Regarding Repairing And Construction Work Of Old And New Line Under Full Deposit Work Scheme / Sansad / Vidhayak Nidhi And By Getting Application Through Jhatpat Portal In The Area Of Edsd-I, Parikshitgarh And Edsd-Ii, Hastinapur Under Edd-Ii, Mawana
Tender Overview
Project Description
Regarding Repairing And Construction Work Of Old And New Line Under Full Deposit Work Scheme / Sansad / Vidhayak Nidhi And By Getting Application Through Jhatpat Portal In The Area Of Edsd-I, Parikshitgarh And Edsd-Ii, Hastinapur Under Edd-Ii, Mawana U
BOQ
| Sl. No. | Item Description |
| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– |
| 2 | A) P.C.C. Pole 8.5 Mtr. Long. |
| 3 | B) Round Pole/ST Pole 11 mtr. Long. |
| 4 | C) Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 5 | Cartage of the following material from store J.E. to site of work including loading & unloading at both ends (maximum distance up to 10 km.)A) P.C.C. Pole 8.5 Mtr. Long. |
| 6 | B) Round Pole/ST Pole 11 mtr. Long. |
| 7 | C) Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 8 | Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.) :-A) 250 KVA |
| 9 | B) 63 KVA to 100 KVA |
| 10 | C) 10 KVA to 25 KVA |
| 11 | Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 15 km.) :-A) 250 KVA |
| 12 | B) 63 KVA to 100 KVA |
| 13 | C) 10 KVA to 25 KVA |
| 14 | Erection of Round Pole/P.C.C. Pole 8.5 Mtr. Long including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. As follows :-A) PCC Pole |
| 15 | B) Round Pole/ST Pole 11 mtr. Long. |
| 16 | Erection of D/P on PCC/Round Poles after digging of pits of size 1.20X0.75X1.75 Mtrs including fabrication of Structure as per RESPO norms. |
| 17 | Earthing of PCC support with MS Earth rod of 2.5 Mtr. Long including excavation of pit & driving of MS rod up to proper depth & connection the earth electrode with the help of GI wire. |
| 18 | Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms. As follows :-A) Rabbit Conductor. |
| 19 | B) Weasel Conductor. |
| 20 | Erection fixing & grouting of stay rod size 16X1800mm after digging the pit of size 0.60X0.30X0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. |
| 21 | Straightening of tilled PCC Pole of 11 KV/LT Lines after opening the bindings from insulators and digging the pit for require depth and refilling the same pit after completion of work including rebinding the conductor with insulators & sagging the conductor. |
| 22 | Mounting of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line.As follows :-A) 63 KVA to 100 KVA |
| 23 | B) 10 KVA to 25 KVA |
| 24 | Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect :- A) LT Pin Clamps with nut & bolt. |
| 25 | B) Shackle Insulator with nut & bolt. |
| 26 | C) Double Pole Clamps with nut & bolt. |
| 27 | Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect. |
| 28 | Providing & fixing of Stay insulator in stay wire as per site requirement. |
| 29 | Fabrication of cross arm from given MS channel for making T/Section of HT Line. |
| 30 | Dismantling of PCC pole of existing line after opening all fittings and digging the pit of required size. |
| 31 | Providing & Fixing of F-Clamp for PCC Pole/STP made of MS flat of size 50X6mm with nut & bolt. |
| 32 | Providing & fixing of cross arm holding clamp for PCC Pole/STP made MS flat of size 50X6mm with nut & bolt. |
| 33 | Dismantling of Damaged/Rusted STP/Rail pole of existing line after opening all fittings and digging the pit of required size. |
| 34 | Providing D-Type loop on each face & neutral. |
| 35 | Providing & fixing of bamboo sticks of required size on LT Line as per instructions of JE concerned. |
| 36 | Making section T-off for 11 KV/LT Line. |
| 37 | Refixing of old stay after digging of pole of regard size & then grouting of stay on site required. |
| 38 | Cutting & Chopping of tree branches. |
| 39 | Jumpering of 11 KV/LT Line at different places/T points. |
| 40 | Fixing of meter cuebicale & making connection & other related works. |
| 41 | Guarding of 11 KV Line as per norms. |
| 42 | Removal of damaged/burnt conductor/GI wire after opening the bindings & making the role etc. As Follows :-A) Rabbit Conductor |
| 43 | B) Weasel Conductor. |
| 44 | Resagging of Loose 11 KV Line/LT Line after opening the binding than stringing the conductor & rebinding the same properly. As follows :-A) Rabbit Conductor. |
| 45 | B) Weasel Conductor. |
| 46 | Dismantling of D.P. including the work of dismanling of all accessories and connected HT/LT Line connections. |
| 47 | Errection of section by PCC Pole after digging a pit of size 1.20x0.75x1.75 mt |
| 48 | Repair/Replacement of damaged burnt Jumpers of double pole/section pole of 11 KV/LT Line. |
| 49 | Cartage of ABC Cable with junction Box & other store materials related with the work of ABC for each site/Transformer. |
| 50 | Laying Lifting of ABC Cable complete in all respect as per instruction of J.E./SDO. |
| 51 | Fixing of Junction Box & making connection & other related works. |
| 52 | Fixing of TPMO at D/P. |
| 53 | Fixing of Fuse Set at D/P. |
| 54 | Replacement/Repairing of LT PVC Cable of existing T/F.: 63 KVA to 100 KVA |
| 55 | Water level Earthing (Neutral/Body) by providing & fixing 30 mtrs 30 mm dia GI Pipe with MS Strip 40x6 mm. lowering the same after boring of earth by 4\" dia upto 30 mtr depth/water level. |
| 56 | Cartage of Dismantled and removal material from site to J.E store including loading & unloading at both ends maximum distance about upto15 Km. |
| 57 | Cartage of Dismantled and removal material from J.E store to Central Store Meerut including loading & unloading at both ends maximum distance about upto15 Km. |
| 58 | Cartage of old/damaged T/F. from work site to JE Store including loading & unloading at both ends. As follows :-A) 63 KVA to 100 KVA |
| 59 | Cartage of old/damaged T/F. from JE Store to Central Store Meerut including loading & unloading at both ends. As follows :-A) 63 KVA to 100 KVA |
| 60 | Cartage of dismantled PCC Pole/STP from work site to JE Store (Distance up to 15 KM) including Loading & Unloading at both ends. As follows :-A) PCC Pole |
| 61 | Cartage of dismantled PCC Pole/STP from JE Store to Central Store Meerut.(Distance up to 50 KM) including Loading & Unloading at both ends. As follows :_A) PCC Pole |
| 62 | Removal of old/damaged T/F from exsisting D.P. after Opening the LT/HT side connections due to increasing capacity or due to any other reason. As follows :-A) 63 KVA to 100 KVA |
| 63 | Dismantling of exsisting HT/LT Line by opening the binding at required place and rebinding the wire/conductor etc. as per site requirement to complete the work. |
| 64 | Making new Plinth for 250/400 KVA T/F. for installation new T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). |
| 65 | Wiremess Fancing of 250/400 KVA T/f. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.