Regarding Running Contract Of Repairing And Strengthening Of 33 Kv, 11Kv, And Lt Lines Pole Damaged Due To Heavy Strom ( Daviya Aapda ) In The Area Of Edsd-I Parikshitgarh And Edsd-Ii Hastinapur Under Edd-Ii Mawana Under Edc-2 Meerut
Tender Overview
Project Description
Regarding Running Contract Of Repairing And Strengthening Of 33 Kv, 11Kv, And Lt Lines Pole Damaged Due To Heavy Strom ( Daviya Aapda ) In The Area Of Edsd-I Parikshitgarh And Edsd-Ii Hastinapur Under Edd-Ii Mawana Under Edc-2 Meerut
BOQ
| Sl. No. | Item Description |
| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 50 Km. :– |
| 2 | A) P.C.C. Pole 8.5 Mtr. Long. |
| 3 | (B) Round Pole/ST Pole 11 mtr. Long. |
| 4 | (C) Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 5 | Cartage of the following material from store J.E. to site of work including loading & unloading at both ends (maximum distance up to 10 km.) :–A) PCC pole 8.5 mtr long. |
| 6 | (B) Round Pole/ST Pole 11 mtr. Long. |
| 7 | (C) Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 8 | Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.) :- (A) 250 KVA |
| 9 | (B) 63 KVA to 100 KVA |
| 10 | (C) 10 KVA to 25 KVA |
| 11 | Safe cartage of Transformer from from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 50 km.) :- (A) 250 KVA |
| 12 | (B) 63 KVA to 100 KVA |
| 13 | (C) 10 KVA to 25 KVA |
| 14 | Erection of Round Pole/P.C.C. Pole 8.5 Mtr. Long including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. :-(A) PCC Pole |
| 15 | (B) Round Pole/ST Pole 11 mtr. Long. |
| 16 | Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms :-(A) Rabbit Conductor. |
| 17 | (B) Weasel Conductor. |
| 18 | Erection fixing & grouting of stay rod size 16X1800mm after digging the pit of size 0.60X0.30X0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. |
| 19 | Earthing of PCC support with MS Earth rod of 2.5 Mtr. Long including excavation of pit & driving of MS rod up to proper depth & connection the earth electrode with the help of GI wire. |
| 20 | Straightening of tilled PCC Pole of 11 KV/LT Lines after opening the bindings from insulators and digging the pit for require depth and refilling the same pit after completion of work including rebinding the conductor with insulators & sagging the conductor. |
| 21 | Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect :-(A) LT Pin Clamps with nut & bolt. |
| 22 | (B) Shackle Insulator with nut & bolt. |
| 23 | (C) Double Pole Clamps with nut & bolt. |
| 24 | Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect. |
| 25 | Providing & fixing of Stay insulator in stay wire as per site requirement. |
| 26 | Mounting of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line :-(A) 63 KVA to 100 KVA |
| 27 | (B) 10 KVA to 25 KVA |
| 28 | Dismantling of PCC pole of existing line after opening all fittings and digging the pit of required size. |
| 29 | Cutting & Chopping of tree branches. |
| 30 | Dismantling of Damaged/Rusted STP/Rail pole of existing line after opening all fittings and digging the pit of required size. |
| 31 | Providing D-Type loop on each face & neutral. |
| 32 | Providing & fixing of bamboo sticks of required size on LT Line as per instructions of JE concerned. |
| 33 | Jumpering of 11 KV/LT Line at different places/T points. |
| 34 | Dismantling of D.P. including the work of dismanling of all accessories and connected HT/LT Line connections. |
| 35 | Removal of damaged/burnt conductor/GI wire after opening the bindings & making the role etc :-(A) Rabbit Conductor |
| 36 | (B) Weasel Conductor. |
| 37 | Replacement/Repairing of LT PVC Cable of existing T/F.: -(A) 63 KVA to 100 KVA |
| 38 | Water level Earthing (Neutral/Body) by providing & fixing 30 mtrs 30 mm dia GI Pipe with MS Strip 40x6 mm. lowering the same after boring of earth by 4\" dia upto 30 mtr depth/water level. |
| 39 | Cartage of Dismantled and removal material from site to J.E store including loading & unloading at both ends maximum distance about upto15 Km. |
| 40 | Cartage of Dismantled and removal material from J.E store to Central Store Meerut including loading & unloading at both ends maximum distance about upto15 Km. |
| 41 | Cartage of old/damaged T/F. from work site to JE Store including loading & unloading at both ends. :- (A) 63 KVA to 100 KVA |
| 42 | Cartage of old/damaged T/F. from JE Store to Central Store Meerut including loading & unloading at both ends. :-(A) 63 KVA to 100 KVA |
| 43 | Cartage of dismantled PCC Pole/STP from work site to JE Store (Distance up to 15 KM) including Loading & Unloading at both ends.:-(A) STP Pole |
| 44 | Dismantling of exsisting HT/LT Line by opening the binding at required place and rebinding the wire/conductor etc. as per site requirement to complete the work. |
| 45 | Making new Plinth for 250/400 KVA T/F. for installation new T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender