Hindustan Copper Limited-HCL has published M16921 Annual Mechanical Maintenance Of Equipments Installed At Copper Beneficiation Plant Capacity 2.5 Mtpa And Water Pumps Installed At Tailing Dam And Water Treatment Plant-Installation Of Complete Hydro-Cyclone In Ball Mill Circuit, Replacement Of Si. Submission Date for this Tender is 17-08-2022. Crushers Breakers and Grinders Tenders in malanjkhand Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Installation of complete hydro-cyclone in Ball Mill Circuit |
2 | Replacement of silicone insert of hydro-cyclone |
3 | Replacement of lower cone/ middle cone of hydro-cyclone |
4 | Replacement of conveyor belt of weigh feeder |
5 | Replacement of tail pulley/ head pulley of weigh feeder |
6 | Adjustment of side scrapper/ lower scrapper of weigh feeder |
7 | Replacement of gear motor of weigh feeder |
8 | Replacement of Mill Feed conveyor"s head pulley/ tail pulley/ bend pulley |
9 | Replacement of Mill feed conveyor"s gear box |
10 | Repair of cantilever pump 120 hp 1450 RPM |
11 | Repair of cantilever pump 35 hp 1450 RPM |
12 | Replacement of cantilever pump of capacity 120 hp 1450 RPM- Impeller/ shaft |
13 | Replacement of cantilever pump of capacity 35 hp 1450 RPM- Impeller/ shaft |
14 | Replacement of Ball Mill"s feed sleeve/ Discharge sleeve |
15 | Replacement of Ball Mill"s Centre Ring/ Discharge Ring |
16 | Repair and replacement of ball mill"s lub pump |
17 | Replacement of ball mill"s gear box input shaft pinion |
18 | Replacement of Ball Mill"s feed pipe |
19 | Replacement of Trommel screen |
20 | Plumber block greasing of ball mill"s integral pinion |
21 | Replacement of adopter bolt between sleeve and ball mill head |
22 | Repair of ball mill"s feed pipe |
23 | Repair of Trommel Screen |
24 | Replacement of bearing of Integral Pinion / Bull gear |
25 | Replacement of complete Froth Pump |
26 | Repair of bearing housing of froth pump |
27 | Replacement of casing liner |
28 | Repair of Industrial Process water pump 200/150 hp capacity 400 m3 per hr |
29 | Repair of drinking water pump 60/50 hp capacity 80 m3 per hr/ Raw water pump 40 hp capacity 300 m3 per hr |
30 | Repair and replacement of clarriflocator"s froth paddle |
31 | Replacement of end wheel of clarriflocator |
32 | Replacement of clarriflocator"s central bearing |
33 | Replacement of bearings of Twin lobe Blower |
34 | Replacement of geared wheel of Twin lobe blower |
35 | Inspection and cleaning of suction silencer/ discharge silencer of Root Blower |
36 | Replacement of drive shaft/ bearing of Root Blower |
37 | Repair and replacement of centrifugal fan blower"s drive shaft |
38 | Replacement of Grab Crane"s Bucket rope |
39 | Repair of Grab Crane Bucket |
40 | Replacement of Grab Crane"s LT wheel |
41 | Repair and replacement of 300 CFT cell agitator"s-Diffuser /bell/ Impeller |
42 | Repair of 300 CFT cell agitator"s-bearing assembly |
43 | Replacement of air hose pipe of 300 CFT cell |
44 | Replacement of valve class 150/ 300 at Sala Pump house/ Booster house |
45 | Replacement of Rubber Lined reducer(suction/discharge)/ bend pipe/ spool piece/ ypiece at sala pump house |
46 | Weld Patch repair of MS pipe/ bend/ reducer/ victualic groove pipe at sala pump house |
47 | Replacement of ceramic filter"s vacuum pump/ filterate pump/ back wash pump |
48 | Replacement of friction disc/ distribution valve of hyflow valve |
49 | Replacement of central barrel bearing of ceramic filter |
50 | Repair and replacement of whisk hung of ceramic filter which include welding/ rebuilding worn out surface and grinding |
51 | Replacement of bearings of whisk drive/ central drive |
52 | Repair and replacement of HRT"s under flow pump |
53 | Repair of dosing pump of HRT |
54 | Replacement of conventional thickener"s drive shaft bearing |
55 | Replacement of lifting square bolt and nut of conventional thickener |
56 | Replacement of valve(GATE/NRV/BALL/BUTTERFLY) |
57 | Weld Repair of CI/ CS gate valve/ Non return valve |
58 | Renewal of V-belt in slurry pumps |
59 | Replacement of tyre coupling |
60 | Repair of gear box other than ball mill gear box |
61 | Replacement of pump pulley capacity less than 15 KW |
62 | Replacement of pump pulley capacity beween 15 Kw to 75 Kw |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail