Numaligarh Refinery Limited has published Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited Supply Of Pru Columns ( Lli ) As Per Technical Specifications For Numaligarh Refinery Limited , Supply Of Pru Column ( Lli ) For Nrep Project. Submission Date for this Tender is 18-10-2022. Holding and Clamping Tools Tenders in numaligarh Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Aug-2022 | Addendum_2_RevBOQ | BOQ | 05-09-2022 |
2 | 24-Aug-2022 | Addendum_1_TechClar1 | Other | 05-09-2022 |
3 | 29-Aug-2022 | Addendum_03_Comm_Clar_1 | Other | 05-09-2022 |
4 | 05-Sep-2022 | Addendum_04_PRU_Column_EXT1 | Date | 12-09-2022 |
5 | 12-Sep-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 19-09-2022 |
6 | 19-Sep-2022 | Addendum_6_Ext3 | Date | 26-09-2022 |
7 | 22-Sep-2022 | Addendum_7_TechClar2 | Other | 26-09-2022 |
8 | 22-Sep-2022 | Addendum_08_EXT_4 | Date | 03-10-2022 |
9 | 04-Oct-2022 | Addendum_10_TechClar3 | Other | 18-10-2022 |
10 | 04-Oct-2022 | Addendum_9_EXT_5 | Date | 18-10-2022 |
Sl. No. | Item Description |
1 | SUPPLY OF PRU COLUMN (LLI) FOR NREP PROJECT |
2 | Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and supply including erection as mentioned in MR of PRU COLUMN (LLI) - C3 Splitter #1 (Tag. No. 1P25-CC-3127) (Qty-1 No) with accessories, Commissioning Spares, Special Tools and Tackles (excluding charges for hydraulic bolt tensioner and Charges for Spare Parts for two year operation) And Supply upto Delivery Point as specified in the NIT. |
3 | Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and supply including erection as mentioned in MR of PRU COLUMN (LLI) - C3 Splitter #2 (Tag. No. 1P25-CC-3128) (Qty-1 No) with accessories, Commissioning Spares, Special Tools and Tackles (excluding charges for hydraulic bolt tensioner and Charges for Spare Parts for two year operation) And Supply upto Delivery Point as specified in the NIT. |
4 | Charges for SITE Supervision of Erection / Installation andTesting for PRU COLUMNS (LLI) |
5 | Per diem charges for upto 8 hours work on normal working days. |
6 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
7 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail