1.Providing Cement concrete Pavement at Mahaliamman kovil streetPasuvamoopanvalasu H/O Pothiyapalayam 2)Providing Cement concrete Pavement at East-West 1st cross Street Pothiyapalayam H/O Pothiyapalayam 3)Construction of Agri godown building at Thalin
Tender Overview
Project Description
1.Providing Cement concrete Pavement at Mahaliamman kovil streetPasuvamoopanvalasu H/O Pothiyapalayam 2)Providing Cement concrete Pavement at East-West 1st cross Street Pothiyapalayam H/O Pothiyapalayam 3)Construction of Agri godown building at Thalinjikatupudhur H/O Pothiyaplayam 4)Construction of Agri godown building at Pasuvamoopanvalasu H/O Pothiyaplayam 5)Construction of Girls toilet at Govt high school Periya illiam H/O Pothiyaplayam AGAMT II 2021-2022
BOQ
| Sl. No. | Item Description |
| 1 | 1.Providing Cement concrete Pavement at Mahaliamman kovil streetPasuvamoopanvalasu H/O Pothiyapalayam |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 4 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 5 | Supplying and erecting centeringshuttering includingnecessary supportsforplane including conveyance of all materials to site and proper centering etc complete. |
| 6 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 7 | Provision for Bitumen Pad |
| 8 | Provision for Name board. |
| 9 | 2)Providing Cement concrete Pavement at East-West 1st cross Street Pothiyapalayam H/O Pothiyapalayam |
| 10 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 11 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 12 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 13 | Supplying and erecting centeringshuttering includingnecessary supportsforplane including conveyance of all materials to site and proper centering etc complete. |
| 14 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 15 | Provision for Bitumen Pad |
| 16 | Provision for Name board. |
| 17 | 3)Construction of Agri godown building at Thalinjikatupudhur H/O Pothiyaplayam |
| 18 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.. |
| 19 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 20 | Re Filling with excavated earth as per standard specification etc complete |
| 21 | Fly ash Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. |
| 22 | For foundation and Basement Super structure |
| 23 | Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete. |
| 24 | Below GL |
| 25 | rate for column post |
| 26 | rate for Sunshade |
| 27 | rate for roof slab,lintel,beam |
| 28 | Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod includingcost and conveyance of all materials to site all labour charges etc complete. |
| 29 | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. |
| 30 | Plastering with cement 1:3-10mm thick includingcost and conveyance of al materials to site and all labour charges etc complete. |
| 31 | Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to site and all labour charges etc complete. |
| 32 | Weathering course using 20mm brick jelly with slacked lime in the ratio watered and of 32:12.5including cost and conveyance of all materials to site and alllabour chargesfor mixing , laying ,and finishing etc complete complying with standard specifications etc. |
| 33 | Finishing with one course of pressed tiles of size 20x20x2cm with cement including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete complying with standard specifications etc. |
| 34 | Providing Granolithic floor finish CC 1:2:4 mix to 25mm thick inculding cost and conveyance of all material to site and all labour charges |
| 35 | Distempering two coats using OLD or NEW Plastered surface using Oil Bound Distemperincluding cost and all Labour charges etc., complete for 10 sqm |
| 36 | Painting the walls and ceiling two coats with approved emulsion paint over one coat of priming coat of emulsion including cost and conveyance of all materials to site, through scrapping of old plastered surface, preparing the surface, curing etc., complete with standard specification and as directed by the departmental officers. |
| 37 | Painting two coatsover new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specification |
| 38 | Supply and fabrication of steel Rolling shutter including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 39 | Supply and fabrication of steel N type ventilators including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 40 | Provision for painting name board |
| 41 | 4)Construction of Agri godown building at Pasuvamoopanvalasu H/O Pothiyaplayam |
| 42 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.. |
| 43 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 44 | Re Filling with excavated earth as per standard specification etc complete |
| 45 | Fly ash Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. |
| 46 | For foundation and Basement Super structure |
| 47 | Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete. |
| 48 | Below GL |
| 49 | rate for column post |
| 50 | rate for Sunshade |
| 51 | rate for roof slab,lintel,beam |
| 52 | Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod includingcost and conveyance of all materials to site all labour charges etc complete. |
| 53 | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. |
| 54 | Plastering with cement 1:3-10mm thick includingcost and conveyance of al materials to site and all labour charges etc complete. |
| 55 | Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to site and all labour charges etc complete. |
| 56 | Weathering course using 20mm brick jelly with slacked lime in the ratio watered and of 32:12.5including cost and conveyance of all materials to site and alllabour chargesfor mixing , laying ,and finishing etc complete complying with standard specifications etc. |
| 57 | Finishing with one course of pressed tiles of size 20x20x2cm with cement including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete complying with standard specifications etc. |
| 58 | Providing Granolithic floor finish CC 1:2:4 mix to 25mm thick inculding cost and conveyance of all material to site and all labour charges |
| 59 | Distempering two coats using OLD or NEW Plastered surface using Oil Bound Distemperincluding cost and all Labour charges etc., complete for 10 sqm |
| 60 | Painting the walls and ceiling two coats with approved emulsion paint over one coat of priming coat of emulsion including cost and conveyance of all materials to site, through scrapping of old plastered surface, preparing the surface, curing etc., complete with standard specification and as directed by the departmental officers. |
| 61 | Painting two coatsover new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specification |
| 62 | Supply and fabrication of steel Rolling shutter including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 63 | Supply and fabrication of steel N type ventilators including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 64 | Provision for painting name board |
| 65 | 5)Construction of Girls toiletat Govt high school Periya illiam H/O Pothiyaplayam |
| 66 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.. |
| 67 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 68 | RR masonry in CM 1:5 mix including cost and conveyance of all materials to site and all labour charges etc complete. |
| 69 | Supply an Fillin sand from appd quarry including cost and conveyance and all labour charges etc complete as per standard specification. |
| 70 | Re Filling with excavated earth as per standard specification etc complete |
| 71 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. |
| 72 | For foundation and Basement Superstructure |
| 73 | Honey comb Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. |
| 74 | For foundation and Basement Superstructure |
| 75 | Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete. |
| 76 | rate for roof slab,lintel,beam |
| 77 | Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod includingcost and conveyance of all materials to site all labour charges etc complete. |
| 78 | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. |
| 79 | Plastering with cement 1:3-10mm thick includingcost and conveyance of al materials to site and all labour charges etc complete. |
| 80 | Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to site and all labour charges etc complete. |
| 81 | Granolitnic floor finish CC 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. |
| 82 | Paving the floor with scratch proof ceromic tiles of size 305x305x6mm inculding cost and conveyance of all material to site and all labour charges |
| 83 | Dadooing with Glazes tiles of 200mmx300mm includingcost and conveyance of all materials to site and all labour charges etc complete |
| 84 | Distempering two coats using OLD or NEW Plastered surface using Oil Bound Distemperincluding cost and all Labour charges etc., complete for 10 sqm |
| 85 | Painting the walls and ceiling two coats with approved emulsion paint over one coat of priming coat of emulsion including cost and conveyance of all materials to site, through scrapping of old plastered surface, preparing the surface, curing etc., complete with standard specification and as directed by the departmental officers. |
| 86 | Painting two coatsover new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specification |
| 87 | Supply and Fixing of Galvalume sheet roof including J bolt washer etc |
| 88 | Supply and fixing MS steel Angles including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 89 | Cost & Supply For W.C including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 90 | Supply and Fixing EWC in physically challenged person toilet including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 91 | Cost & Supply 500 litre HDPE tank including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 92 | Cost & Supply wash basinincluding cost and conveyance ofall materials to work site and labor charges etc complete. |
| 93 | Cost & Supply mirroe PVC/ fibre glass framedincluding cost and conveyance ofall materials to work site and labor charges etc complete. |
| 94 | Cost & Supply Door size 0.75x1.80m including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 95 | Cost & SupplyRCC jolly0.6x0.30m including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 96 | Cost & Supply leach pit cover slab including cost and conveyance ofall materials to work site and labor charges etc complete. |
| 97 | Provision for painting name board |
| 98 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender