Breakdown Maintenance Of Ball Mill Of Unit No 4 And 5, 2X500 Mw, Btps, Anpara, anpara-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Breakdown Maintenance Of Ball Mill Of Unit No 4 And 5, 2X500 Mw, Btps, Anpara. Submission Date for this Tender is 29-08-2022. Crushers Breakers and Grinders Tenders in anpara Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

33269166
Breakdown Maintenance Of Ball Mill Of Unit No 4 And 5, 2X500 Mw, Btps, Anpara
Open Tender
Indian
Uttar Pradesh
anpara
29-08-2022

Tender Details

Breakdown Maintenance Of Ball Mill Of Unit No 4 And 5, 2X500 Mw, Btps, Anpara

Key Value

Document Fees
INR 590 /-
EMD
INR 37000.0 /-
Tender Value
INR 24.32 Lakhs /-

BOQ Items

Name of Work: BREAKDOWN MAINTENANCE OF BALL MILL OF UNIT NO. 4 & 5, 2X500 MW, ‘B’TPS, ANPARA
Sl. No. Item Description
1Opening & closing of Man hole of
2a)      Conveyor tube
3b)      Hot air box
4c)      P.C. Chute
5d)      Primary hot air duct
6e)      Mill Drum
7f)       Manual hot air duct
8Separation of steel balls from coal dust coming out due to emptying out of Mill
9Replacement of liners bolt located inside the mill drum.
10Repair / Replacement of
11(a) Screen Plate
12(b) Classifier Plate /Deflector Plate
13Replacement of liner plate of ball mill drum and shifting of eroded liner plate to division site.
14(a) Straight wave cylindrical liner.
15(b) Oblique wave cylindrical liner.
16(c) Conical liner ( Long & short)
17(d) Inlet side liner/ boss liner (Inlet side liner with boss/ without boss)
18Checking & cleaning of Girth Gear & Pinion Gear Teeth by Oil, Inside, Cleaning of its enclosure and its checking of back lash including its associated works.
19Checking of the alignment of
20a) Pinion & Main Reducer Shaft/ Coupling
21b) Main Reducer & Main Mill Motor Shaft/Coupling.
22c) Main Mill Motor & Aux. Reducer Shaft/Coupling.
23d) Aux. Reducer & Inching Motor Shaft/ Coupling.
24Placement of displaced chuck nut of
25I.      Pinion Bearing
26II.      Pinion Gear
27Replacement of damaged chuck nut
28(a) Pinion shaft Bearing DE Side
29(b) Pinion shaft Bearing NDE Side
30(c) Pinion Gear
31Tightening of nuts & bolts of liner plates located inside the ball mill drum.
32Checking of trunion and oil deflector and rectification of defect if any by opening top cover of main bearing and adjustment of oil deflector.
33Replacement of roller bearings of pinion shaft.
34(a) NDE side
35(b) DE side
36Checking of both bearings of pinion shaft and their grease replacement.
37Replacement of bearings/ seals /covers etc. of low/high speed shafts of main / auxiliary reducer.
38Alignment between the shafts of
39(a) Pinion & main reducer.
40(b) Main reducer & main motor.
41(c) Main motor & auxiliary reducer.
42(d) Auxiliary reducer & inching motor.
43Replacement of screw conveyors.
44(a) Tie Rod
45(b) Out Board Bearing
46(c) Screw Conveyor Assembly
47(d) Alignment of screw conveyor out board bearing.
48Welding/ repairing of screw conveyor at site.
49(a) Tie Rod
50(b) Hooks & Chain Links
51(c) Helix/Ribbon
52Welding of patch on Mixing box/ coal air inlet pipe/ hot air box/ purge air pipe etc.
53(a) 100 mm X 100 mm (up to and below 100 mm X 100 mm)
54(b) 200 mm X 200 mm (upto & below but more than 100 mm X 100 mm)
55(c) 300 mm X 300 mm (upto & below but more than 200 mm X 200 mm)
56Repairing of Cement Lining inside classifier, P.C. Chute & Trunion tube
57Replacement of packing of Seal Air Box and Trunion Collar.
58Removal of choking of
59(a) Classifier
60(b) Mixing Box
61(c) Ball charging System
62(d) Mill Seal Air Pipe and Seal Air Box.
63Welding of Patch on classifier cone (300 mm X 250 mm)
64Servicing of the classifier vane by complete dismantling of the assembly
65Preparation and installation of backing material with the help of EPDM rubber 5 mm, 3 mm and 1.5 mm asbestos sheet for the installation of high chrome liners
66(a) Cylindrical (Straight/Oblique wave) liners
67(b) Conical (long/short) liners
68(c) Inlet side (with/without) liners
69Checking of tightness of the foundation bolts.
70Removal of the Tie rod from Screw Conveyor assembly
71PART - B
72Work of replacement of removal shaft of screw conveyor of ball mill.
73The work of dismantling of flap and shaft of the inlet air damper, repairing of worn out flap body and shaft and re-assembly of repaired flap body and shaft at its proper position of the ball mill.
74The work of repairing of worn out flap body and shaft of bypass air damper and re-assembly of repaired flap body and shaft at its proper position of the ball mill.
75The work of fabrication & erection of platform and formation of manholes in side wall of hot air bypass air damper in milling system.
76The work of repairing of Removal shaft of Screw conveyor.
77Replacement of P.F. outlet and Purge air pipe of Ball Mills.
78PART - C
79Fabrication and installation of the mixing box with the help of 8/10/12 mm Sailma Steel Plate after removal of the old and worn out portion of the mixing box of the Ball Mill of 2X500MW, BTPS, Anpara
80Fabrication & installation of the reducer pipe installed in the centre pipe of the ball mill with the help of 8/10/12 mm Sailma Steel Plate after removal of the old and worn out reducer pipe of the Ball Mill of 2X500MW, BTPS, Anpara.
81Trunion Tube lining & liner works
82Fabrication of the bottom liner (Half cylindrical) with 8/10/12mm Sailma steel plate for (one side) of trunion tube of ball mill.
83The work of fabrication of the hot air tube lining with 8/10/12 mm Sailma steel plate (one side) of trunion tube of ball mill.
84The work for removal of worn out Bottom Liner (Half Cylindrical) and fitting of New / Fabricated BottomLiner(HalfCylindrical)intheTrunion tube of Ball Mill (one side).
85Theworkforremovaloftheoldandwornout Hot Air Tube Lining and fitting of new Hot Air Tube Lining (Approx.30-50%) in the trunion tube of Ball Mill (one side).
86Repairing works of the worn-out screw conveyor of ball mills.
87Reconditioning of collar of Mixing boxto restore its original condition to stop leakage of coal dust in the Ball Mill.
88PART - D
89Dismantling & Removal of existing Main/ Auxiliary Reducer Gear Box Assembly from Ball Mills.
90Installation & Assembly of Main/ Auxiliary Reducer Gear Box to the Ball Mills.
91Replacement of Couplings of Milling System.
92Coupling between Girth Gear Pinion & Main Reducer Gear Box Assembly (Low speed coupling) of Ball Mill.
93Coupling between Main Reducer Gear Box & Main Motor of Ball Mill.
94Coupling between Auxiliary Reducer Gear Box & Main Motor of Ball Mill.
95Coupling between Inching Motor & Auxiliary Reducer Gear Box of Ball Mill.
96PART - E
97Fixingof new helix ribbon onthe screw conveyor body of the ball mill after removing old eroded chain links, hooks, old ribbons etc.
98Servicing and break down works of the coal gates of the coal bunkers of ball mills.
99a.    Servicing of coal gates of the coal bunkers of the ball mills
100b.    Repairing of sprocket of the coal gate shafts of ball mills.
101c.    Repairing of the rack of the coal gate of the ball mill.
102Fabrication and installation of triangular portion of trunion tube of ball mill size 1800 mm x1000mmx1000mm.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail