Housing Urban and Rular Development Government Departments Closing in 0 days TDR #33314775

Extension And Remodeling Of Pipe Line And Other Allied Works At Different Dtw Schemes Under Dws Sub-Division, Sabroom During The Year 2022-23 (Gr-I).

Issued by Government Departments · belonia, Tripura
Tender Value
16.60 Lakhs
Estimated cost
Bid Submission
17 Aug 2022
0 days left
EMD
33210
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
belonia → Tripura
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Extension And Remodeling Of Pipe Line And Other Allied Works At Different Dtw Schemes Under Dws Sub-Division, Sabroom During The Year 2022-23 (Gr-I).

BOQ

Name of Work: Retrofitting of existing scheme within the jurisdiction of DWS Division Belonia / S.H: Extension and remodeling of pipe line and other allied works at DTW schemes at Kalijoy Roaja Para, Premchand Para, Ramjiban Para, Laban Roaja Para, Gokul Roaja Para, Biswarai Para, Narendra Roaja Para, Fakir Chand Para, Gobinda Sardar Para & Raj Kr. Chow. Para under DWS Sub-Division, Sabroom during the year 2022-23 (Gr-I).
Sl. No. Item Description
1Excavating trenches of required widthfor pipes, cables etc. including exacavation for sockets, dressing of sides where required, ramming of bottoms, depth upto 1500 mm(slope-1 in 200)including getting out the excavated soil and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil with all required leads as per Chapter - 2 of CPWD specification and direction of the Engineer - in - charge. A) For UPVC pipes in new work a) In all kinds of soil
2i) For pipes not exceeding 90 mm dia
3ii) For pipes exceeding 90 mm dia but not exceeding 300 mm dia
4Providing, fixing and laying rigid UPVC pipes conforming to IS : 4985 jointing with couplers, of same class conforming to IS : 10124 ( Pt-II ) with solvent cement conforming to IS : 14182 including testing of joints complete ( but excluding the cost of specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.A. Class - 3 ( working pressure 6.0 kg / cm2)
5i) 40 mm OD
6ii) 50 mm OD
7iii) 90 mm OD.
8iv) 110 mm OD.
9v) 140 mm OD.
10Providing, fixing and laying fabricated UPVC bend of required degree conforming to IS : 10124 ( part 8 / 9 / 10 / 11 / 12 / 13 ) with solvent cementconforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.
11i) 40 mm OD
12ii) 50 mm OD
13iii) 90 mm OD
14iv) 110 mm OD
15v) 140 mm OD
16Providing, fixing and laying fabricated UPVC end cap conforming to IS : 10124 ( Part 4 ) with solvent cementconforming to IS : 14182 including testing of joints complete as perCPWD specification and direction of the Engineer - in - charge.
17i) 40 mm OD
18ii) 50 mm OD
19iii) 90 mm OD
20iv) 110 mm OD
21v) 140 mm OD
22Providing, fixing and laying fabricated UPVC equal tee conforming to IS : 10124 ( Part 5 ) with solvent cementconforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.
23i) 40 mm OD
24ii) 50 mm OD
25iii) 90 mm OD
26iv) 110 mm OD
27v) 140 mm OD
28Providing, fixing and laying fabricated UPVC straight reducer conforming to IS : 10124 ( Part 3 ) with solvent cementconforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.
29i) 50 x 40 mm dia
30ii) 110 x 90 mm dia
31iii) 140 x 110 mm dia
32iv) 140 x 90 mm dia
33Making road crossing by horizontal boringfor smooth laying of UPVC / CI / DI / GI pipes etc.of required dia complete as per specification and the direction of the Engineer-in-charge.i) by manual means
34Providing and fixingC.I. sluice valves ( with cap ) complete with bolts, nuts, rubber insertions etc. ( the tail pieces if required will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.
35i) 100 mm dia.A) PN - 1.6
36ii) 125 mm dia.A) PN - 1.6
37iii) 150 mm dia.A) PN - 1.6
38Constructing masonry Chamber 90 x 90 x 100 cm, inside with brick work in cement mortar 1 : 4 ( 1 cement : 4 fine sand ) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside ) with chained lid and RCC top slab 1 : 2 : 4 mix ( 1 cement : 2 fine sand:4 brick aggregate 1st class 20 mm nominal size ) necessary excavation foundation concrete 1 : 5 : 10 ( 1 cement : 5 fine sand : 10 brick aggregate 1st class 40mm nominal size )and inside plastering with cement mortar 1 : 3 ( 1 cement : 3 fine sand ) 12 mm thick finished with a floating coat ofneat cement complete asperstandard design, CPWD specification and direction of the Engineer - in - charge.i) With 1st class bricks.
39Providing and fixing in position Precast RCC hydrant post of size 200 x 200 mm at the bottom & 150 x 150 mm at the topand 1300 mm high ( made with cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 brick aggregate 1st class 20 mm nominal size) and steel reinforcement ( TMT bars )8 mm dia 1200 mm long 4 nos and 8 mm dia stirrup 9 Nos ), 500 mm shall be kept below ground level , embedding the same with in 500 x 500 x 500 mm cement concrete 1 : 5 : 10( 1 cement : 5 sand : 10 brick aggregate 1st class 40 mm nominal size ) including plastering the exposed surface with 12 mm thick cement mortar 1 : 3 ( 1 cement: 3 sand ) finished with a floating coat of neat cement ) including providing & embedding 15 mm dia G.I. pipe (medium class) 1250 mm long with necessary GI fittings like elbow 2 Nos, socket 1 no, nipple 300 mm long 1 no, union 1 no etc. and fitting fixing of CI long handle bib cock by welding with GI socket complete with all earth work required including refilling as per CPWD specification and direction of Engineer-in-charge.
40Charges for cutting D.I. pipe with steel saw by manual means as per CPWD specification and direction of the Engineer - in - charge.
41i) 125 mm dia
42ii) 150 mm dia
43Providing and fixing Chlorinated Polyvinyl Chloride ( CPVC ) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings, this included jointing of pipes & fittings with one step CPVC solvent cement,trenching. refilling & testing of joints complete as per chapter 20 of CPWD specification and direction of the Engineer - in - charge.
44Charges fordismantlingPVC/HDPEpipeafternecessary excavationofearthincludingwashingandstackingofpipes properly at site with all leads and lifts and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. completeas per specification & direction of the Engineer-in-charge.
45i) 90 mm dia
46ii) 110 mm dia
47iii) 140 mm dia
48Charges for repairing of leakage in UPVC / HDPE pipe line with PVC coupler & solvent cement etc. including necessary earth excavation, backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. completeas per specification & direction of the Engineer-in-charge.
49i) 90 mm OD
50ii) 110 mm OD
51iii) 140 mm OD
52Clearing of diposited iron inside of laid PVC pipe line (90 mm/110 mm / 140 mm) excavation trenches for 100.00 mtr laid pipe line of required width and depth at an interval of 2.00 mtr to 3.00 mtr long for every 100.00 mtr. Clearing through UPVC coil pipe and laying same with coupler and cement solvent joint (PVC coupler and solvent cement to be issued at free of cost from the department)
53Charges for dismantling PVC / HDPE pipe after necessary excavation of earth including washing and stacking of pipes properly at site with all leads and lifts and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer byramming, watering etc. complete as per specification &direction of the Engineer-in-charge.
54i) 90 mm dia.
55ii) 110 mm dia.
56iii)140 mm dia.
57Clearing of diposited iron inside of laid CI/DI pipe line of different dia (150 mm/100 mm / 125 mm) and dismantling including trenching, refilling for every 100.00 mtr laid pipe line of required widht and depth, cutting for every 100.00 mtr pipe iron throug PVC coil pipe after clearing washing and laying the same with rubber gusket pipe layed joint as per direction of the Engineer-in-charge. (Pig lead will be issued by the department at free of cost but rubber gusket and other T&P will be arranged by the agency)
58Providing and laying of flexible PVC pipe (conforming to IS:7634) complete as per specification and direction of the Engineer - in - charge (cost of earth work and fittings will be paid separately)
59Charges for push-on ( Tyton ) joints to centrifugually ( Spun ) cast iron pipes or ductile iron pipes including testing of joints and including the cost of rubber gasket as per CPWD specification and direction of the Engineer - in - charge.
60i. 100 mm dia
61ii. 125 mm dia
62iii. 150 mm dia

