| 1 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge : 15 mm to 40 mm nominal bore. |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 3 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 4 | 15mm Cement plaster on the rough side of single or half brick wall of mix:1 : 6 ( 1 cement : 6 fine sand) |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 7 | Suspended floors, roofs, landings, balconies and access platforms |
| 8 | Slab |
| 9 | Edges of slabs and breaks in floors and walls |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 11 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 12 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer Using M.S. angles 40x40x6mm for diagonal braces |
| 13 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) |
| 14 | 50mm dia |
| 15 | 40mm dia |
| 16 | 25mm dia |
| 17 | 20mm dia |
| 18 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 19 | Carriage of material by mechnical transport from source to road site |
| 20 | Sand/Stone aggregate 20mm 30km |
| 21 | Cement and steel 20km |
| 22 | Bricks 110km |
| 23 | Pipes for 110kms |
| 24 | Carriage of manual labour an avg H/Load 250mtr |
| 25 | Sand/Stone aggregate 20mm |
| 26 | Cement |
| 27 | Steel |
| 28 | Bricks |
| 29 | Pipes |