| 1 | Labour for cleaning the work site before and after work etc. |
| 2 | Providing man days for site clearence before and after the work etc. |
| 3 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts,levelling,ramming the foundation trenches,removing roots of trees,shrubs all complete as per approved design,building specification and direction of E/I+Extra for earthworkin hard soil as per specification and direction of E/I.(vide classification of soil item-B) |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth includingramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials , labour , royalty and taxes all complete as per specification anddirection of E/I. ( Mode of measurement compacted volume. ) |
| 5 | Supplying and laying (properly as per design and drawing )rip-rap with good quality of boulders duly packed including the cost of materials,royalty all taxes etc.but excluding the cost of carriage, all complete as per specification and direction of E/I. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of excluding cost of centring,shuttring-All work up to plinth level;1:1.5:3(1cement:1.5 coarse sand(zone-lll):3 grade stone agreegate 20mm nominal size)..........do…..all complete as per specification and direction of E/I. |
| 7 | Reinfoced cement concrete work in wall(any thickness),including attached pilasters buttressed,plinth and string course,fillets,columns,pillers,piers,abutments,post and struts etc. above plinth level up to floor five level,excluding cost of centring,shuttring,finishing and reinforcements:1:1.5:3(1cement:1.5 coarse sand(zone-lll):3 grade stone agreegate 20mm nominal size)..........do…..all complete as per specification and direction of E/I. |
| 8 | Reinfoced cement concrete work in beam,suspanded floor,roof having slope up to 15olandings,balconies,shelves,chajja,lintels,bands plain window sills,staircases and sprial stair cases above plinth level up to floor five level,excluding cost of centring,shuttring,finishing and reinforcements:1:1.5:3(1cement:1.5 coarse sand(zone-lll):3 grade stone agreegate 20mm nominal size)..........do…..all complete as per specification and direction of E/I. |
| 9 | Providing Tor steel reinforcement of 10mm dia bars as per approved design and drawing -----do-----do----- |
| 10 | Providing Tor steel reinforcement of 8mmdia bars as per approved design and drawing -----do-----do----- |
| 11 | Centring and shuttring including strutting,propping etc. and removal of from forFoundation, footings,bases of column,etc for mass concrete |
| 12 | Providing and applying TACK COAT with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. |
| 13 | Providing and layingBITUMINOUS MACADAMwith 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laiying with a hydrostatic paver finisher with the sensor control to therequired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to acheive the desired compaction as per MoRTH specification clause No.507 complete in all respects. |
| 14 | (Providing and laying BITUMINOUS CONCRETE with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to desired compaction as per MoRTH specification clause No. 509 complete in all respects. |
| 15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including glass beads @ 250gms. Per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to level,uniform and free from streaks and holes.(A sealing primer may be applied in advance in cement concrete pavement to ensure proper bonding.Any laitance and / or curing compound to be removed where paint is required to be applied on concrete surface. |
| 16 | Sand (Lead 49 KM) |
| 17 | Sand local (Lead 14 KM) |
| 18 | Stone Chips(Lead 22 KM) |
| 19 | Stone boulder(Lead 36 KM) |
| 20 | Earth (Lead 01 KM) |
| 21 | Good & Service Tax (GST) |
| 22 | Labour Cess |