Power Boards / Undertakings / PSU Closing in 0 days TDR #33292883

Erection Work Of 01 No. 132 Kv Feeder Bay For 2Nd Circuit Of Handia-Satwas Line At 132 Kv Substation Satwas Under Testing Division Ashta

Issued by Boards / Undertakings / PSU · satwas, Madhya Pradesh
Tender Value
3.32 Lakhs
Estimated cost
Bid Submission
25 Aug 2022
0 days left
EMD
6650
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
satwas → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Erection Work Of 01 No. 132 Kv Feeder Bay For 2Nd Circuit Of Handia-Satwas Line At 132 Kv Substation Satwas Under Testing Division Ashta

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 18-Aug-2022 Date Extension Date 25-Aug-2022

BOQ

Name of Work:ERECTION WORK OF 01 No. 132 KV FEEDER BAY FOR 2nd CIRCUIT OF HANDIA-SATWAS LINE AT 132 KV SUBSTATION SATWAS UNDER TESTING DIVISION ASHTA
Sl. No. Item Description
1ERACTION, TESTING & COMMISSIONING ETC
2ERECTION OF STRUCTURE - (IN MT)-Erectionofstructuresincludingfixing&alignmentof templates for grouted / bolted type structure foundations, tighteningofnuts&boltswashers etc & including alignment & leveling of structure.
3ERECTION OF 132KV CB- Erection on structures and alignment, shifting of breaker upto the place and placement of all 3 circuit breaker poles on structure and alignment. Complete assembly of circuit breaker including erection of control cabinet & mechanism box, interconnecting piping work, erection of all accessories for the equipment.
4ERECTION OF 132 KV CT-Shifting on current X’mer upto civil foundation and placement on structure and fixing of junction box including all accessoriesetc.
5ERECTION OF 132 KV ISOLATOR with Earth switch(3 Phase) - Shifting upto civil foundation & Placement of complete isolator in all 3 phases of 132 KV Isolator structure including shifting within s/s premises. Erection / Mounting of mechanism box, interconnection, piping alignment of contacts & all associated activities with P. I.
6ERECTION OF 132 KV ISOLATOR without Earth switch(3 Phase) - Shifting upto civil foundation & Placement of complete isolator in all 3 phases of 132 KV Isolator structure including shifting within s/s premises. Erection / Mounting of mechanism box, interconnection, piping alignment of contacts & all associated activities with P. I.
7ERECTION OF 132 KV LA-Shifting & placement of 132 KVLA\"s on structure including all accessories, making all interconnections checking & installation of insulator base and surge counters.
8ERECTION OF 132 KV C & R PANEL-Unloading /Shifting up to control room (including storage if required) and placement complete with all relays & accessories.The placement of C&R panel to be done on MS channel frame and MS Channel frame will suitable grouted in control room as per drawing.The cutting,welding & fabrication of of MS channel frame is to be done as per drawing.Proper alignment of C&R panel to be done.The earthing of C&R Panel to be done.Making of all interconnections for the control & relay panel on terminal block as per drawing including all AC & DC connections.
9Erection of Solid Core Insulator with PI Structure
10Installationof Junction Box
11Installation of Lighting fixtureInstallation of light fixtures on gantry column, supply connection to the light fitting from the nearest lighting board in the yard etc.
12CABLE LAYING-Laying of copper cables (armoured/unarmoured) on racks/cable trays/ angle support overhead racks conduits including dressing of cables with accessories for copper conductor & armoured control cables.
132 Core 2.5 Sq mm Unarmoured
144 Core 2.5 Sq mm Unarmoured
1519 Core 2.5 Sq mm Unarmoured
16CABLE TERMINATION-cable termination including providing of holes for cable entry, fixing of glands, dressing of cable leads, fixing of lugs etc for each type of control cable including termination at both ends.
172 Core 2.5 Sq mm Unarmoured
184 Core 2.5 Sq mm Unarmoured
1919 Core 2.5 Sq mm Unarmoured
20M S FLATE LAYINGLaying of MS flatduly buried at a depth of 0.5 mtrs provinding of risers for structures earthing including back filling, welding etc structure earthing of following length
21MS Flat for Earthing (65X8)
22MS Flat for Earthing (50X6)
23INSTALLATION OF EARTHINGInstallation of 25mm dia, 3000 mm long MS rod with electrodes by directly driving/drilling (6\"\" Dia) to in dril including excavation (if rspective of type of solid incounterd), back filling with bentolle soil, welding to etc.
24PREPARATION OF EARTH PIT Preparation of earthing pits (1.5 m*1.5m*3m) as per boards drawing nosXII-B-774 with include excavation of the soil encountered ambedding of 4 nos GI pipes of size 40*3mtr. Long back filling with Black soil.
25STRINGING & JUMPERING
26Twin Zebra Conductor
27Single Zebra Conductor
28Overhead Earth Wire
29DISMENTLING
30Dismentling of 132 KV PI/Solid Core Insulator
31Dismentling of Structure 220/132/33 KV gantries, Busbar, equipment, Equipment structure 132 KV PI/Solid Core Insulator

AI Tender Summary

OUR REF NO 33292883
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 3.32 Lakhs
LAST DATE 25-08-2022
Authority
Authority Name Madhya Pradesh Power Transmission Company Limited
Work Description Erection Work Of 01 No. 132 Kv Feeder Bay For 2Nd Circuit Of Handia-Satwas Line At 132 Kv Substation Satwas Under Testing Division Ashta
Basic Detail
Tender No TS-05/2022-23
Bidding Type Tender
Location
City satwas
State Madhya Pradesh
Key Dates
Publish Date 18 Aug 2022
Submission Date 25 Aug 2022
Open Date 26 Aug 2022
Finance
Tender Value 3.32 Lakhs
Tender Fee 590
EMD 6650
Exemption Not Available
Document List
82f3a163-0bc2-4f7b-8397-779eb2dfc3ab.html
BOQ_251039.xls
Tendernotice_1.pdf
Tendernotice_2.pdf
Tendernotice_3.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 18, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 25, 2022
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 25, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 26, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

82f3a163-0bc2-4f7b-8397-779eb2dfc3ab.html

xls

BOQ_251039.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders