Tripura State Electricity Corporation Limited-TSECL has published Extention of HT/LT line in/c installation of 11/0.43 KV, 63 KVA Distribution Sub Statiion for providing 3 ph Service connection to 51 (Fifty one ) No ofDTW Scheme under ED Jirania (partial turnkey ). Submission Date for this Tender is 10-08-2022. Overhead Line Tenders in jirania Tripura. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 03-Aug-2022 | Corrigendum | Date | 10-08-2022 |
Sl. No. | Item Description |
1 | Supplyof 9 mtr long PCC pole direct in Earth inc Excavation ,Back filling & ramming etc as Required ( the poles should be Burried 1/6 th of their length) as per Technical Specification 9 Mtr. Long pcc pole |
2 | Supply of Stay Set Complete |
3 | Suppl;y of Stay Wire |
4 | Supply of HT Stay Insulator |
5 | Supplyof 11 KV polymeric pin insulator along with necessary fittings. |
6 | Supply of 11 KV Disc insulator |
7 | Supply of 11 KV Disc fitting |
8 | Supply, of conductor 6/1/2.59 mm ACSR WEASEL including laying hoisting, binding and jumpering etc. Complete as reqd. Single conductor per KM. |
9 | Supplyof 1 KM (Single conductor ) 8SWG GI wire in/c hoistingand binding etc complete as required |
10 | Supplyof 11 KVCraddle Guarding by GI wire 8 SWG as per technical specification in horizontal specification |
11 | Supply,of triple pole ( 3 ph , 12 KV , 200 A manually Gang operated air Breakswitch including necessary Connection |
12 | Supply,of triple pole ( 3 ph , 12 KV , 200 A manually Drop out fuse unitsuitable for operation for 11 KV 50 Hz AC system including necessary Connection |
13 | Supplyof 11 kv SP metal oxide gapless surge type LA suitable for nominal system voltage of 11 KV inc Necessary Connection |
14 | Supply of MS channel cross arm of 0.3/1.2/2.2/2.8 Mtr length 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.). |
15 | Supplyof MS Anglearm of1.5/2.3/3.1 mtr length 65X65X6mm (Excluding the cost of bracket clamps, nuts & bolts.). |
16 | Supplyof MS Channel cross arm of 0.8/2.8 mtr length 100X50X50X6mm (Excluding the cost of bracket clamps, nuts & bolts.). |
17 | Supply of febricated Clamp of assorted size of MS flat (50X6 mm) with double coat of red oxideprimer coat (Bkt Clamp-1390 nos and Stay clamp250 nos) |
18 | Supply of Nuts and Bolt of assorted size |
19 | Supply of straps with nuts and bolts |
20 | Supply with fitting fixing of Cutouts(set of 3 nos )on wooden plank(preferably korai wood) of size 24 "X10"X1.5" & cable connections with termination by lugs/thimbles)complete (i/c supply of wooden plank, screws and MS clamp excluding cost of Thimble) |
21 | Supplyof 100 Amps Cut out |
22 | Supply of 2.5 mtr long, 40 mm dia GI Pipe (make TATA/JINDAL) for earthing. |
23 | Supply of 60 Kg Salt & 55 kg Charcoal for Earthing (For 1 pit). |
24 | Supplyof 8 swg GI wire at 300 mm below the ground level for earthing of Sub Station equipments and LAfrom GI Pipe |
25 | Supply of 95 Sq mm Bimetalic lugs for connecting one cable with another cable or connection more than two cable |
26 | Supply of 16 sq mm PVC cable for providing new service connection to spot located under DWS Scheme |
27 | Supply of 70 sqmm PVC for loop completion inbetween Transformer and Cutout |
28 | Errection of 9 mtr long PCC pole direct in Earth inc Excavation ,Back filling & ramming etc as Required ( the poles should be Burried 1/6 th of their length) as per Technical Specification 9 Mtr. Long pcc pole |
29 | Erection of stay set direct in earth complete with 19mm x 1800 mm long stay rod, anchor plate of size 300x300x8mm, turn buckle, 7/3.15 mm dia GI standard stay wire and strain insulator etc |
30 | Erection of 11 KV polymeric pin insulator along with necessary fittings. |
31 | Erection of 11 KV polymeric disc insulator along with necessary fittings. (Excluding the cost of fittings). |
32 | Erection/Laying and stringing of conductor 6/1/2.59 mm ACSR WEASEL including laying hoisting, binding and jumpering etc. Complete as reqd. Single conductor per KM. |
33 | Erection/Laying & stringing of 1 KM (Single conductor ) 8SWG GI wire in/c hoistingand binding etc complete as required |
34 | Erection of 11 KVCraddle Guarding by GI wire 8 SWG as per technical specification in horizontal specification |
35 | Erection& connection of triple pole ( 3 ph , 12 KV , 200 A manually Gang operated air Breakswitch including necessary Connection |
36 | Erection& connection of triple pole ( 3 ph , 12 KV , 200 A manually Drop out fuse unitsuitable for operation for 11 KV 50 Hz AC system including necessary Connection |
37 | Erection of 11 kv SP metal oxide gapless surge type LA suitable for nominal system voltage of 11 KV inc Necessary Connection |
38 | Erection of MS channel cross arm,0.3 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.). |
39 | Erection of MS channel cross arm, 1.2 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.). |
40 | Erection of MS channel cross arm, 2.2 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.). |
41 | Erection of MS channel cross arm, 2.8 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.). |
42 | Erection of MS Angle of arm, 1.5 mtr long 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.). |
43 | Erection of MS Angle ofarm, 2.3 mtr long 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.). |
44 | Erection of MS Angle of arm, 3.1 mtr long 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.). |
45 | Erection of MS channel cross arm, 2.8 mtr long100X50X50X6mm (Excluding the cost of bracket clamps, nuts & bolts.). |
46 | Erection of MS channel cross arm, 0.8 mtr long100X50X50X6mm (Excluding the cost of bracket clamps, nuts & bolts.). |
47 | Erectionof 2.5 mtr long, 40 mm dia GI Pipe (make TATA/JINDAL) for earthing. |
48 | Erection/ Laying of 8 swg GI wire at 300 mm below the ground level for earthing of Sub Station equipments and LAfrom GI Pipe |
49 | Installation/Positioning of 11/0.43 KV,3 ph 63 KVA of Distribution Transformer on pole with necessary connections and fitting fixing of all allied accessories components as required for making complete in all respect of energizing. |
50 | Providing 3 ph Service Connection with laying PVC cable from nearby electrical pole to premises upto 35 mtr in length supported by GI Wire Reel Insulator i/c fitting fixing of energy meter as required |