}

Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited , Supply Of Pru Column ( Lli ) For Nrep Project, numaligarh-Assam

Numaligarh Refinery Limited has published Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited , Supply Of Pru Column ( Lli ) For Nrep Project. Submission Date for this Tender is 18-10-2022. Holding and Clamping Tools Tenders in numaligarh Assam. Bidders can get complete Tender details and download the document.




Tender Notice

33318874
Corrigendum : Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited , Supply Of Pru Column ( Lli ) For Nrep Project
Open Tender
Indian
Assam
numaligarh
18-10-2022

Tender Details

Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited , Supply Of Pru Column ( Lli ) For Nrep Project , Design, Detail Engineering, Procurement, Fabrication, Site Assembly ( As Mentioned In Mr / Technical Specification ) Inspection, Testing, Transportation, Route Survey ( If Required ) And Supply Including Erection As Mentioned In Mr Of Pru Column ( Lli ) - C3 Splitter #1 ( Tag. No. 1P25-Cc-3127 ) ( Qty-1 No ) With Accessories, Commissioning Spares, Special Tools And Tackles ( Excluding Charges For Hydraulic Bolt Tensioner And Charges For Spare Parts For Two Year Operation ) And Supply Upto Delivery Point As Specified In The Nit. , Design, Detail Engineering, Procurement, Fabrication, Site Assembly ( As Mentioned In Mr / Technical Specification ) Inspection, Testing, Transportation, Route Survey ( If Required ) And Supply Including Erection As Mentioned In Mr Of Pru Column ( Lli ) - C3 Splitter #2 ( Tag. No. 1P25-Cc-3128 ) ( Qty-1 No ) With Accessories, Commissioning Spares, Special Tools And Tackles ( Excluding Charges For Hydraulic Bolt Tensioner And Charges For Spare Parts For Two Year Operation ) And Supply Upto Delivery Point As Specified In The Nit. , Charges For Site Supervision Of Erection / Installation Andtesting For Pru Columns ( Lli ) , Per Diem Charges For Upto 8 Hours Work On Normal Working Days. , Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days. , Overtime Rate / Hour For Work On Weekly Off Days / Holidays ( As Applicable To Refinery Site ) .

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 24-Aug-2022 Addendum_2_RevBOQ BOQ 05-09-2022
2 24-Aug-2022 Addendum_1_TechClar1 Other 05-09-2022
3 29-Aug-2022 Addendum_03_Comm_Clar_1 Other 05-09-2022
4 05-Sep-2022 Addendum_04_PRU_Column_EXT1 Date 12-09-2022
5 12-Sep-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 19-09-2022
6 19-Sep-2022 Addendum_6_Ext3 Date 26-09-2022
7 22-Sep-2022 Addendum_7_TechClar2 Other 26-09-2022
8 22-Sep-2022 Addendum_08_EXT_4 Date 03-10-2022
9 04-Oct-2022 Addendum_10_TechClar3 Other 18-10-2022
10 04-Oct-2022 Addendum_9_EXT_5 Date 18-10-2022

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: SUPPLY OF PRU COLUMNS (LLI) FOR NREP PROJECT
Sl. No. Item Description
1SUPPLY OF PRU COLUMN (LLI) FOR NREP PROJECT
2Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and supply including erection as mentioned in MR of PRU COLUMN (LLI) - C3 Splitter #1 (Tag. No. 1P25-CC-3127) (Qty-1 No) with accessories, Commissioning Spares, Special Tools and Tackles (excluding charges for hydraulic bolt tensioner and Charges for Spare Parts for two year operation) And Supply upto Delivery Point as specified in the NIT.
3Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and supply including erection as mentioned in MR of PRU COLUMN (LLI) - C3 Splitter #2 (Tag. No. 1P25-CC-3128) (Qty-1 No) with accessories, Commissioning Spares, Special Tools and Tackles (excluding charges for hydraulic bolt tensioner and Charges for Spare Parts for two year operation) And Supply upto Delivery Point as specified in the NIT.
4Charges for SITE Supervision of Erection / Installation andTesting for PRU COLUMNS (LLI)
5Per diem charges for upto 8 hours work on normal working days.
6Overtime rate / hour beyond normal 8 hours work on normal working days.
7Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site).
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail