| 1 | Part-A- BT Road WorkClearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per MoRTH Specification : 201By Mechanical Means In area of thorny jungle |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, scaking serviceable and unserviceable materials separately as per MoRTH specification claue : 202By Mechanical Means Bituminous courses |
| 3 | Earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (MoRTH specification Clause 301 to 305). In hard soil mechanically using bull dozer, F.E. loader and carriage upto 1 km by tipper/dumper. |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301 to 305.with lead upto 50 mtr |
| 5 | Providing, laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in mechanical mixer (Pug mill), carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactorto achieve the desired density including all material, labour, machinery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401] with all lead |
| 6 | Providing, laying, spreading and compacting crushed graded stone aggregate of as per table 400-12 and 400-13 to Wet Mix Macadam specification including premixing the material with water to OMC in mechnical mixer as per approved design mix, carriage of mixed material by Tipper to site, laying in uniform layers with motor grader/F.E. Loader/paver finisher in sub base / base course on a well prepared under base and compacting with vibratory roller to achieve the desired density including lighting, guarding, barricading and maintance of diversion etc. (MoRTH specification:Clause 406)bymechanicalmeanswith all lead |
| 7 | Providing and applying primer coat over prepared surface or granular base with bitumen emulsion as per IS: 8887 & manufacturer’s specifications with a self propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures including cleaning of road surface as per MoRTH specification CIause- 502,112 |
| 8 | Providing and applying tack coat with bitumen emulsion on the prepared surface including cleaning as per IS : 8887 & manufacturer’s specifications @ 2 kg /10sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures as per MoRTH specification CI.503,112On surface treated with primer 2.50 to3.0 kg /10sqm |
| 9 | Providing and applying tack coat with bitumen emulsion on the prepared surface including cleaning as per IS : 8887 & manufacturer’s specifications @ 2 kg /10sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures as per MoRTH specification CI.503,112 On existing BT surface 2.00 to2 .50 kg /10sqm |
| 10 | Providing and laying Dense Bituminous Macadam on prepared surface with specified graded crushed aggregates as per table 510 and design mix for base/binder course including loading of material with F.E loader, heating of binder (including cost of antistripping compound wherever required) aggregate and filler in hot mix plant 40-60 TPH transporting the mixed material by tippers and laying with sensor paver finisher as per clause 507.3.5 to the required level and grade, rolling by self propelled power rollers and vibratory rollers or pneumatic tyred roller 150-250KN. TP=0.7MPa to achieve the desired density (approved by the department) but excluding cost of primer/tack coat. [MoRTH Specification : Clause 507,112] with 4.50 % Bitumen with all leadb) with bitumen grade 60/70 (VG-30) |
| 11 | Providing and laying bituminous concrete as per design mix on prepared surface with specified graded stone as per table 500 - 8, 9,10 for wearing course including loading of aggregate with F.E. Loader and hot mixing of binder (including cost of antistripping compound, wherever required) and 3% cement filler with aggregates in hot mix plant 40-60 TPH Transporting the mix material with tipper to paver and laying with sensor paver finisher (as per clause 505.4.8) to the required level, grades and rolling with vibratory compactor and pneumatic tyred roller 150 - 250 KN, TP = 0.7 MPa, to achieve the desired density (approved by the department) excluding cost of primer/tack coat (MoRTH Specification : Clause -505,112) with all lead 30-45 mm compacted thickness with 6% binder grading - 2 with all lead of mix material a) with bitumen grade 60/70 (VG-30) |
| 12 | Providing and laying of hot applied thermo plastic compound inclusive of type-1 reflectorising glass beads as per table 800.3, 800.4 applied in uniform thickness of at least 2.5 mm and spread uniformlywith reflectorising glass beads type-2 in addition @ 250 gm/scm with a road marking machine as per IRC : 35 complete with traffic diversion arrangement as per MoRTH specification clause 803.4. |
| 13 | Part-B -CC PevementProviding, laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in mechanical mixer (Pug mill), carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactorto achieve the desired density including all material, labour, machinery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401] with all lead |
| 14 | Construction of dry lean cement concrete sub- base over a prepared sub - grade with coarse and fine aggregate conforming to IS : 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15 : 1, aggregate gradation after blending to be as per Table 600 - 1, cement content not to be less than 150 Kg/Cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant as per mix design, transported to site, laid with a hydrostatic paver with electronic sensor, compacting with 8 -10 tonne vibratory roller, finishing and curing complete as per MoRTH specification clause 601. |
| 15 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub-base with 43 grade cement , coarse and fine aggregate conforming to IS: 383 as per design mix, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including dewatering by vaccum pump and provision of contraction, expansion, construction, longitudinal joints, joint filler, separation membrance, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing complete as per MoRTH specification clause 602. Design mix grade M30 |
| 16 | Part-C -CD WorkEarth work in excavation for foundation of structurecompletewith all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305 In ordinary soil Depth upto 3 metre |
| 17 | Providing and laying mechanically mixed and vibrated Cement Concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level as per MoRTH Specification : Clause 1000 & 1700. P.C.C. 1:3:6 mix with crushed stone aggregate 20 mm nominal size. |
| 18 | Providing&fixingprecastcementconcretecoping1:2: 4mix50mmthickcompleteas per specification |
| 19 | Providing and laying stone masonry work in cement mortar with mechanical mixer for foundation (any level) complete including all scaffolding etc. but excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400. Random rubble masonry In cement mortar 1:6 |
| 20 | Raised and cut pointing on stone work in CM 1:3 (1 cement : 3 sand) |
| 21 | Providing and laying Precast reinforced cement concrete Box culvert section of M-40 grade designed for \"AA\" class loading as per IRC specifications including to effect of impact, EQ etc. complete on form base of 200mm thick lean concrete of M-10 grade with aggregate of size 40mm nominal of following internal size the work includes required safety measures construction of drain for diversion of flowing water cost of design of RCC Precast Box and its proof checking from IIT/MNIT Jaipur complete in all respect as per specifications |
| 22 | Size 2.00 M x 2.00 M |
| 23 | Size 1.00 M x 1.00 M |
| 24 | Size 0.60 M x 0.60 M |
| 25 | Providing, laying & fixing in position RCC spun or hume pipes ISI marked with proper jointing in required slope packed in the gasket of hume or spun yarn and neatly finished with rich grout of cement moratar 1:3 or having flexible rubber ring joint made with prefectly air and water tight including testing of joints as per MoRTH Specfication : Clause : 1000 & 2900 NP - 3, 300 mm dia |
| 26 | Part-D -Protection WorkEarth work in excavation for foundation of structurecompletewith all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305 In ordinary soil Depth upto 3 metre |
| 27 | Providing and laying mechanically mixed and vibrated Cement Concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level as per MoRTH Specification : Clause 1000 & 1700. P.C.C. 1:3:6 mix with crushed stone aggregate 20 mm nominal size. |
| 28 | Providing&fixingprecastcementconcretecoping(1 : 2 : 4)mix50mmthickcompleteas per specification |
| 29 | Providing and laying stone masonry work in cement mortar with mechanical mixer for foundation (any level) complete including all scaffolding etc. but excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400. Random rubble masonry In cement mortar 1:6 |
| 30 | Raised and cut pointing on stone work in CM 1:3 (1 cement : 3 sand) |
| 31 | Part-E -Drain WorkEarth work in excavation for foundation of structurecompletewith all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305 In ordinary soil Depth upto 3 metre |
| 32 | Providing and laying Plain cement concrete mix with stone aggregate 20 mm nominal size mechnically mixed and vibrated in foundation up to a depth of 1.50 metres below ground level and/or 1.50 metres above ground/bed level as per MoRTH specification : clause 1000 & 1700. with all lead R.C.C. grade M-20 in bed plates upto ground level excluding cost of steel reinforcement but including the cost of centering & shuttering |
| 33 | Providing & fabricating steel reinforecemnt for RCC work including cutting, bending, placing in position and binding complete including cost of binding wire as per MoRTH Specification : Section 1000 & 1600 TMT Steel reinforcement |
| 34 | Providing and fixing of reinforced ferro-cement drain cover designed for class \"AA\" / \"A\" loading duly marked on cover with adequate steel reinforce- ment having thickness 75mm to 150 mm, anti-corrosive bitumen painted M.S. plate, rim and on M.S. lifting hooks, admixture like plastisizer bond-improving compound, shrinkage resistant compound, abrasion resistant complete as per approved design etc. Class \"AA\" loading 600 x 800 mm (125 mm thick) |
| 35 | Part-F -Road FurnitureS & F in position cut stone neatly dressed including earth work, C.C. 1:4:8 painting with enamel paint engraving letters and numerals as per IRC standard design complete. |
| 36 | 5th Kilometre Stone |
| 37 | Ordinary Kilometre Stone |
| 38 | 200 m Stone |
| 39 | Guide stones |
| 40 | Supply of direction and place identification sign boards made out of 2mm thick sheet framed to angle iron 40 x 40 x 5 mm and two vertical posts of angle size 65 x 65 x 6 mm, 3 m long with hold fasts, stove enamelled paint and reflective letters, numerals, symbols etc. complete of size : 1500 x 1200 mm |
| 41 | SupplyofMandatory / Regulatoryretroreflective sign boards 60 cm dia made out of 2.0mm thick aluminium sheet face to be fully covered by white/ blue high intensity grade retro reflective sheeting with Red/white symbol, cut out or screen printed back ground with epoxy paint, complete confirming to MoRTH specificationsCIause. 801 with angle iron post 65 x 65 x 6mm 3Mtr. long. |
| 42 | Supplyofcautionary / warningsignboard90cm equilateral triangle made out of 2.0 mm thickaluminumsheetfacetobe fully covered by white/blue high intensity grade retro reflective sheeting with Red / white symbol,cut out or screen printed background with epoxy paint complete confirming to MoRTH specificationsclause. 801 with angle iron post 65 x 65 x 6 mm. 3 mtr. long |
| 43 | P& F Mukhya Mantri Sadak Yojana logo for roads funded by State road fund having M.S. Definition plate of 1.6mm thickness frame to steel hollow dsection of 75mm x 75mm, 2.5m long stove enamelled paint with hold fast including paint logo as per approved design and colours. The logo shall be made out of 1.6mm thick circular plate fix on 1200mm x 150mm rectangular steel base plate 1.6mm thick, the base of circular shall be plain at the junction of base plate. The size of definition plate shall be 1500x600mm and embedding the posts by M-15 mix C.C. block 300x300x600 mm including lettering / writing and painting etc. complete in all respect |
| 44 | Construction of Pedestal of thickness 225mm in brick masonary in CM 1:6 as per design and drawing complete with 25 mm thick plaster in CM 1:4 plaster and weather coat paint |
| 45 | Supply & Fixing of one side polished Black granite stone 20 mm thick with engraved and gold colour painted letter ( upto 200 letter) & border as per direction of engineer in charge on existing pedestals including transportation |
| 46 | Supplying, hoisting and fixing in position overhead sign with a corrosion resistant 2mm thick aluminium alloy sheet with heigh intensity grade retro-reflective sheeting of encapsulated lens exclusive lettering, border and signs type with vertical and lateral clearance installed over a designed support system of aluminium alloy or galvonised steel trestles and trusses of sections and type as per structual design requirements and approved plans. As per MoRTH specifications : Clause 801 & 802. |
| 47 | Truss and vertical support |
| 48 | Aluminium alloy plate fixed with heigh intensity grade sheeting |
| 49 | Supply of Cat\"s Eye made of aluminium alloy size 75 x 100 x 22 mm having 21 bi-convex lenses embedded in circular disk of ABS plastic on each side. |
| 50 | Fixing of cat\"s eyes on road surface/walls includingtransportation,excavationetc. complete. |
| 51 | Supply of Shevron sign of size 600x450 mm made out of aluminum sheet 2 mm thick both side with fixing provision on M.S. angle iron post 50x50x6 mm 3 M long screwed with stainless steel nut bolts of 8 mm dia, plate is covered by high intensity grade retro-reflective sheeting and black reflective arrow, complete in all respect. |
| 52 | Installation of sign boards having the posts like mandantory, cautionary and informatory boards including excavation, fixing of posts in 300 mm dia. RCC hume pipe (IS marked) 1.20 m long, 75 cm embedded in ground, the in side of pipe shall be filled with cement concrete 1 : 4 : 8 with semi-circular hump at top, the pipe shall be painted white with enamel paint including transportation etc. complete. |
| 53 | Single post |
| 54 | Double post |