AI Tender Summary

OUR REF NO 33314775
AUTHORITY Government Departments
TENDER VALUE 16.60 Lakhs
LAST DATE 17-08-2022
Authority
Authority Name Public Works Department
Work Description Extension And Remodeling Of Pipe Line And Other Allied Works At Different Dtw Schemes Under Dws Sub-Division, Sabroom During The Year 2022-23 (Gr-I).
Basic Detail
Tender No 46/DNIeT/EE/DWS/BLN/2022-23
Bidding Type Tender
Location
City belonia
State Tripura
Key Dates
Publish Date 29 Jul 2022
Submission Date 17 Aug 2022
Open Date 17 Aug 2022
Finance
Tender Value 16.60 Lakhs
Tender Fee 1000
EMD 33210
Exemption Not Available
Document List
82b93ff2-e1c4-4ad9-8c17-cb3495e5ce27.html
Annexure.pdf
BOQ_31028.xls
DNIT-46-Retrifitting-SBM-.pdf
Tendernotice_1.pdf
Tripura-PWD-Form-7.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 29, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 17, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 17, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

82b93ff2-e1c4-4ad9-8c17-cb3495e5ce27.html

pdf

Annexure.pdf

xls

BOQ_31028.xls

pdf

DNIT-46-Retrifitting-SBM-.pdf

pdf

Tendernotice_1.pdf

pdf

Tripura-PWD-Form-7.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders