Work Of Repair Of Damaged / Burnt Power Transformer Of Assorted Ratings 5 Mva, 8 Mva And 10 Mva 37.5 / 11 Kv Or 33 / 11 Kv 37.5 / 11 Kv Or 33 / 11 Kv Work Of Repair Of Damaged / Burnt Power Transformer Of Assorted Ratings 5 Mva, 8 Mva And
Tender Overview
Project Description
Work Of Repair Of Damaged / Burnt Power Transformer Of Assorted Ratings 5 Mva, 8 Mva And 10 Mva 37.5 / 11 Kv Or 33 / 11 Kv 37.5 / 11 Kv Or 33 / 11 Kv Work Of Repair Of Damaged / Burnt Power Transformer Of Assorted Ratings 5 Mva, 8 Mva And 10 Mva 37.5 / 11 Kv Or 33 / 11 Kv 37.5 / 11 Kv Or 33 / 11 Kv , Preliminary Inspection Of Transformers At Pvvnl Site / Workshop Involving Minor Repairs At Site / Workshop , Preliminary Inspection Of Transformers At Pvvnl Site / Workshop For Estimation Involving Major Repairs Unloading Of Trnasformers, At Contractors Work & Repair Of Transformer Cover, Draining Of Oil, If Any, Di-Tanking Core And Coil Assembly, And Replacement Of Damaged Parts, Minor Repair Of Core And Tank ( If Required ) Cleaning Washing Of Dust & Dirt Etc. From All Parts Including Core Tank & Cooling Tubes Of Radiators Removal Of Damaged Parts, Requiring Replacement, Fitting, Fixing Of New Parts, Making Connection & Assembly, Complete In All Respect, Re-Tanking After Repairs, Filling Fresh Transformer Oil, Making Transfomer Ready For Tests & Testing For All Tests As Per Clause 16.0 Of Technical Specification. , Hv Leg Coils Complete With Insulation, Varnishing By Vacuum Impregnation ( If Required As Per Sample ) And Baking Of Coil Assembly ( Variable Base Date 01.07.22 ) , Lv Leg Coils Complete With Insulation, Vanishing By Vacuum Impregnation ( If Required As Per Sample ) And Baking Of Coil Assembly ( Variable Base Date 01.07.22 ) , Hv Bushing 33 / 37.5 Kv , Lv Bushing 11 Kv , Hv Bushing Metal Parts , Lv Bushing Metal Parts , Set Of Gaskets ( Rubberized Cork ) , Silicagel Breather With Fresh Silicagel , Magnetic Type Oil Level Gauge With Low Level Alarm Contact , Tapping Switch 33 / 37.5 Kv Complete With Handle , Tapping Switch Handle , Oil Drainvalve Incorporating Sampling Device ( With Narrow Orifice ) & Having Suitable Arrangement For Locking , Filter Valve , Dial Type Thermometer Of Minimum 150 Mm Dia With Maximum Temperature Indicator Complete With Resetting Device And Alarm Contacts , Double Float Bucholz Relay Complete With Alarm And Trip Contacts , Air Release Plug , Replacement Of Damaged Core , Pair Of Arcing Horns , Radiator Valve , Replacement Of Un Repairable Radiator Of Equivelent Size With Equal Fins. , Overhauling Of Oltc , Replacement Of Oltc Contact , Replacement Of Oltc Terminal Barrier Board , Replacement Of Gaskets, Lubrication Of Mechanical System , M. S. Clamping Ring , Winding Temperature Indicator ( Complete Set ) , Fresh Transformer Oil Of Standard Quality As Per Is:335 / 83 And Latest Amendment Thereof. ( Variable Base Date 01.07.22 ) , Sundry Item Viz Cover Bolt, Plug, Caps, Screw, Washers, Insulation Material, Minor Repairs Of Tank, Other Parts Required If Any, Aluminium Name Plate Etc. , Painting Inside & Outside Of Transformer Including Radiator Tubes Concervatorwith Suitable Primer And Two Coats Of Suitable Paint Of Grey Colour And Marking Etc. , Burnt / Damaged Leg Coils To Be Retained By The Contractor ( Variable Base Date 01.07.22 ) , Damaged Metal Parts Of Bushing To Be Retained By Contractor , Transportation / Carriage Charges , Upto 10 Kms. , Above 10 Kms. To 25 Kms. , Above 25 Kms. To 50 Kms. , Above 50 Km. To 100 Kms. , Above 100 Kms. To 150 Kms. , Above 150 Kms. To 200 Kms. , Above 200 Kms. But Upto 300 Kms.
BOQ
| Sl. No. | Item Description |
| 1 | Preliminary inspection of transformers at PVVNL site/workshop involving minor repairs at site/workshop |
| 2 | Preliminary inspection of transformers at PVVNL site/workshop for estimation involving major repairs unloading of trnasformers, at contractors work & repair of transformer cover, draining of oil, if any, di-tanking core and coil assembly, and replacement of damaged parts, minor repair of core and tank (if required) cleaning washing of dust & dirt etc. from all parts including core tank & cooling tubes of radiators removal of damaged parts, requiring replacement, fitting, fixing of new parts, making connection & assembly, complete in all respect, re-tanking after repairs, filling fresh transformer oil, making transfomer ready for tests & testing for all tests as per clause 16.0 of Technical specification. |
| 3 | HV leg coils complete with insulation, varnishing by vacuum impregnation (if required as per sample) and baking of coil assembly (variable base date 01.07.22) |
| 4 | LV leg coils complete with insulation, vanishing by vacuum impregnation (if required as per sample) and baking of coil assembly (variable base date 01.07.22) |
| 5 | HV bushing 33/37.5 KV |
| 6 | LV Bushing 11 KV |
| 7 | HV bushing metal parts |
| 8 | LV bushing metal parts |
| 9 | Set of gaskets (rubberized cork) |
| 10 | Silicagel breather with fresh Silicagel |
| 11 | Magnetic type oil level gauge with low level alarm contact |
| 12 | Tapping switch 33/37.5 KV complete with handle |
| 13 | Tapping switch handle |
| 14 | Oil drainvalve incorporating sampling device (with narrow orifice) & having suitable arrangement for locking |
| 15 | Filter valve |
| 16 | Dial type thermometer of minimum 150 mm dia with maximum temperature indicator complete with resetting device and alarm contacts |
| 17 | Double float Bucholz relay complete with alarm and trip contacts |
| 18 | Air release plug |
| 19 | Replacement of damaged core |
| 20 | Pair of arcing horns |
| 21 | Radiator valve |
| 22 | Replacement of un repairable radiator of equivelent size with equal fins. |
| 23 | Overhauling of OLTC |
| 24 | Replacement of OLTC contact |
| 25 | Replacement of OLTC terminal barrier board |
| 26 | Replacement of gaskets, lubrication of mechanical system |
| 27 | M. S. Clamping ring |
| 28 | Winding temperature indicator (complete set) |
| 29 | Fresh transformer oil of standard quality as per IS:335/83 and latest amendment thereof.(variable base date 01.07.22) |
| 30 | Sundry item viz cover bolt, plug, caps, screw, washers, insulation material, minor repairs of tank, other parts required if any, Aluminium Name Plate etc. |
| 31 | Painting inside & outside of transformer including radiator tubes concervatorwith suitable primer and two coats of suitable paint of grey colour and marking etc. |
| 32 | Burnt/damaged leg coils to be retained by the contractor(variable base date 01.07.22) |
| 33 | Damaged metal parts of bushing to be retained by contractor |
| 34 | Transportation/Carriage charges |
| 35 | Upto 10 kms. |
| 36 | Above 10 kms. To 25 kms. |
| 37 | Above 25 kms. To 50 kms. |
| 38 | Above 50 km. To 100 kms. |
| 39 | Above 100 kms. To 150 kms. |
| 40 | Above 150 kms. To 200 kms. |
| 41 | Above 200 kms. But upto 300 kms. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.