 KV inc Necessary Connection
14Supply of MS channel cross arm of 0.3/1.2/2.2/2.8 Mtr length 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
15Supplyof MS Anglearm of1.5/2.3/3.1 mtr length 65X65X6mm (Excluding the cost of bracket clamps, nuts & bolts.).
16Supplyof MS Channel cross arm of 0.8/2.8 mtr length 100X50X50X6mm (Excluding the cost of bracket clamps, nuts & bolts.).
17Supply of febricated Clamp of assorted size of MS flat (50X6 mm) with double coat of red oxideprimer coat (Bkt Clamp-1390 nos and Stay clamp250 nos)
18Supply of Nuts and Bolt of assorted size
19Supply of straps with nuts and bolts
20Supply with fitting fixing of Cutouts(set of 3 nos )on wooden plank(preferably korai wood) of size 24 "X10"X1.5" & cable connections with termination by lugs/thimbles)complete (i/c supply of wooden plank, screws and MS clamp excluding cost of Thimble)
21Supplyof 100 Amps Cut out
22Supply of 2.5 mtr long, 40 mm dia GI Pipe (make TATA/JINDAL) for earthing.
23Supply of 60 Kg Salt & 55 kg Charcoal for Earthing (For 1 pit).
24Supplyof 8 swg GI wire at 300 mm below the ground level for earthing of Sub Station equipments and LAfrom GI Pipe
25Supply of 95 Sq mm Bimetalic lugs for connecting one cable with another cable or connection more than two cable
26Supply of 16 sq mm PVC cable for providing new service connection to spot located under DWS Scheme
27Supply of 70 sqmm PVC for loop completion inbetween Transformer and Cutout
28Errection of 9 mtr long PCC pole direct in Earth inc Excavation ,Back filling & ramming etc as Required ( the poles should be Burried 1/6 th of their length) as per Technical Specification 9 Mtr. Long pcc pole
29Erection of stay set direct in earth complete with 19mm x 1800 mm long stay rod, anchor plate of size 300x300x8mm, turn buckle, 7/3.15 mm dia GI standard stay wire and strain insulator etc
30Erection of 11 KV polymeric pin insulator along with necessary fittings.
31Erection of 11 KV polymeric disc insulator along with necessary fittings. (Excluding the cost of fittings).
32Erection/Laying and stringing of conductor 6/1/2.59 mm ACSR WEASEL including laying hoisting, binding and jumpering etc. Complete as reqd. Single conductor per KM.
33Erection/Laying & stringing of 1 KM (Single conductor ) 8SWG GI wire in/c hoistingand binding etc complete as required
34Erection of 11 KVCraddle Guarding by GI wire 8 SWG as per technical specification in horizontal specification
35Erection& connection of triple pole ( 3 ph , 12 KV , 200 A manually Gang operated air Breakswitch including necessary Connection
36Erection& connection of triple pole ( 3 ph , 12 KV , 200 A manually Drop out fuse unitsuitable for operation for 11 KV 50 Hz AC system including necessary Connection
37Erection of 11 kv SP metal oxide gapless surge type LA suitable for nominal system voltage of 11 KV inc Necessary Connection
38Erection of MS channel cross arm,0.3 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
39Erection of MS channel cross arm, 1.2 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
40Erection of MS channel cross arm, 2.2 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
41Erection of MS channel cross arm, 2.8 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
42Erection of MS Angle of arm, 1.5 mtr long 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
43Erection of MS Angle ofarm, 2.3 mtr long 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
44Erection of MS Angle of arm, 3.1 mtr long 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
45Erection of MS channel cross arm, 2.8 mtr long100X50X50X6mm (Excluding the cost of bracket clamps, nuts & bolts.).
46Erection of MS channel cross arm, 0.8 mtr long100X50X50X6mm (Excluding the cost of bracket clamps, nuts & bolts.).
47Erectionof 2.5 mtr long, 40 mm dia GI Pipe (make TATA/JINDAL) for earthing.
48Erection/ Laying of 8 swg GI wire at 300 mm below the ground level for earthing of Sub Station equipments and LAfrom GI Pipe
49Installation/Positioning of 11/0.43 KV,3 ph 63 KVA of Distribution Transformer on pole with necessary connections and fitting fixing of all allied accessories components as required for making complete in all respect of energizing.
50Providing 3 ph Service Connection with laying PVC cable from nearby electrical pole to premises upto 35 mtr in length supported by GI Wire Reel Insulator i/c fitting fixing of energy meter as required
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail