Extension And Remodeling Of Pipe Line And Other Allied Works At Different Dtw Schemes Under Dws Sub-Division, Sabroom During The Year 2022-23 (Gr-I).
Tender Value
16.60 Lakhs
Estimated cost
Bid Submission
17 Aug 2022
0 days left
EMD
33210
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
belonia → Tripura
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Extension And Remodeling Of Pipe Line And Other Allied Works At Different Dtw Schemes Under Dws Sub-Division, Sabroom During The Year 2022-23 (Gr-I).
BOQ
| Sl. No. | Item Description |
| 1 | Excavating trenches of required widthfor pipes, cables etc. including exacavation for sockets, dressing of sides where required, ramming of bottoms, depth upto 1500 mm(slope-1 in 200)including getting out the excavated soil and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil with all required leads as per Chapter - 2 of CPWD specification and direction of the Engineer - in - charge. A) For UPVC pipes in new work a) In all kinds of soil |
| 2 | i) For pipes not exceeding 90 mm dia |
| 3 | ii) For pipes exceeding 90 mm dia but not exceeding 300 mm dia |
| 4 | Providing, fixing and laying rigid UPVC pipes conforming to IS : 4985 jointing with couplers, of same class conforming to IS : 10124 ( Pt-II ) with solvent cement conforming to IS : 14182 including testing of joints complete ( but excluding the cost of specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.A. Class - 3 ( working pressure 6.0 kg / cm2) |
| 5 | i) 40 mm OD |
| 6 | ii) 50 mm OD |
| 7 | iii) 90 mm OD. |
| 8 | iv) 110 mm OD. |
| 9 | v) 140 mm OD. |
| 10 | Providing, fixing and laying fabricated UPVC bend of required degree conforming to IS : 10124 ( part 8 / 9 / 10 / 11 / 12 / 13 ) with solvent cementconforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge. |
| 11 | i) 40 mm OD |
| 12 | ii) 50 mm OD |
| 13 | iii) 90 mm OD |
| 14 | iv) 110 mm OD |
| 15 | v) 140 mm OD |
| 16 | Providing, fixing and laying fabricated UPVC end cap conforming to IS : 10124 ( Part 4 ) with solvent cementconforming to IS : 14182 including testing of joints complete as perCPWD specification and direction of the Engineer - in - charge. |
| 17 | i) 40 mm OD |
| 18 | ii) 50 mm OD |
| 19 | iii) 90 mm OD |
| 20 | iv) 110 mm OD |
| 21 | v) 140 mm OD |
| 22 | Providing, fixing and laying fabricated UPVC equal tee conforming to IS : 10124 ( Part 5 ) with solvent cementconforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge. |
| 23 | i) 40 mm OD |
| 24 | ii) 50 mm OD |
| 25 | iii) 90 mm OD |
| 26 | iv) 110 mm OD |
| 27 | v) 140 mm OD |
| 28 | Providing, fixing and laying fabricated UPVC straight reducer conforming to IS : 10124 ( Part 3 ) with solvent cementconforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge. |
| 29 | i) 50 x 40 mm dia |
| 30 | ii) 110 x 90 mm dia |
| 31 | iii) 140 x 110 mm dia |
| 32 | iv) 140 x 90 mm dia |
| 33 | Making road crossing by horizontal boringfor smooth laying of UPVC / CI / DI / GI pipes etc.of required dia complete as per specification and the direction of the Engineer-in-charge.i) by manual means |
| 34 | Providing and fixingC.I. sluice valves ( with cap ) complete with bolts, nuts, rubber insertions etc. ( the tail pieces if required will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge. |
| 35 | i) 100 mm dia.A) PN - 1.6 |
| 36 | ii) 125 mm dia.A) PN - 1.6 |
| 37 | iii) 150 mm dia.A) PN - 1.6 |
| 38 | Constructing masonry Chamber 90 x 90 x 100 cm, inside with brick work in cement mortar 1 : 4 ( 1 cement : 4 fine sand ) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside ) with chained lid and RCC top slab 1 : 2 : 4 mix ( 1 cement : 2 fine sand:4 brick aggregate 1st class 20 mm nominal size ) necessary excavation foundation concrete 1 : 5 : 10 ( 1 cement : 5 fine sand : 10 brick aggregate 1st class 40mm nominal size )and inside plastering with cement mortar 1 : 3 ( 1 cement : 3 fine sand ) 12 mm thick finished with a floating coat ofneat cement complete asperstandard design, CPWD specification and direction of the Engineer - in - charge.i) With 1st class bricks. |
| 39 | Providing and fixing in position Precast RCC hydrant post of size 200 x 200 mm at the bottom & 150 x 150 mm at the topand 1300 mm high ( made with cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 brick aggregate 1st class 20 mm nominal size) and steel reinforcement ( TMT bars )8 mm dia 1200 mm long 4 nos and 8 mm dia stirrup 9 Nos ), 500 mm shall be kept below ground level , embedding the same with in 500 x 500 x 500 mm cement concrete 1 : 5 : 10( 1 cement : 5 sand : 10 brick aggregate 1st class 40 mm nominal size ) including plastering the exposed surface with 12 mm thick cement mortar 1 : 3 ( 1 cement: 3 sand ) finished with a floating coat of neat cement ) including providing & embedding 15 mm dia G.I. pipe (medium class) 1250 mm long with necessary GI fittings like elbow 2 Nos, socket 1 no, nipple 300 mm long 1 no, union 1 no etc. and fitting fixing of CI long handle bib cock by welding with GI socket complete with all earth work required including refilling as per CPWD specification and direction of Engineer-in-charge. |
| 40 | Charges for cutting D.I. pipe with steel saw by manual means as per CPWD specification and direction of the Engineer - in - charge. |
| 41 | i) 125 mm dia |
| 42 | ii) 150 mm dia |
| 43 | Providing and fixing Chlorinated Polyvinyl Chloride ( CPVC ) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings, this included jointing of pipes & fittings with one step CPVC solvent cement,trenching. refilling & testing of joints complete as per chapter 20 of CPWD specification and direction of the Engineer - in - charge. |
| 44 | Charges fordismantlingPVC/HDPEpipeafternecessary excavationofearthincludingwashingandstackingofpipes properly at site with all leads and lifts and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. completeas per specification & direction of the Engineer-in-charge. |
| 45 | i) 90 mm dia |
| 46 | ii) 110 mm dia |
| 47 | iii) 140 mm dia |
| 48 | Charges for repairing of leakage in UPVC / HDPE pipe line with PVC coupler & solvent cement etc. including necessary earth excavation, backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. completeas per specification & direction of the Engineer-in-charge. |
| 49 | i) 90 mm OD |
| 50 | ii) 110 mm OD |
| 51 | iii) 140 mm OD |
| 52 | Clearing of diposited iron inside of laid PVC pipe line (90 mm/110 mm / 140 mm) excavation trenches for 100.00 mtr laid pipe line of required width and depth at an interval of 2.00 mtr to 3.00 mtr long for every 100.00 mtr. Clearing through UPVC coil pipe and laying same with coupler and cement solvent joint (PVC coupler and solvent cement to be issued at free of cost from the department) |
| 53 | Charges for dismantling PVC / HDPE pipe after necessary excavation of earth including washing and stacking of pipes properly at site with all leads and lifts and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer byramming, watering etc. complete as per specification &direction of the Engineer-in-charge. |
| 54 | i) 90 mm dia. |
| 55 | ii) 110 mm dia. |
| 56 | iii)140 mm dia. |
| 57 | Clearing of diposited iron inside of laid CI/DI pipe line of different dia (150 mm/100 mm / 125 mm) and dismantling including trenching, refilling for every 100.00 mtr laid pipe line of required widht and depth, cutting for every 100.00 mtr pipe iron throug PVC coil pipe after clearing washing and laying the same with rubber gusket pipe layed joint as per direction of the Engineer-in-charge. (Pig lead will be issued by the department at free of cost but rubber gusket and other T&P will be arranged by the agency) |
| 58 | Providing and laying of flexible PVC pipe (conforming to IS:7634) complete as per specification and direction of the Engineer - in - charge (cost of earth work and fittings will be paid separately) |
| 59 | Charges for push-on ( Tyton ) joints to centrifugually ( Spun ) cast iron pipes or ductile iron pipes including testing of joints and including the cost of rubber gasket as per CPWD specification and direction of the Engineer - in - charge. |
| 60 | i. 100 mm dia |
| 61 | ii. 125 mm dia |
| 62 | iii. 150 mm dia |
AI Tender Summary
Tender Timeline
Jul 29, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedAug 17, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 17, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender