Engineering, Procurement, Construction, Testing, Commissioning, Trial Run And Operation And Maintenance Of Various Components For Source Level Augmentation Of Various Water Supply Schemes Under Jsv Division Solan, Jsvdivision Arki, Jsv Division Nala, solan-Himachal Pradesh

Irrigation And Public Health Department has published Engineering, Procurement, Construction, Testing, Commissioning, Trial Run And Operation And Maintenance Of Various Components For Source Level Augmentation Of Various Water Supply Schemes Under Jsv Division Solan, Jsvdivision Arki, Jsv Division Nala. Submission Date for this Tender is 22-08-2022. Tanks and Cylinders Tenders in solan Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

33230323
Engineering, Procurement, Construction, Testing, Commissioning, Trial Run And Operation And Maintenance Of Various Components For Source Level Augmentation Of Various Water Supply Schemes Under Jsv Division Solan, Jsvdivision Arki, Jsv Division Nala
Open Tender
Indian
Himachal Pradesh
solan
22-08-2022

Tender Details

Engineering, Procurement, Construction, Testing, Commissioning, Trial Run And Operation And Maintenance Of Various Components For Source Level Augmentation Of Various Water Supply Schemes Under Jsv Division Solan, Jsvdivision Arki, Jsv Division Nalagarh In District Solan ( H.P. ) ( Sh :- C / O 2 No.Check Dam And, 1No. Head Weir, 2No. Percolation Chamber, Crate Wall, 3No. Slow Sand Filter, 2 No Intake Structure, Wtp Of 1.1 Mld, 6 Nos Pump House, Sump Well, Main Storage Tanks And Sector Storage Tanks Of Various Capacity, Boundary Wall Around The Wtp And Barbed Wire Fencing Around The Pump Houses, P / L Rising Main And Gravity Main Of Various Dia And Class, S / E Of Pumping Machinery, Automation System, Chlorination Including Trial Run, Defect And Liability Period And Running And Maintenance Of The Entire Scheme For 5 Years ( Cost Of Running & Maintenance Shall Be Paid From State Funds ) .

Key Value

Document Fees
INR 2500 /-
EMD
INR 4022000.0 /-
Tender Value
INR 40.21 Crore /-

BOQ Items

Name of Work: Engineering, procurement,construction, testing, commissioning, trial run and operation and maintenance of various components for Source level Augmentation of various water supply schemes under JSV Division Solan, JSVDivision Arki, JSV Division Nalagarh in District Solan (H.P.) (SH :- C/O 2 No.Check Dam and, 1No. Head weir, 2no. Percolation Chamber, Crate wall, 3No. Slow sand filter, 2 no intake structure, WTP of 1.1 MLD, 6 Nos Pump house, Sump well, Main storage tanks and Sector storage tanks of various capacity, Boundary wall around the WTP and Barbed wire fencing around the pump houses, P/L Rising main and gravity main of various dia and class, S/E of pumping machinery, Automation System, Chlorination including trial run, defect and liability period and running and maintenance of the entire scheme for 5 years (cost of running & maintenance shall be paid from state funds).
Sl. No. Item Description
1(Solan Division) Schedule A1 - Civil Works:-Boundary Wallwork around all the civil works such as Pump Houses, SSFs as mentioned below by laying 1:5:10( 1 cement 5 sand and 10 stone aggregates 40mm nominal size) as a lean Conc. inPlinth and foundationand Providing CC 1:3:61 cement 3 sand 6 aggregates 20 mm uptoG.Land 15cm over G.Lthereafter construction of Brick masonary Pillar upto height of 3.0m around the civil structure @ 3.0m distance c/c and plastering on exposed portion ofCC 1:3:6 with cement mortar 1:3 (1 cement 3 sand ) and fixing of M.S grills of required size as approved by the competent authority in between the brick pillarincluding appliying primer and painting i to the entire satisfaction of the Engineer-in-charge.(Refer Vol-III-data sheetNo. 1.0and vol II for technical specification or further details.)
2Proposed Pump House near SSF Kothi Bara
3ProposedSlow Sand filter @ Dharol - 5 X 4 X 2.9 m
4ProposedSlow Sand filter @ Kothi Bara - 5 X 3 X 2.9 m
5ProposedSlow Sand filter @ Chhausha - 6 X 4 X 2.9 m
6Fencingwork around all the civil work such as MBRs, SRs etc 1.80 metre high fencing with 2.50 metre MS angle iron post with 300 mm girth (minimum) 2.50 metre centre to centre with nine horizontal lines and two diagonals of galvanised steel bare bed wire (IS:278-1962) type-I) wieghing 9.38kg per 100 metre (minimum) strainedand fixed to posts with GI staples including coal tarring including coal tarring of ballies complete fixed with cc 1:2:4 (45x45x45)in groundsize of MS angee post 1.80 m high will be ISA 50X50X5mmand fixed to post with proper fastening arrangement. The ISA post shall be embedded 450 mm deep in cc 1:2:4 with proper fastenging arrangement protected with using suitable primer and anti corrosive paint level difference at difference point shall be suitably taken care so as to look aesthetically good including cost of excavation foundation concrete and providing and fixing M.S gate of suitable size where required complete in all respect to the entire satisfaction of the Engineer-in-charge. (Refer Vol-III-data sheetNo. 2.0and vol II for technical specification or further details.)
7Crate Wall:- (Refer Vol-III-data sheetNo. 3.0and vol II for technical specification for further details.)
8Excavation in earth work and disposal of all excavated earth upto a lead of 20 mtrs. (twenty metres) and lift upto 1.50 mtrs. (one point fifty metres) disposing earth to be leveled and neatly dressed pick jumper work within all leads and lifts as directed by the Engineer-in-charge.
9Wire crates made of G.I. wire filled with boulders with square cut faces against the wire. (Boulder filling to be measured and paid for separately) GI wire 5mm thick corresponding as directed by the Engineer-in-charge.
10Wire crate of G.I. wire filles with boulders with square cut faces against the wire (Wire crates to be measured and paid for separately) within all leads and lifts and as directed by the Engineer-in-charge.
11Pump House:-Designing, Constructing, Testing & Commissioning of Pump House & Chowkidar Room at following Locations including all allied Civil Works, Electrical works, Sanitay work, Site development, cutting/excavation in all kinds of soils including construction ofPCC/RCC Retaining walls, Breast walls, Toilets, Septic Tanks, internal lighting of regular electricity and External Solar powered Street lighting, External landscaping, fire Fighting arrangement, dewatering etc complete job as directed by Engineer in charge The rates quoted by the contractor shall be for the complete work. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account. (Refer Vol-III-data sheetNo. 4.0and vol II for technical specification or further details.)
12Proposed Pump House(48 sqm) at Proposed SSF Kothi Bara
13Designing, Constructing, Testing & Commissioning R.C.C. Circular underground/ partially under ground / Over head storage tanks as per capacity given below at various stages/sites including excavation in all kinds and types of strata, soil strata including dewatering in M30 design mix in foundation, walls, bottom slab , roof slab/dome with smooth finishing in 1:3 inside the tank, all alied Civil Works, Site development, cutting/excavation in all kinds of soils, C/o PCC/RCC Retaining walls, Breast walls,refilling and disposing of surplus stuff with in all leads and lifts, labour and material charges. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe proper manifiold at outlet including all fittings, bye pass arrangement consisting of GI / MS pipes special and valves of required classes and dia and all other accessories required such as Aluminium ladders inside and MS ladder outside,ventilator with mosquito proof wire mesh,lightening arrester complete ,MS manhole covers including frames and covers (heavy duty) with proper locking arrangement water level indicator, RCC frames for all valves ventilating shafts shall also be provided including all leads and lifts as per entire satisfaction of Engineer-in-Charge. The tanks shall be hydraulically tested for water tightness all works shall be conforming to relevant IS code.The cost of valves & other accessories shall be included in the rates of tanks .Battery Limit shall be considered as 3.00 m from the edge of the structure or the boundary of the land whichever is less.The rates quoted by the contractor shall be for the complete work i.e testing of bearing capacity at site . All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account.The work shall include supplying of Five sets of structural design after testing the bearing capcity of soil and drawings, etc complete as directed by Engineer in charge as per relevent data sheet and scope of work.(Refer Vol-III-data sheetNo. 5.0and vol II for technical specification or further details.)
14MST DHAROL BASHA
15MST KOTHI BARA
16SR DHALA
17SR GANDRORI
18SUMP WELLat ( Dare Ka Nalla)
19Slow sand filters:-Providing, installation, testing and commissioning of Slow sand filter of required area, ( consisting sedimentation tank, clear water chamber)including cost of construction of civil works, hoisting and errection of all steel works, providing and installation of all mechanical/Electrical equipments/accessories, laying of all interconnecting GI/MSERW pipes and scouring arrangements from all units with disposal of the same , all types of valves, fittings and all contingent works capable of taking input and giving output as laid down in chapter-I of CPHEEO manual under all climatic conditions specified therein.Providing and fixing of lighting arrangements complete in all respect. including Providing and fixingfilter media as per CPHEEO mannual with proper walk way for Inspection/ operation of various units. The design of various units shall conform to relevant IS Codes and specifications. All the water retaining stuctuctures shall be designed and constructed in M-30 RCC. (Refer Vol-III-data sheetNo. 6.0and vol II for technical specification or further details.)
20SH:-C/o Slow Sand filter @ Dharol - 5 X 4 X 2.9 m
21SH:-C/o Slow Sand filter @ Kothi Bara - 5 X 3 X 2.9 m
22SH:-C/o Slow Sand filter @ Chhausha - 6 X 4 X 2.9 m
23Survey ,Designing, Constructiion of R.C.C Percolation wells6m x 9.0m including excavation in all kinds of soil strata, dewatering, erection and lowering of welb curbin the pit M30 grade, no fine concrete,CC works in M30,with platform 1.2m wide in steel with railingThe other requirement /Specifications shall be as per(Refer Vol-III-data sheetNo. 7.0and vol II for technical specification or further details.)
24Proposed Percolation Chamber at Dharol Nallah
25Proposed Percolation Chamber at Kothi Khad
26Check dam:-(Refer Vol-III-data sheetNo. 8.0and vol II for technical specification or further details.)
27Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm.layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge.
28Providing and laying cement concrete 1:5:10 (1 cement: 5 sand: 10 graded stone aggregated 40 mm nominal size ) and curing complete excluding cost of form work in foundation and plinth.
29Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring shuttering ,strutting and propping etc.with wooden battens and ballies,height of propping and centring below supporting floor to ceilingnot exceeding 4 mtrs. andremoval of the same for in situ reinforced concrete and plain concrete work in:- Vertical surfaces such as walls (any thickness) partition and the like including attached pillaster,buttresses plinth and string courses and the like.
30Providing and laying cement concrete workusing concrete mix of M-30 withgraded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work plain concrete work. as per H.P.P.W.D specifications.
31Providing mild steel/tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level
32Head Weir :-(Refer Vol-III-data sheetNo. 9.0and vol II for technical specification or further details.)
33Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm.layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge.
34Providing and laying cement concrete 1:5:10 (1 cement: 5 sand: 10 graded stone aggregated 40 mm nominal size ) and curing complete excluding cost of form work in foundation and plinth.
35Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring shuttering ,strutting and propping etc.with wooden battens and ballies,height of propping and centring below supporting floor to ceilingnot exceeding 4 mtrs. andremoval of the same for in situ reinforced concrete and plain concrete work in:- Vertical surfaces such as walls (any thickness) partition and the like including attached pillaster,buttresses plinth and string courses and the like.
36Providing and laying cement concrete workusing concrete mix of M-30 withgraded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work plain concrete work. as per H.P.P.W.D specifications.
37Providing mild steel/tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level
38Retrofiting ofExisting Infrastructure
39Retrofitting of existing pump houseat Dharol:- Retrofittingof Pump House including all allied Civil Works , Such as Plastering ,Brick work, Roof Sealing, R.C.C Work Some part of Electrical works, complete as directed by Engineer in charge The rates quoted by the contractor shall be for the complete work. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account.(Refer Vol-III-data sheetNo. 10.0and vol II for technical specification or further details.)
40Retrofitting of existing MBR at Kot Kadour of capacity 80KL smooth finishing in 1:3 inside the tank, all allied Civil Works, Site development, PCC/RCC Retaining walls, jacketing, refilling and disposing of surplus stuff Repair of ventilatorwith mosquito proof wire mesh, complete ,MS manhole covers including frames and covers (heavy duty) with proper locking arrangement water level indicator including all leads and lifts as per entire satisfaction of Engineer-in-Charge. The tanks shall be hydraulically tested for water tightness all works shall be conforming to relevant IS code. The rates quoted by the contractor shall be for the complete work . All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account (Refer Vol-III-data sheetNo. 11.0and vol II for technical specification or further details.)
41Schedule A2- Pumping Machinery and Electrical works :-Supply Installation, Testing & Commissioning with automation (To be paid separately) of horizontal spindle,horizontal/redial split casing/end suction (Back-pull out arrangements) single/double/multi stageenergy efficient Centrifugal Clear water Pumpor combination of pumps, ofKSB Make for the following duty conditions, as per BIS 1520-1980 with upto date ammendments,read with IS:9137-1978 or latest edition suitable for lifting water for under mentioned characterestics with bronze,impellers/priming funnels,casing ring and shaft sleeves of bronze,shaft of steel grade45C8/ EN8 with cast iron casing coupled directly through a flexible coupling on a common MS Base Plate to squirrel cage TEFC Energy efficient motors (Conforming to energy efficiency code IE2 or higher ) of standard make such as Kirloskar /BHEL /CG POWER /Siemens /Jyoti /ABB /Marathon and suitable for operation on 415 (+10% ) and ( -15% ) volts, 50 cycles / second, 3 phase AC electric supply. The power of electric motor/motors should be at +10% in excess of the maximum power required by the pump/pumps in the operation range of (+) 10% and (-)15%of the duty poiint head. The motor/motors as per ISI:325:1978 with upto date ammendments read with IS 900:1972. It should include cost of bearing nuts , bolts and painting etc. and should meet the following requirements:including Pump sets (working + standby ), necessary piping for suction, delivery & common header,alongwith electrical control panel with soft starters;as per requirement of pumping machinery; Complete workinclusive of all taxes,transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores / site, stacking, etc.including specials and wastage etc. It shall include providing and fixing of C.I/C.S Sluice valves of approved make and appropriate class to resist the design pressure andcomplete as per Tender Specifications and instruction of Engineer in charge. If there any variation in HP of pumping machinery due to variation of head after re-survey and design approval by the department then the rates shall be paid on prorata basis after approval of the competant authority and will be paid accordingly.) Bidder to offer single or combination of pump to meet out the above requirement with 100 % stand byarrangement (Refer Vol-III-data sheetNo. 12.0and vol II for technical specification or further details.)
42Discharge 1.23 LPS with 272.78 m Total Head (single or combination of pump to meet out the above requirement with 100% standbyarrangement )
43Discharge 0.93 LPS with 171.37mTotal Head( single or combination of pump to meet out the above requirement with 100% standbyarrangement )
44Schedule A3- Rising Main :-Excavation in foundations and trenches (for pipes and pits) upto all depths etc. in all kinds of soil such as pick work, jumper work and saturated soil including bailing or pumping out of water, blastingin soft/hard rock or chiseling or wedging out of same where blasting is prohibited in all leads and lifts includingtrimming and dressing of sides, leveling of beds to correct grade including shoring strutting, plankingtimbering and dewatering wherever required, stacking usable and unusable material/soil separately andafter laying jointing and testing of pipes, returning he usable soil in 15 cmlayer by ramming andwatering and then disposing of all surplus excavated soil/unusable material as directed within all leads and lifts including restoration of unmetaled/ mattelledsurfaces to its original condition and including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per the direction of Engineer-in-charge.
45Providing, laying,jointing and testing in trenches of Galvanized GMS pipes by circumferential butt welded pipes with 1% flanges joint in between ( cost of 1% flange joint to be measuredpaidfor seperately ) including cost of bends of all degrees conforming to IS : 1239 -1990 ( PART 2) Having wall thickness as specified below with plain and capable of withstanding required test pressure in random length of 4-7m including special ,short pieces bends , reducer ,tees etc made from parent tube , the MS flanges are to be provided 1% of Total joints and remaining 99% joints with Butt welded as detailed below . The laying of pipe shall including all operation such as cutting, welding , jointing, providing and fixing of MS flanges, fabrication of bend, Tees, valve etc icluding lowering and laying in excavated trenches to ensure Require level including flushing, cleaning and hydrolical testing complete in all respects to the satisfaction of the engineer encharge. the fabricated bends shall have 3or 4 cutts having its radius not less then five time the dia of pipe . The pipe shall be factory galvanised ( Zinc coating both inside and outside ) as per IS 4736-1986 ( With upto ammendments) with mass of Zinc Coating will be as per relevant IS code . The welding electrode shall be as IS 814:2004 of Advani ,Oerlikol/L&T or ISI marked make .The work shall be Done as per1% of total joints and remaining 99% joints with butt welded joints as detailedbelow. The MS flanges shall confirm to BIS 6392-1971 (with latest up to date amendments) duly welded in three layers (one inner and two outer) with pipes at both ends as per relevant BIS standards along with nuts and bolts of required sizes confirming to BIS 1364 (with upto date ammendments). 3mm thick compressed asbestos fiber/synthetic rubber gaskets confirming to relevant BIS standards. The laying of pipe shall include all operation such as cutting, welding, jointing, providing & fixing of MS flanges, fabrication of bends, tees,valves etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The pipes shall be factory galvanized (zinc coating both inside and outside) as per IS:4736 -1986 (with upto date ammendments) with mass of zink coating not less than 360 gm/m2. The welding electrodes shall be as per IS 814:2004 of Advani Oerlikon/ L&T or ISI marked make. Negative tolerance in thickness and mass/weight will be as per relevant IScode .Welding and fixing ofM.S. flanges @ 1% of joints, conforming to following tables as per IS 6392-1971 (Latest with up to date amendments) . The welding of flanges should conform to IS 816-1969 with electrodes as per IS: 814-1991 and required number of nuts and bolts conforming to IS 1364, the thicthness of gasket not less than 3.00 mm conforming to IS 2712-1998. The work shall be done as per entire satisfactio of Engineer- in- charge with in all leads and lifts.The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches, flanged joints . The diameter and class / material of pipe are indicative. Since the re-survey and re-design of proposal / scheme is to be carried out by the lowest bidder, the design/drawings are to be approved by the competent ) (Refer Vol-III-data sheetNo. 13.0and vol II for technical specification or further details.)
46Dharol Basa to MBR Dharol Basa:- 50 mm dia GI Heavy Gradepipe as per IS 1239-1 fromRD 0 to 934 Wall thickness 4.5mm
47SSF Kothi Bara to MBR Kothi Bara:- 40 mm dia GI Heavy Gradepipeas per IS 1239-1 fromRD 0 to 720Wall thickness 4.5mm
48Providing and welding M.S. flanges at suitable point, conforming to following tables as per IS 6392-1971 (Latest with up to date amendments) as per IS:6392-1971 (Latest with upto date amendments) and welding of MS Flanges with G.I. Pipes/ MSERW pipes in two layers on both faces to make the joint leak proofin between rising main wherever reqired .(The cost of providing and laying of G.I.Pipes/MSERW Pipes to be measured and paid for separately). The welding of flanges should conform to IS 816-1969 with electrode as per IS : 814-1991 and required number of nuts & bolts conforming to IS: 1364.The thickness of gasket not less than 3.00mm conforming to IS : 2712-1998.The work shall be done as per entire satisfaction of Engineer-in-Charge within all leads and lifts.(Refer Vol-III-data sheetNo. 13.0and vol II for technical specification or further details.)
49Dharol Basa to MBR Dharol Basa:- 50 mm dia GI Heavy Gradepipe from RD 0 to 934 Flange Table-28
50SSF Kothi Bara to MBR Kothi Bara:- 40 mm dia GI Heavy Gradepipe from RD 0 to 720 Flange Table-23
51Providing and fixing double flanged cast steel reflux valve of following dia of Kirloskar/Leadermakeconforming to BS:1868 ofcampanion sheet gasket 3 mm thick with MS flanges of require size of table as per IS 6392-1971 i/c welding of M.S. flanges in two layers on both faces to make the joint leak proof and capable of with standing of nominal seat pressure of 104.00/52.00/21.00 Kg/cm2 with upto date amendments i/c carriage in all leads & lifts & complete in all respect a as per direction and to the entiresatisfaction of Engineer-in-Charge. (Refer Vol-III-data sheetNo. 13.0and vol II for technical specification or further details.)
52Dharol Basa to MBR Dharol Basa 50 mm dia ASA -300 Flange
53SSF Kothi Bara to MBR Kothi Bara 40 mm dia ASA -150 Flange
54Providing and fixing double flangedCast Steelsluice valveof following dia of Leader/Kirloskarmakeconforming to releventIS: 14846/2000including champion sheet gasket 3mm thick, welding with M.S. flanges of reqiure size of table as per IS 6392-1971 including carriage in all leads and lifts as per direction and to the entiresatisfaction of Engineer-in-Charge. (Refer Vol-III-data sheetNo. 13.0and vol II for technical specification or further details.)
55Dharol Basa to MBR Dharol Basa 50 mm dia ASA -300 Flange
56SSF Kothi Bara to MBR Kothi Bara 40 mm dia ASA -150 Flange
57Schedule A4- Gravity Main & Distribution System:- Excavation in foundations and trenches (for pipes and pits) upto all depths etc. in all kinds of soil such as pick work, jumper work and saturated soil including bailing or pumping out of water, blastingin soft/hard rock or chiselling or wedging out of same where blasting is prohibited in all leads and lifts includingtrimming and dressing of sides, levelling of beds to correct grade including shoring strutting, plankingtimbering and dewatering wherever required, stacking usable and unusable material/soil separately andafter laying jointing and testing of pipes, returning he usable soil in 15 cmlayer by ramming andwatering and then disposing of all surplus excavated soil/unusable material as directed within all leads and lifts including restoration of unmetalled/ mattelledsurfaces to its original condition and including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per the direction of Engineer-in-charge.
58Providing, laying, jointing, testing and commissioning in trenches galvanised mild tube of following dia (Medium grade) including providing and fixing tube fitting such as reducer increaser, socket, union, tees, bends etc. where ever required (earth work in treanches tobe measured and paid saparately) and as per the direction of Engineer-in-charge including entire carriage of material upto loads and lifts(Refer Vol-III-data sheetNo. 14 and vol II for technical specification or further details.)
59G.I Pipe 32mm dia ( medium class ) as per is 1239 ( in Distribution system)
60G.I Pipe 40mm dia ( medium class ) as per is 1239 ( in Distribution system)
61G.I Pipe 50mm dia ( medium class ) as per is 1239 ( in Distribution system)
62G.I Pipe 65mm dia ( medium class ) as per is 1239 ( in Distribution system)
63Providing, laying, jointing, testing and commissioning in trenches galvanised mild tube of following dia (medium grade) including providing and fixing tube fitting such as reducer increases, socket, union, tees, bends etc. where ever required (earth work in treanches tobe measured and paid saparately) and as per the direction of Engineer-in-charge including entire carriage of material upto loads and lifts (Refer Vol-III-data sheetNo. 15and vol II for technical specification or further details.)
64G.I Pipe 50mm dia ( medium class ) as per is 1239 ( in Gravity system)
65G.I Pipe 40mm dia ( medium class ) as per is 1239 ( in Gravity system)
66Providing and fixing double flangedsluice valve of following dia of Kirloskar/Leadermakeconforming to BS:1868 ofvariousClass including campanion sheet gasket 3 mm thick with MS flanges of table-5 as per IS 6392-1971 i/c welding of M.S. flanges in two layers on both faces to make the joint leak proof and capable of with standing of nominal seat pressure of 10.20 Kg/cm2 with upto date amendments i/c carriage in all leads & lifts & complete in all respect a as per direction and to the entiresatisfaction of Engineer-in-Charge. (Refer Vol-III-data sheetNo. 15 and vol II for technical specification or further details.)
6750 mm dia. of grade P.N. 1.0
6840 mm dia. of grade P.N. 1.0
69Providing and fixing double flangedCast steel air release valveof following dia of Leader/Kirloskarmakeconforming to IS: 14845/2000 with up to date amendment as per ClassASA -150to withstand in normalseat pressure of 21.00 Kg/cm2 including champion sheet gasket 3 mm thick, including carriage in all leads and lifts as per direction and to the entiresatisfaction of Engineer-in-Charge.(Refer Vol-III-data sheetNo. 15and vol II for technical specification or further details.)
7050 mm dia.
7150 mm dia.
7225 mm dia.
73Schedule A5- Automation :- AUTOMATION: The tendered / firm shall provide proposals for automation (Wired/Non wired) to automize the entire scheme i.efrom intake pointup to MBRProvision of automation shall be with main SCADA and control station at treatment plant atWater treatment plant. GSM based devices shall be installed at each MBR & SBRof every stage in both phaseswhich shall send messages through WEB SCADA stations at two offices and five Mobile Numbers. This data transmission system at each tank of pump station consists of field instruments for providing digital and analog signals to data transfer module. This module will have a communication to web data transfer system module communication. The PLC station will have control station with programmable graphic process, mimics, real time and historical trending face plate and group display, alarm management and report with Laser Jet printers and required furniture. Installation of hardware along with commissioning/ programming as per user requirement shall be done.The firm / contractor will provide the Bulk metering at Water Treatment Plants. The automation of the entire scheme upto Sector storage tank shall also include the followings : (a) At intake point : Provision shall be kept for automatic flow measurement and flow control with quality measurement turbidityin (b) Water Treatment Plant.Fully automatized operation including alum dosing and back washing and chlorinationfrom inlet to out let along with automatic sensor for Turbidity, pHand Residual chlorine) (c) Storage Water Tanks at lifting station:-Automatic Inlet and Out Let through single out flow pipe (common header), Low and high level sensoralong with all required accessories. It should also include telecommunication comprising of required numbers of connections as per actual requirement at site. The automation system installed at above/aforesaid locations should be theft proof and proper ventilation arrangements be made complete in all respect to the entire satisfaction of Engineer-in Charge.The firm/contactor shall submit complete proposal for automation and got approved from competent authority, along with presentation .Firm/Cont. has to incorperate all the inputs and outputs suggested by the Deptt. in the SCADA system to automized the entired scheme from intake point to all sector storage tanks as per relevant data sheet No-14 and scope of work.. (Refer Vol-III-data sheetNo. 16.0and vol II for technical specification or further details.)
74Schedule A6- Disinfection System :-Supply, installation commissioning and testing of Gaseous Chlorination Plant at MSB .Vacuum operated pressure feed gaseous chlorinator of Chloromax / Capco/ Capital makes for Chlorination of water by direct feeding to water main consisting of the such as :-i ) Chlorinator capable to deliver 0-1000 gm/hr of chlorine gas comprising of spring opposed inlet valve, rate valve, flow meter remote ejector assembly with built in check valve, vacuum tubing , vent tubing and injection assembly .II)Booster pump set Set of 2 No. :1W+ 1SB with electric motor of make CROMPTON/KIRLOSKAR/ABB operated on 400/440 volt, 3 phase 50hz electric supply to suit ejector assembly of chlorinator, mounted on common base frame . III) Water piping from water main/UGR Set of 2 No. :1W+ 1SB to booster pump and delivery of water to elector through 20mm CPVC pipe complete with all fitting such as 20mm inlet gate valve, 20mm delivery valve, Y type strainer and solution delivery piping 20mm heavy duty PVC plumbing pipe sch 80 upto injection point before ejector assy/piping upto delivery mains. Total piping not exceeding 24 mtrs. IV) Accessories/spares: Multi purpose cylinder Key-1 No. lead washers -6 Nos Ejector gasket-2 sets. Hose clips- 4 Nos. Ammonia Bottle – 50ml -1 No. V) Chlorine Cylinders: Chlorine gas Cylinder 100kg ., capacity as per BIS Duly certified by CCE Nagpur and filled with Chlorine gas. VI) Chlorine Leak Detector with sensor and alarm,Electric Panel for booster pumps & leak detector. (Refer Vol-III-data sheetNo. 17and vol II for technical specification or further details.)
75Schedule A7 -Functional House Tap Connection :-Providing and fixing function House Tap connection (FHTC) NosHouse Hold complete in all respect (Refer Vol-III-data sheetNo. 18and vol II for technical specification or further details.)
76Providing and installation of house connections with 15 mm dia GI pipe, 30 Rmtr.(Light class) i/c 80 mm nipple of 15mm dia, GI socket, GI Union , GI elbow and 1/4" ferrule connection .
77Providing and fixing of Domestic type water meters from 15 mm sizes shall bemagnetically coupled, multijet, inferential type, dry dial, IP68 class protection, Class-B water meters (screwed ends) manufactured in accordance with ISO: 4064 standards & have ISI/EEC / MID pattern approvals & shall bear ISI/EEC / MID marking on meter dial for each size with nut and nipple set.
78Schedule B1- Operation and Maintenance :- Operation & maintenanceofentire scheme from Intake point to tail end ( Consumer end) of the scheme in proper workingconditions Rising Mains,Gravity mainsand Distribution system, all structures,,Main Pump houses,,Under ground storage Reservoirs&Nos Over Head StorageReservoir including Yard light, at various sites complete in all respect in proper working condition for a period of 5 years starting after successful testing of scheme for 90 days . O&M includes provision of regular i.e. daily supplying of designed/required quantity of potable water having water quality as per CPHEEO manual of water supplyto the beneficiaries of the scheme upto main storage /delivery tankfrom above mentioned sources i.e. Intake&Storage tanks at different locations as per plan and repair & maintenance of Main lines, Gravity lines and entire distribution system along with maintenance of automised system of scheme. Regular maintenance of all the facilities including cleaning , washing, oiling and greasing repairs, replacement of worn out/damaged parts of pumping machinery, pipe line, valves and electrical, Mechanical equipments, regular cleaning of all structure like Storage tanks, collection/distribution chambers,pump houses etc and disposal of same as per the direction of Engineer-in-charge, fixing/repairing leakage incivil structures, channels, pipe lines, pumping machinery etc. proper disinfection of treated water and regular testing of water samples at required stages of treatment and lift, keeping regular and proper record of water quantity and quality, time and hour of runof pumping machinery, repair and maintenance of all works,removal of all kind of slips, slush, up rooting of unwanted grass, shrubs, weeds etc. growing near the structures and keeping the area neat and clean to the entire satisfaction of Engineer-in-Charge, planting and maintaining plants/flowers/trees around the pump house, WTP ,Main & Sector storage tanks / Intake etc. as per the entire satisfaction of Engineer-in-Charge including the cost of procurement of adequate and proper tools and plants, skilled and unskilled manpower, spare parts, oil/grease/lubricants, chemicals (Except bleaching powder) instruments, equipments, stationery and any other material etc. required for O&M excluding the cost of energy charges. All the operation shall be carried out as per the CPHEEO manual on water supply and treatment (latest addition) HP PWD/IPH specification,directions issued by Engineer-in-Charge from time to time and sound Engineering practice. The chlorine gas shall be provided by the contractor itself .(Refer Vol-III-data sheetNo. 19.0and vol II for technical specification or further details.)
791st year
802nd year
813rd year
824th year
835th year
84(Nalagarh Division) Schedule A1 - Civil Works :-Boundary Wallwork around all the civil works such as Pump Houses, SSFs as mentioned below by laying 1:5:10 ( 1 cement 5 sand and 10 stone aggregates 40mm nominal size) as a lean Conc. inPlinth and foundationand Providing CC 1:3:61 cement 3 sand 6 aggregates 20 mm uptoG.Land 15cm over G.Lthereafter construction of Brick masonary Pillar upto height of 3.0m around the civil structure @ 3.0m distance c/c and plastering on exposed portion ofCC 1:3:6 with cement mortar 1:3 (1 cement 3 sand ) and fixing of M.S grills of required size as approved by the competent authority in between the brick pillarincluding appliying primer and painting i to the entire satisfaction of the Engineer-in-charge.(Refer Vol-III-data sheetNo. 1.0and vol II for technical specification or further details.)
85Proposed Pump House near Proposed WTP Gamber
86Proposed Pump House near Proposed Sumpwell cum SR stage 2 of Rajwan
87Fencingwork around all the civil work such as MBRs, SRs etc 1.80 metre high fencing with 2.50 metre MS angle iron post with 300 mm girth (minimum) 2.50 metre centre to centre with nine horizontal lines and two diagonals of galvanised steel bare bed wire (IS:278-1962) type-I) wieghing 9.38kg per 100 metre (minimum) strainedand fixed to posts with GI staples including coal tarring including coal tarring of ballies complete fixed with cc 1:2:4 (45x45x45)in groundsize of MS angee post 1.80 m high will be ISA 50X50X5mmand fixed to post with proper fastening arrangement. The ISA post shall be embedded 450 mm deep in cc 1:2:4 with proper fastenging arrangement protected with using suitable primer and anti corrosive paint level difference at difference point shall be suitably taken care so as to look aesthetically good including cost of excavation foundation concrete and providing and fixing M.S gate of suitable size where required complete in all respect to the entire satisfaction of the Engineer-in-charge.. (Refer Vol-III-data sheetNo. 2.0and vol II for technical specification or further details.)
88Construction of Thrust , AnchorBlock, Thrust Block for Rising mains of requried sizes andin main conveyance . Firm has be evolve design and drawing as per actual site condition and got approved from competant authority(Refer Vol-III-data sheetNo. 3.0and vol II for technical specification or further details.)
89Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil includingbailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides,leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testingof pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoitedlayer by ramming & watering & then disposing of all surplus excavated soil /unusablematerial as directed with in all leads & lifts including restoration unmetalled surfaces to its original condition & including cost of diversionfor traffic, night signals, fixing caution boards, crossingover trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of engineer-in-charge.
90Providing and laying cement concrete 1:4:8 (1 cement:4sand:8 graded crushed stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts and to the enitre satisfaction of Engineer-in- charge.
91Providing and laying cement concrete 1:2:4 (1cement:2sand:4graded crushed stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced work in:- Foundation and plinth
92Providing form work with steel plates 3.15mm thick welded with angle ironframe 30x30x5mm so as to give a fair finish including centring,shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtr. and removal of the same for insitu -reinforced concrete and plain concrete work in :-Foundation and plinth
93Providing tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete including the cost of binding wire in all leads and lifts.
94Pump House:-Designing, Constructing, Testing & Commissioning of Pump House & Chowkidar Room at following Locations including all allied Civil Works, Electrical works, Sanitay work, Site development, cutting/excavation in all kinds of soils including construction ofPCC/RCC Retaining walls, Breast walls, Toilets, Septic Tanks, internal lighting of regular electricity and External Solar powered Street lighting, External landscaping, fire Fighting arrangement, dewatering etc complete job as directed by Engineer in charge The rates quoted by the contractor shall be for the complete work. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account(Refer Vol-III-data sheetNo. 4.0and vol II for technical specification or further details.)
95Proposed Pump House near Proposed WTP Gamber (120 sqm)
96Proposed Pump House near Proposed Sumpwell cum SR stage 2 of Rajwan (48 sqm)
97Designing, Constructing, Testing & Commissioning R.C.C. Circular underground/ partially under ground / Over head storage tanks as per capacity given below at various stages/sites including excavation in all kinds and types of strata, soil strata including dewatering in M30 design mix in foundation, walls, bottom slab , roof slab/dome with smooth finishing in 1:3 inside the tank, all alied Civil Works, Site development, cutting/excavation in all kinds of soils, C/o PCC/RCC Retaining walls, Breast walls,refilling and disposing of surplus stuff with in all leads and lifts, labour and material charges. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe proper manifiold at outlet including all fittings, bye pass arrangement consisting of GI / MS pipes special and valves of required classes and dia and all other accessories required such as Aluminium ladders inside and MS ladder outside,ventilator with mosquito proof wire mesh,lightening arrester complete ,MS manhole covers including frames and covers (heavy duty) with proper locking arrangement water level indicator, RCC frames for all valves ventilating shafts shall also be provided including all leads and lifts as per entire satisfaction of Engineer-in-Charge. The tanks shall be hydraulically tested for water tightness all works shall be conforming to relevant IS code.The cost of valves & other accessories shall be included in the rates of tanks .Battery Limit shall be considered as 3.00 m from the edge of the structure or the boundary of the land whichever is less.The rates quoted by the contractor shall be for the complete work i.e testing of bearing capacity at site . All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account.The work shall include supplying of Five sets of structural design after testing the bearing capcity of soil and drawings, etc complete as directed by Engineer in charge as per relevent data sheet and scope of work. (Refer Vol-III-data sheetNo. 5.0and vol II for technical specification or further details.)
98MST Okhoo
99MST Nand Top
100SR RAJWAN
101SR RANDHIA
102SR KAPHOLI
103SR OKHU
104SR KASLA
105SR PANJHELI
106SR BHINI JOHRI
107SR KHARPANA
108SR NIYAR
109SR NARLA
110SR KANGAR DEVI SCHOOL
111SR MALOG
112SR PATTA
113SR DOLRU
114SR DOLI NEW
115SR PULADI
116WATER TREATMENT PLANT: Designing (aesthetically), Providing, Constructing, Testing & Commissioning of Water Treatment Plant of 1.1 MLD Capacity ,consisting of Civil works including , Mechnical, Electrical and Instrumental Works including necessary hydraulic testing ,structural testing,equipment testing and plant building to hose Labortary and chemical room etc. . The Laboratory as per CPHEEO Manual shall be established at the WTP where separate Building for the same shall be constructed to house the laboratory equipment, office record including Furniture, office Computer complete in all respects. Battery Limit shall be considered as 3.00 m from the edge of the structure or the boundary of the land whichever is less.The rates quoted by the contractor shall be for the complete work. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account.(Refer Vol-III-data sheetNo. 6.0and vol II for technical specification or further details.)
117Survey ,Designing, Constructing, Testing & Commissioning(to be approved by the competent authority) ofRCC framed intake Structure at Gamber khad location including all allied Civil Works, excavation work in foundation in all kinds of soils i/c dewatering etc internallighting with regular supply and external solar powered street lighting, landscaping at intake point as per site requirement including providing and fixing of chain pulley/ gantry withMS rail along longitudinal wall of approved ISI make electrically operated alongwith all allied accessories , all kind of protection work required at site and painting with asian apex ultima with priming coat and wall putty full finished and fire fighting system complete icluding M.S side railing RCC STAIR etc. & site development as directed by engineer in charge. (Refer Vol-III-data sheetNo. 7.0and vol II for technical specification or further details.)
118Proposed Intake Structure at Gamber khad
119Check Dam(Refer Vol-III-data sheetNo. 8.0 and vol II for technical specification or further details.)
120R.C.C Proposed Check Dam at Haton Nallah (length - 6 m)and height =2.0 mtr.
121Schedule A2- Pumping Machinery and Electrical works:-PUMPING MACHINERY: Supply, Installation, Testing & Commissioning with automation (to be paid separetely) of Raw water submersible energy efficentpumpset of KSB make, Model-BPN394/ 1stage for the folowing duty conditions, as per BIS 1520-1980 with upto date ammendments capable of handling 4000 PPM turbidity conforming to latest BIS code. The pump shall be fitted with single vane impeller of suitable alloy for handling raw water as per IS 5669-1970 having oil/grease packed bearings and stainless steel shaft, wound stator on motor side with shaft protection sleeves on pump side ensuring better life for shaft . The impeller of pump shall be directly mounted on extended submersible motor confirming to BIS 9238-1979 with up to date amendments,totally dust and weather proof with detach able pump casing for easy inspection with double mechanical seal, grease/ oil lubricated bearings and provided with stainless steel thrust bearing plate to withstand vertical loads with minimum wear and tear,It should be fitted with device to take up expanion of water on heating of motor & suitable for operation on 415 (+10% ) and ( -15% ) volts 3 Phase 50 C/S AC supply. The power of motor should be at least 10% in excess of maximum power required by the pump in complete operating range with mounting stand/ duck foot bend, steel guide wire with mounting hook, lowering chain and standard accessories as supplied by the manufacturers complete, suitable for fulfilling the following requirements:-including Pump sets (working + standby), necessary piping, Control panel with starter andprotections;control valves alongwith electrical cable etc Complete job as per IPH specifications including all taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores/ site, stacking, etc.including specials and wastage etc.; complete as per Tender Specifications, technical data Sheets and instruction of Engineer in charge.If there any variation in HP of pumping machinery due to variation of head after re-survey and design approval by the department then the rates shall be paid on prorata basis after approval of the competant authority and will be paid accordingly.) Bidder to offer single or combination of pump to meat out the above requirement with 100 % stand byarrangement (Refer Vol-III-data sheetNo. 9.0 and vol II for technical specification or further details.)
122Raw water stage :-Discharge 14.24 LPS with 26 M Head (single or combination of pump to meet out the above requirement with 100% standbyarrangement )
123Supply Installation, Testing & Commissioning with automation (To be paid separately) of horizontal spindle,horizontal/redial split casing/end suction(Back-pull out arrangements) single/double/multi stageenergy efficient Centrifugal Clear water Pumpor combination of pumps, ofKSB Make for the following duty conditions, as per BIS 1520-1980 with upto date ammendments,read with IS:9137-1978 or latest edition suitable for lifting water for under mentioned characterestics with bronze,impellers/priming funnels,casing ring and shaft sleeves of bronze,shaft of steel grade45C8/ EN8 with cast iron casing coupled directly through a flexible coupling on a common MS Base Plate to squirrel cage TEFC Energy efficient motors (Conforming to energy efficiency code IE2 or higher ) of standard make such as Kirloskar /BHEL /CG POWER /Siemens /Jyoti /ABB /Marathon and suitable for operation on 415 (+10% ) and ( -15% ) volts, 50 cycles / second, 3 phase AC electric supply. The power of electric motor/motors should be at +10% in excess of the maximum power required by the pump/pumps in the operation range of (+) 10% and (-)15%of the duty poiint head. The motor/motors as per ISI:325:1978 with upto date ammendments read with IS 900:1972. It should include cost of bearing nuts , bolts and painting etc. and should meet the following requirements:including Pump sets (working + standby ), necessary piping for suction, delivery & common header,alongwith electrical control panel with soft starters;as per requirement of pumping machinery; Complete workinclusive of all taxes,transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores / site, stacking, etc.including specials and wastage etc. It shall include providing and fixing of C.I/C.S Sluice valves of approved make and appropriate class to resist the design pressure andcomplete as per Tender Specifications and instruction of Engineer in charge. If there any variation in HP of pumping machinery due to variation of head after re-survey and design approval by the department then the rates shall be paid on prorata basis after approval of the competant authority and will be paid accordingly. Bidder to offer single or combination of pump to meat out the above requirement with 100 % stand byarrangement (Refer Vol-III-data sheetNo. 10.0 and vol II for technical specification or further details.)
124Discharge :-14.24 LPS with 505.19 M Head(single or combination of pump to meet out the above requirement with 100% standbyarrangement )
125Discharge :-12.08 LPS with 460.99 M Head (single or combination of pump to meet out the above requirement with 100% standbyarrangement )
126Discharge :-2.15 LPS with 145.29 M Head (single or combination of pump to meet out the above requirement with 100% standbyarrangement )
127Schedule A3- Rising Main:-Excavation in foundations and trenches (for pipes and pits) upto all depths etc. in all kinds of soil such as pick work, jumper work and saturated soil including bailing or pumping out of water, blastingin soft/hard rock or chiseling or wedging out of same where blasting is prohibited in all leads and lifts includingtrimming and dressing of sides, leveling of beds to correct grade including shoring strutting, plankingtimbering and dewatering wherever required, stacking usable and unusable material/soil separately andafter laying jointing and testing of pipes, returning he usable soil in 15 cmlayer by ramming andwatering and then disposing of all surplus excavated soil/unusable material as directed within all leads and lifts including restoration of unmetaled/ mattelledsurfaces to its original condition and including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per the direction of Engineer-in-charge.
128Providing, laying,jointing and testing in trenches of Galvanized MSERW / GMS flanged/butt welded pipes including cost of flanged bends of all degrees conforming to IS/ISO:3183-2007 with steel grade L-360 or X-52API -5Lhaving wall thickness as specified below with plain end and capable of withstanding required test pressure in random length of 4 to 7 meters, including specials, short pieces, bends, reducers, tees etc. made from parent tube.The M.S. flanges are to be provided 1% of total joints and remaining 99% joints with butt welded joints as detailedbelow. The MS flanges shall confirm to BIS 6392-1971 (with latest up to date amendments) duly welded in four layers (two inner and two outer) with pipes at both ends as per relevant BIS standards along with nuts and bolts of required sizes confirming to BIS 1364 (with upto date ammendments). 3mm thick compressed asbestos fiber/synthetic rubber gaskets confirming to relevant BIS standards. The laying of pipe shall include all operation such as cutting, welding, jointing, providing & fixing of MS flanges, fabrication of bends, tees,valves etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The pipes shall be factory galvanized (zinc coating both inside and outside) as per IS:4736 -1986 (with upto date ammendments) with mass of zink coating as per relevant IS code. The welding electrodes shall be as per IS 814:2004 of Advani Oerlikon/ L&TThe work shall be done as per entiresatisfaction of engineer- enchagre within all leads and liftsThe rates also include entire charrige of matrial ,flushing ,cleaning and hydrolic testing complete to the best satisfaction and direction of engineer- charge within all lead and lifts ( Earth work in trenches and flange joints will be measured and paid for seperatly. The dia and class /material of pipe are indicative. since the re survey and re design of proposal /sechme is to be carried out by the lowest bidder, the design /drawings are to be approved by the competent authority of the department. if there is any variation in size ,material , class and wall thickness of pipe and jointing , valves ,specials etc the rate shall be workout or prorata basis and will be paid accordinglythe tolerence in pipe shall be accepted as per relevent ISI /BSI Code ( with upto date ammendments) (Refer Vol-III-data sheetNo. 11.0 and vol II for technical specification or further details.)
129stage:-1:- Providing and laying 150 mm dia API -5L Grade -X-52pipe4.8 mm wall thickness in Rising Main from from RD 0 TO 1500
130Stage-II: Providing and laying 150 mm diaAPI-5L Grade X-52 pipe 4.8mm wall thickness in Rising Mainfrom RD0 TO 1200
131Providing, laying,jointing and testing in trenches of Galvanized GMS pipes by circumferential butt welded pipes with 1% flanges joint in between ( cost of 1% flange joint to be measuredpaidfor seperately ) including cost of bends of all degrees conforming to IS : 1239 -1990 ( PART 2) Having wall thickness as specified below with plain and capable of withstanding required test pressure in random length of 4-7m including special ,short pieces bends , reducer ,tees etc made from parent tube , the MS flanges are to be provided 1% of Total joints and remaining 99% joints with Butt welded as detailed below . The laying of pipe shall including all operation such as cutting, welding , jointing, providing and fixing of MS flanges, fabrication of bend, Tees, valve etc icluding lowering and laying in excavated trenches to ensure Require level including flushing, cleaning and hydrolical testing complete in all respects to the satisfaction of the engineer encharge. the fabricated bends shall have 3or 4 cutts having its radius not less then five time the dia of pipe . The pipe shall be factory galvanised ( Zinc coating both inside and outside ) as per IS 4736-1986 ( With upto ammendments) with mass of Zinc Coating will be as per relevant IS code. The welding electrode shall be as IS 814:2004 of Advani ,Oerlikol/L&T or ISI marked make .The work shall be Done as per1% of total joints and remaining 99% joints with butt welded joints as detailedbelow. The MS flanges shall confirm to BIS 6392-1971 (with latest up to date amendments) duly welded in three layers (one inner and two outer) with pipes at both ends as per relevant BIS standards along with nuts and bolts of required sizes confirming to BIS 1364 (with upto date ammendments). 3mm thick compressed asbestos fiber/synthetic rubber gaskets confirming to relevant BIS standards. The laying of pipe shall include all operation such as cutting, welding, jointing, providing & fixing of MS flanges, fabrication of bends, tees,valves etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The pipes shall be factory galvanized (zinc coating both inside and outside) as per IS:4736 -1986 (with upto date ammendments) with mass of zink coating not less than 360 gm/m2. The welding electrodes shall be as per IS 814:2004 of Advani Oerlikon/ L&T or ISI marked make.tolerance in thickness and mass/weight will be as per relevant IS codes .Welding and fixing ofM.S. flanges @ 1% of joints, conforming to following tables as per IS 6392-1971 (Latest with up to date amendments) . The welding of flanges should conform to IS 816-1969 with electrodes as per IS: 814-1991 and required number of nuts and bolts conforming to IS 1364, the thicthness of gasket not less than 3.00 mm conforming to IS 2712-1998. The work shall be done as per entire satisfactio of Engineer- in- charge with in all leads and lifts.The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches, flanged joints . The diameter and class / material of pipe are indicative. Since the re-survey and re-design of proposal / scheme is to be carried out by the lowest bidder, the design/drawings are to be approved by the competent(Refer Vol-III-data sheetNo. 11.0 and vol II for technical specification or further details.)
132Booster Stage :- 150 mm dia GIMedium Gradepipe fromRD 0 to 100
133Stage -I:- 150 mm dia GI Medium Grade pipe from RD 1500 to 2700
134Stage -II:- 150 mm dia GI Medium Grade pipe from RD 1200 to 2100
135Stage -III:- 65 mm dia GI Medium Grade pipe from RD 0 to 1500
136Providing and welding M.S. flanges at suitable point, conforming to following tables as per IS 6392-1971 (Latest with up to date amendments) as per IS:6392-1971 (Latest with upto date amendments) and welding of MS Flanges with G.I. Pipes/ MSERW pipes in two layers on both faces to make the joint leak proofin betweenlength of butt welded (The cost of providing and laying of G.I.Pipes/MSERW Pipes to be measured and paid for separately). The welding of flanges should conform to IS 816-1969 with electrode as per IS : 814-1991 and required number of nuts & bolts conforming to IS: 1364.The thickness of gasket not less than 3.00mm conforming to IS : 2712-1998.The work shall be done as per entire satisfaction of Engineer-in-Charge within all leads and lifts. (Refer Vol-III-data sheetNo. 11.0 and vol II for technical specification or further details.)
137Booster stage: Providing and laying 150 mm dia Grade GI-M pipe from RD-0 to 100 Flange Table-5
138Stage-I:- Providing and laying MSERWPipe of150 mm dia Grade X-52 pipe from RD-0 to 1500 Flange Table-28
139Stage-I:- Providing and laying 150 mm dia Grade GI-M pipe from RD-1500 to 2100 Flange Table-17
140Stage-I:- Providing and laying 150 mm dia GI- M pipe from RD-2100 to 2700 Flange Table-5
141Stage-II:- Providing and laying MSERWPipe of150 mm dia Grade X-52 pipe from RD-0 to 900 Flange Table-28
142Stage-II:- Providing and laying MSERWPipe of 150 mm dia Grade X-52 pipe from RD-900 to 1200 Flange Table-17
143Stage-II:- Providing and laying 150 mm dia GI- M pipe from RD-1200 to 1500 Flange Table-17
144Stage-II:- Providing and laying 150 mm dia GI- M pipe from RD-1500 to 2100 Flange Table-5
145Stage-III:- Providing and laying 65 mm dia GI- M pipe from RD-0 to 600 Flange Table-17
146Stage-III:- Providing and laying 65 mm dia GI- M pipe from RD-600 to 1500 Flange Table-5
147Providing and fixing double flanged cast steel reflux valve of following dia of Kirloskar/Leader make conforming to BS:1868 of various Class including campanionsheet gasket 3 mm thick with MS flanges of table-28 as per IS 6392-1971 i/c welding ofM.S. flanges in two layers on both faces to make the joint leak proof and capable of withstanding of nominal seat pressure of 104.00/52.00/21.00 Kg/cm2 with upto dateamendments i/c carriage in all leads & lifts & complete in all respect a as per directionand to the entire satisfaction of Engineer-in-Charge.(Refer Vol-III-data sheetNo. 11.0 and vol II for technical specification or further details.)
1481st Stage 150 mm dia ASA-300 Flange Table 28
1491st Stage 150 mm dia ASA-150 Flange Table17
1502nd Stage 150 mm dia ASA-300 Flange Table 28
1512nd Stage 150 mm dia ASA-150 Flange Table 17
1523rd Stage 65 mm dia ASA-150 Flange Table 17
153Providing and fixing double flanged sluice valve of following dia of Kirloskar/Leadermake conforming to BS:1868 of various Class including campanion sheet gasket 3mm thick with MS flanges of table-17 as per IS 6392-1971 i/c welding of M.S. flangesin two layers on both faces to make the joint leak proof and capable of with standing ofnominal seat pressure of 104.00/52.00/21.00 Kg/cm2 with upto date amendments i/ccarriage in all leads & lifts & complete in all respect a as per direction and to the entiresatisfaction of Engineer-in-Charge. (Refer Vol-III-data sheetNo. 11.0 and vol II for technical specification or further details.)
1541st Stage 150 mm dia ASA-300 Flange Table 28
1551st Stage 150 mm dia ASA-150 Flange Table17
1562nd Stage 150 mm dia ASA-300 Flange Table 28
1572nd Stage 150 mm dia ASA-150 Flange Table 17
1583rd Stage 65 mm dia ASA-150 Flange Table 17
159Providing and fixing double flanged Cast iron air release valve of following dia of Leader/Kirloskar make conforming to IS: 14845/2000 with up to date amendment asper Class ASA -150 to withstand in normal seat pressure of 21.00 Kg/cm2 includingchampion sheet gasket 3 mm thick, including carriage in all leads and lifts as perdirection and to the entire satisfaction of Engineer-in-Charge.(Refer Vol-III-data sheetNo. 11.0 and vol II for technical specification or further details.)
1601st Stage 32 mm dia ASA 150
1612nd Stage 32mm dia ASA 150
1623nd Stage 25 mm dia ASA 150
163Schedule A4- Gravity Main & Distribution System:-Excavation in foundations and trenches (for pipes and pits) upto all depths etc. in all kinds of soil such as pick work, jumper work and saturated soil including bailing or pumping out of water, blastingin soft/hard rock or chiselling or wedging out of same where blasting is prohibited in all leads and lifts includingtrimming and dressing of sides, levelling of beds to correct grade including shoring strutting, plankingtimbering and dewatering wherever required, stacking usable and unusable material/soil separately andafter laying jointing and testing of pipes, returning he usable soil in 15 cmlayer by ramming andwatering and then disposing of all surplus excavated soil/unusable material as directed within all leads and lifts including restoration of unmetalled/ mattelledsurfaces to its original condition and including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per the direction of Engineer-in-charge.
164Providing, laying, jointing, testing and commissioning in trenches galvanised mild tube of following dia (medium grade) including providing and fixing tube fitting such as reducer increases, socket, union, tees, bends etc. where ever required (earth work in treanches tobe measured and paid saparately) and as per the direction of Engineer-in-charge including entire carriage of material upto loads and lifts (Refer Vol-III-data sheetNo. 12.0 and vol II for technical specification or further details.)(Gravity main)
16540 mm Dia GMS Pipe Medium class
16650 mm Dia GMS Pipe Medium class
16765 mm Dia GMS Pipe Medium class
168Proividng, laying, jointing and testing in trenches centrifugal castductile iron (spun) pressure pipes confirming to IS 8329/2000 class K-7 duly ISI marked, with push on joints suitable for water supply lines,including cutting og pipes, chamfering where required (earthwork intrenched and jointing of pipes to be measured and laid seperately) including carriage upto the site of the work, testing etc.,complete asper instructions of the Engineer-in-charge.(Refer Vol-III-data sheetNo. 12.0 and vol II for technical specification or further details.)(Gravity main)
16980 mm Dia DI Pipe (K-7)Medium class
170100 mm Dia DI Pipe (K-7) Medium class
171Providing laying and jointing of GI Pipes including all kind of fitting require for jointing ofscrewed and socketed pipe into trenches earth work to measured and paid for separately (Refer Vol-III-data sheetNo. 13.0 and vol II for technical specification or further details.) (Distributionsystem)
17232 mm diaGI Medium class asper IS 1239
17340 mm diaGI Medium class asper IS 1239
17450mm dia GI Medium class asper IS 1239
17565mm dia GI Medium class asper IS 1239
176Providing and fixing double flanged cast iron Sluice valve of following dia of Kirloskar/Leader make conforming to BS:1414 / API-600 variousClass including campanion sheet gasket 3 mm thick with MS flanges of table-5as per IS 6392-1971 i/c welding of M.S. flanges in two layers on both faces to make the joint leak proof and capable of with standing of nominal seat pressureof 10.20 kg/cm2 with upto date amendments i/c carriage in all leads & lifts &complete in all respect a as per direction and to the entire satisfaction of Engineer-in-Charge (Refer Vol-III-data sheetNo. 12.0 and vol II for technical specification or further details.)
17740 mm dia PN-1.0
17850 mm dia PN-1.0
17965 mm dia PN-1.0
18080 mm dia PN-1.0
181100 mm dia PN-1.0
182Providing and fixing double air valve (Isolating type) Double orifice withrubber ball 50 mm dia dia of Leader/Kirloskar make confirming to BIS:14845and capable of with standing of nominal seat pressure of 21.00 kg/cm2 with upto date amendments in rising mains with upto date amendments as per direction and to the entire satisfaction of Engineer-in-Charge.(Refer Vol-III-data sheetNo. 12.0 and vol II for technical specification or further details.)
18340 mm dia
18450 mm dia
18565 mm dia
18680 mm dia
187100 mm dia
188Schedule A5- Automation:- AUTOMATION: The tendered / firm shall provide proposals for automation (Wired/Non wired) to automize the entire scheme i.efrom intake pointup to MBR. Provision of automation shall be with main SCADA and control station at treatment plant atWater treatment plant. GSM based devices shall be installed at each MBR of every stage in both phaseswhich shall send messages through WEB SCADA stations at two offices and five Mobile Numbers. This data transmission system at each tank of pump station consists of field instruments for providing digital and analog signals to data transfer module. This module will have a communication to web data transfer system module communication. The PLC station will have control station with programmable graphic process, mimics, real time and historical trending face plate and group display, alarm management and report with Laser Jet printers and required furniture. Installation of hardware along with commissioning/ programming as per user requirement shall be done.The firm / contractor will provide the Bulk metering at Water Treatment Plants. The automation of the entire scheme upto Sector storage tank shall also include the followings : (a) At intake point : Provision shall be kept for automatic flow measurement and flow control with quality measurement turbidityin (b) Water Treatment Plant.Fully automatized operation including alum dosing and back washing and chlorinationfrom inlet to out let along with automatic sensor for Turbidity, pHand Residual chlorine) (c) Storage Water Tanks at lifting station:-Automatic Inlet and Out Let through single out flow pipe (common header), Low and high level sensoralong with all required accessories. It should also include telecommunication comprising of required numbers of connections as per actual requirement at site. The automation system installed at above/aforesaid locations should be theft proof and proper ventilation arrangements be made complete in all respect to the entire satisfaction of Engineer-in Charge.The firm/contactor shall submit complete proposal for automation and got approved from competent authority, along with presentation .Firm/Cont. has to incorperate all the inputs and outputs suggested by the Deptt. in the SCADA system to automized the entired scheme from intake point to all sector storage tanks as per relevant(Refer Vol-III-data sheetNo. 14.0and vol II for technical specification or further details.)
189Schedule A6- Disinfection System:-Supply, installation commissioning and testing of Gaseous Chlorination Plant at MSB .Vacuum operated pressure feed gaseous chlorinator of Chloromax / Capco/ Capital makes for Chlorination of water by direct feeding to water main consisting of the such as :-i ) Chlorinator capable to deliver 0-1000 gm/hr of chlorine gas comprising of spring opposed inlet valve, rate valve, flow meter remote ejector assembly with built in check valve, vacuum tubing , vent tubing and injection assembly .II)Booster pump set Set of 2 No. :1W+ 1SB with electric motor of make CROMPTON/KIRLOSKAR/ABB operated on 400/440 volt, 3 phase 50hz electric supply to suit ejector assembly of chlorinator, mounted on common base frame . III) Water piping from water main/UGR Set of 2 No. :1W+ 1SB to booster pump and delivery of water to elector through 20mm CPVC pipe complete with all fitting such as 20mm inlet gate valve, 20mm delivery valve, Y type strainer and solution delivery piping 20mm heavy duty PVC plumbing pipe sch 80 upto injection point before ejector assy/piping upto delivery mains. Total piping not exceeding 24 mtrs. IV) Accessories/spares: Multi purpose cylinder Key-1 No. lead washers -6 Nos Ejector gasket-2 sets. Hose clips- 4 Nos. Ammonia Bottle – 50ml -1 No. V) Chlorine Cylinders: Chlorine gas Cylinder 100kg ., capacity as per BIS Duly certified by CCE Nagpur and filled with Chlorine gas. VI) Chlorine Leak Detector with sensor and alarm,Electric Panel for booster pumps & leak detector. (Refer Vol-III-data sheetNo. 15.0and vol II for technical specification or further details.)
190Schedule A7 -Functional House Tap Connection:- Providing and fixing function House Tap connection (FHTC) to 548NosHouse Hold complete in all respect(Refer Vol-III-data sheetNo. 16.0and vol II for technical specification or further details.)
191Providing and installation of house connections with 15 mm dia GI pipe, 30 Rmtr.(Light class) i/c 80 mm nipple of 15mm dia, GI socket, GI Union , GI elbow and 1/4" ferrule connection as per the direction of Engineer-in-charge including entire carriage of material upto all leads and lifts
192Providing and fixing of Domestic type water meters from 15 mmsizes shall bemagnetically coupled, multijet, inferential type, dry dial, IP68 class protection, Class-B water meters (screwed ends) manufactured in accordance with ISO: 4064 standards & have ISI/EEC / MID pattern approvals & shall bear ISI/EEC / MID marking on meter dial for each size with nut and nipple set as per the direction of Engineer-in-charge including entire carriage of material upto all leads and lifts
193Schedule B1- Operation and Maintenance:-Operation & maintenanceofentire scheme from Intake point to tail end ( consumer end )of the scheme in proper workingconditions Rising Mains,Gravity mainsand Distribution system, all structures,,Main Pump houses,,Under ground storage Reservoirs&Nos Over Head StorageReservoir including Yard light, at various sites complete in all respect in proper working condition for a period of 5 years starting after successful testing of scheme for 90 days . O&M includes provision of regular i.e. daily supplying of designed/required quantity of potable water having water quality as per CPHEEO manual of water supplyto the beneficiaries of the scheme upto main storage /delivery tankfrom above mentioned sources i.e. Intake&Storage tanks at different locations as per plan and repair & maintenance of Main lines, Gravity lines and entire distribution system along with maintenance of automised system of scheme. Regular maintenance of all the facilities including cleaning , washing, oiling and greasing repairs, replacement of worn out/damaged parts of pumping machinery, pipe line, valves and electrical, Mechanical equipments, regular cleaning of all structure like Storage tanks, collection/distribution chambers,pump houses etc and disposal of same as per the direction of Engineer-in-charge, fixing/repairing leakage incivil structures, channels, pipe lines, pumping machinery etc. proper disinfection of treated water and regular testing of water samples at required stages of treatment and lift, keeping regular and proper record of water quantity and quality, time and hour of runof pumping machinery, repair and maintenance of all works,removal of all kind of slips, slush, up rooting of unwanted grass, shrubs, weeds etc. growing near the structures and keeping the area neat and clean to the entire satisfaction of Engineer-in-Charge, planting and maintaining plants/flowers/trees around the pump house, WTP ,Main & Sector storage tanks / Intake etc. as per the entire satisfaction of Engineer-in-Charge including the cost of procurement of adequate and proper tools and plants, skilled and unskilled manpower, spare parts, oil/grease/lubricants, chemicals (Except bleaching powder) instruments, equipments, stationery and any other material etc. required for O&M excluding the cost of energy charges. All the operation shall be carried out as per the CPHEEO manual on water supply and treatment (latest addition) HP PWD/IPH specification,directions issued by Engineer-in-Charge from time to time and sound Engineering practice. The chlorine gas shall be provided by the contractor itself (Refer Vol-III-data sheetNo. 17.0and vol II for technical specification or further details.)
1941st year
1952nd year
1963rd year
1974th year
1985th year
199(Arki Division) Schedule A1 - Civil Works:-Boundary Wallwork around all the civil works such as Pump Houses, SSFs as mentioned below by laying 1:5:10( 1 cement 5 sand and 10 stone aggregates 40mm nominal size) as a lean Conc. inPlinth and foundationand Providing CC 1:3:61 cement 3 sand 6 aggregates 20 mm uptoG.Land 15cm over G.Lthereafter construction of Brick masonary Pillar upto height of 3.0m around the civil structure @ 3.0m distance c/c and plastering on exposed portion ofCC 1:3:6 with cement mortar 1:3 (1 cement 3 sand ) and fixing of M.S grills of required size as approved by the competent authority in between the brick pillarincluding appliying primer and painting i to the entire satisfaction of the Engineer-in-charge. (Refer Vol-III-data sheetNo. 1.0and vol II for technical specification or further details.)
200Proposed Pump House at First Stage ,second stage of phase-1 and Phase-2
201Proposed Pump House at secondStage ,of phase-1 and Phase-1
202Fencingwork around all the civil work such as MBRs, SRs etc 1.80 metre high fencing with 2.50 metre MS angle iron post with 300 mm girth (minimum) 2.50 metre centre to centre with nine horizontal lines and two diagonals of galvanised steel bare bed wire (IS:278-1962) type-I) wieghing 9.38kg per 100 metre (minimum) strainedand fixed to posts with GI staples including coal tarring including coal tarring of ballies complete fixed with cc 1:2:4 (45x45x45)in groundsize of MS angee post 1.80 m high will be ISA 50X50X5mmand fixed to post with proper fastening arrangement. The ISA post shall be embedded 450 mm deep in cc 1:2:4 with proper fastenging arrangement protected with using suitable primer and anti corrosive paint level difference at difference point shall be suitably taken care so as to look aesthetically good including cost of excavation foundation concrete and providing and fixing M.S gate of suitable size where required complete in all respect to the entire satisfaction of the Engineer-in-charge. (Refer Vol-III-data sheetNo. 2.0and vol II for technical specification or further details.)
203Site development for various civil works such as intake structure, pump houses, Main balancing reserviors,Service storage reservior,retaining walls,breast walletc complete as directed by engineer in charge as per relevent data sheet and scope of work. (Refer Vol-III-data sheetNo. 3.0and vol II for technical specification or further details.)
204Cutting in earth work and disposal of excavation earth in all leads and lifts in all kind of soil
205Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable materail.
206Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specifications cement concrete 1:5:10 (1 cement : 5 sand : 10 graded stone aggregaates 40 mm nominal size).
207Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specificationscement concrete 1:4:8 (1 cement : 4 sand : 8 graded stone aggregaates 40 mm nominal size).
208Back filling behind retaining wall/breast wall
209Providing weepholes in brick masonary/stone masonary, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1V:20H towards drawing face complete as per drawing and technical specification.
210Prov.form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm,so as to give a fair finish i/c centring shuttering,strutting & propping etc. with wooden battens & ballies,ht. of propping & centring below supporting floor to ceiling not exceeding 4.00 mts. & removal of the same for in situ-reinforced concrete & plain concrete work :-Vertical surfaces such as wall (any thick.) partitions & the like i/c attached pillasters,buttresses,plinth & string courses & the like.
211Construction of Thrust , AnchorBlock, Thrust Block for Rising mains of requried sizes andin main conveyance . Firm has be evolve design and drawing as per actual site condition and got approved from competant authority (Refer Vol-III-data sheetNo. 4.0and vol II for technical specification or further details.)
212Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil includingbailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides,leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testingof pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoitedlayer by ramming & watering & then disposing of all surplus excavated soil /unusablematerial as directed with in all leads & lifts including restoration unmetalled surfaces to its original condition & including cost of diversionfor traffic, night signals, fixing caution boards, crossingover trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of engineer-in-charge.
213Providing & laying cement concrete using M-15 concrete mix with graded stone aggregate 20 mm nominal size) excluding the cost of centring & shuttering in Foundation & plinth.
214Providing & laying cement concrete using M-20 graded stone aggregate 20 mm nominal size & curing complete excluding the cost of form work & reinforcement for RCC work in :- Foundation
215Providing & laying cement concrete using M-20 graded stone aggregate 20 mm nominal size & curing complete excluding the cost of form work & reinforcement for RCC work in :- Column
216Providing form work with steel plates 3.15mm thick welded with angle ironframe 30x30x5mm so as to give a fair finish including centring,shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtr. and removal of the same for insitu -reinforced concrete and plain concrete work in :
217Foundation and plinth
218Column
219Providing tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete including the cost of binding wire in all leads and lifts.
220Pump House:-Designing, Constructing, Testing & Commissioning of Pump House & Chowkidar Room at following Locations including all allied Civil Works, Electrical works, Sanitay work, Site development, cutting/excavation in all kinds of soils including construction ofPCC/RCC Retaining walls, Breast walls, Toilets, Septic Tanks, internal lighting of regular electricity and External Solar powered Street lighting, External landscaping, fire Fighting arrangement, dewatering etc complete job as directed by Engineer in charge The rates quoted by the contractor shall be for the complete work. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account.(Refer Vol-III-data sheetNo. 5.0and vol II for technical specification or further details.)
221Proposed Pump House at First Stage ,second stage of phase-1 and Phase-2
222Proposed Pump House at secondStage ,of phase-1 and Phase-1
223Designing, Constructing, Testing & Commissioning R.C.C. Circular underground/ partially under ground / Over head storage tanks as per capacity given below at various stages/sites including excavation in all kinds and types of strata, soil strata including dewatering in M30 design mix in foundation, walls, bottom slab , roof slab/dome with smooth finishing in 1:3 inside the tank, all alied Civil Works, Site development, cutting/excavation in all kinds of soils, C/o PCC/RCC Retaining walls, Breast walls,refilling and disposing of surplus stuff with in all leads and lifts, labour and material charges. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe proper manifiold at outlet including all fittings, bye pass arrangement consisting of GI / MS pipes special and valves of required classes and dia and all other accessories required such as Aluminium ladders inside and MS ladder outside,ventilator with mosquito proof wire mesh,lightening arrester complete ,MS manhole covers including frames and covers (heavy duty) with proper locking arrangement water level indicator, RCC frames for all valves ventilating shafts shall also be provided including all leads and lifts as per entire satisfaction of Engineer-in-Charge. The tanks shall be hydraulically tested for water tightness all works shall be conforming to relevant IS code.The cost of valves & other accessories shall be included in the rates of tanks .Battery Limit shall be considered as 3.00 m from the edge of the structure or the boundary of the land whichever is less.The rates quoted by the contractor shall be for the complete work i.e testing of bearing capacity at site . All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account.The work shall include supplying of Five sets of structural design after testing the bearing capcity of soil and drawings, etc complete as directed by Engineer in charge as per relevent data sheet and scope of work.(Refer Vol-III-data sheetNo. 6.0 and vol II for technical specification or further details.)
224MST STAGE 1 PHASE 1
225MST STAGE 2 PHASE 1
226MST STAGE 1 PHASE 2
227MST STAGE 2 PHASE 2
228SST PHASE 2 STAGE 1
229SST METRECH
230SST SAMTIARI
231SST BOI
232SST SAKOR
233SST BERAL
234Sedimentation and slow sand filter :Providing, installation, testing and commissioning of 1units each of size 50.55 Sqm ofSlow sand filter including sedimentation tankwith baffle wallincluding cost of construction of civil works, hoisting and errection of all steel works, providing and installation of all mechanical/Electrical equipments/accessories, laying of all interconnecting with pipes and valve and scouring arrangements from all units with disposal of the same to the boundary of structures, all types of valves, fittings and all contingent works capable of taking input and giving output as laid down in chapter-I of CPHEEO manual under all climatic conditions specified therein.Providing and fixing of lighting arrangements complete in all respect. Providing and fixing all electrical/Mechanical equipments, proper walk way for Inspection/ operation of various units, Providing and setting up of all laboratory equipments etc as per CPHEEO manuals appendix 15.90 (category-II) of 1999 addition shall be provided . Sizes of various units shall be based on manual of water supply and treatment published by CPHEEO. The design of various units shall conform to relevant IS Codes and specifications. All the water retaining stuctuctures shall be designed and constructed in M-30 RCC.(Refer Vol-III-data sheetNo. 7.0and vol II for technical specification or further details.)
235Intake , Percolation well & Sump well Survey ,Designing, Constructing, Testing & Commissioning(to be approved by the competent authority) ofRCC framed Intake Structure,Percolation well, sump well including all allied Civil Works, excavation work in foundation in all kinds of soils i/c dewatering etc.internal lighting with regular electricity & external with solar powered Street lighting, landscaping at Intake point as persite requirement,alongwith MS rail along longitudinal wallalongwith all allied accessories and painting with asian apex ultima with priming coat and wall putty full finishedand fire fighting system complete andaccess up to pannel room includingM.Sside raillingRCC stairs etc. & site developmentas directed by Engineer in charge.The contractor shall provide 6 sets of approved drawing with design and one soft copy to the department
236Intake 2 x 2 x 1.5 m :-(Refer Vol-III-data sheetNo. 8.0and vol II for technical specification or further details.)
237Percolation well6.0m dia and 9.0 m deep :- (Refer Vol-III-data sheetNo. 9.0and vol II for technical specification or further details.)
238SUMP WELL:- Designing, Constructing, Testing & Commissioning Sump well as per capacity given below at various stages/sites including excavation in all kinds and types of strata, soil strata including dewatering in M30 design mix in foundation, walls, bottom slab with smooth finishing in 1:3 inside the tank, all alied Civil Works, Site development, cutting/excavation in all kinds of soils,refilling and disposing of surplus stuff with in all leads and lifts, labour and material charges. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe proper manifiold at outlet including all fittings, bye pass arrangement consisting of GI / MS pipes special and valves of required classes and dia and all other accessories required such as Aluminium ladders inside and MS ladder outside,ventilator with mosquito proof wire mesh,lightening arrester complete ,MS manhole covers including frames and covers (heavy duty) with proper locking arrangement water level indicator, RCC frames for all valves ventilating shafts shall also be provided including all leads and lifts as per entire satisfaction of Engineer-in-Charge. The tanks shall be hydraulically tested for water tightness all works shall be conforming to relevant IS code.The cost of valves & other accessories shall be included in the rates of tanks .Battery Limit shall be considered as 3.00 m from the edge of the structure or the boundary of the land whichever is less.The rates quoted by the contractor shall be for the complete work i.e testing of bearing capacity at site . All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account.The work shall include supplying of Five sets of structural design after testing the bearing capcity of soil and drawings, etc complete as directed by Engineer in charge as per relevent data sheet and scope of work. (Refer Vol-III-data sheetNo. 10.0and vol II for technical specification or further details.)
239SUMP WELLLift stage I at Phase 1 ( Capacity 75 K.L)
240SUMP WELL at Lift stage II of Phase 1( Capacity 30 K.L)
241SUMP WELL at Lift stage I&II of Phase 2( Capacity 20 K.L)
242Schedule A2- Pumping Machinery and Electrical works:-Providing horizontal spindle, horizontal/redial split casing/end suction(Back-pull out arrangements) single/double/multi stage star rated Reciprocating pumps,In series/parallel of recommended make such as Mather and Platt/KSB/ Beacon Weir/Kirloskar/BE/Jyoti as per BIS 1520-1980 with upto date amendments,read with IS:9137-1978 or latest edition suitable for lifting water for under mentioned characteristics with bronze, impellers/priming funnels, casing ring and shaft sleeves of bronze, shaft of steel grade4508 FN8 with cast iron casing coupled directly through a flexible coupling on a common MS/Cast steel base plate (base plate to be from the manufacturer of the pumping unit only) to slip ring/ squirrel cage screen protected drip proof induction motor /motors of standard make such as Kirloskar/BHEL /Crompton /NGEF /GEC/Siemens/Jyoti /ABB and suitable for operation on 400(+/-)10% volts,50 cycles /second.3 phase AC electric supply. The power of electric motor/motors should be at +10% in excess of the maximum power required by the pump/pumps in the operation range of (+) 10% and (-)15%of the duty point head. The motor/motors as per ISI:325:1978 with upto date amendments read with IS 900:1972. It should include cost of bearing nuts , bolts and painting etc. and should meet the following requirements Bidder to offer single or combination of pump to meat out the above requirement with 100 % stand byarrangement(Refer Vol-III-data sheetNo. 11.0and vol II for technical specification or further details.)
243Discharge :- 2.23 LPS with 677.894 M Head(single or combination of pump to meet out the above requirement with 100% standbyarrangement )
244Supply Installation, Testing & Commissioning with automation (To be paid separately) of horizontal spindle,horizontal/redial split casing/end suction(Back-pull out arrangements) single/double/multi stageenergy efficient Centrifugal Clear water Pumpor combination of pumps, ofKSB Make for the following duty conditions, as per BIS 1520-1980 with upto date ammendments,read with IS:9137-1978 or latest edition suitable for lifting water for under mentioned characterestics with bronze,impellers/priming funnels,casing ring and shaft sleeves of bronze,shaft of steel grade45C8/ EN8 with cast iron casing coupled directly through a flexible coupling on a common MS Base Plate to squirrel cage TEFC Energy efficient motors (Conforming to energy efficiency code IE2 or higher ) of standard make such as Kirloskar /BHEL /CG POWER /Siemens /Jyoti /ABB /Marathon and suitable for operation on 415 (+10% ) and ( -15% ) volts, 50 cycles / second, 3 phase AC electric supply. The power of electric motor/motors should be at +10% in excess of the maximum power required by the pump/pumps in the operation range of (+) 10% and (-)15%of the duty poiint head. The motor/motors as per ISI:325:1978 with upto date ammendments read with IS 900:1972. It should include cost of bearing nuts , bolts and painting etc. and should meet the following requirements:including Pump sets (working + standby ), necessary piping for suction, delivery & common header,alongwith electrical control panel with soft starters;as per requirement of pumping machinery; Complete workinclusive of all taxes,transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores / site, stacking, etc.including specials and wastage etc. It shall include providing and fixing of C.I/C.S Sluice valves of approved make and appropriate class to resist the design pressure andcomplete as per Tender Specifications and instruction of Engineer in charge. If there any variation in HP of pumping machinery due to variation of head after re-survey and design approval by the department then the rates shall be paid on prorata basis after approval of the competant authority and will be paid accordingly.) Bidder to offer single or combination of pump to meat out the above requirement with 100 % stand byarrangement (Refer Vol-III-data sheetNo. 12.0and vol II for technical specification or further details.)
245Discharge 17.72 LPS with 689.38 M Head(single or combination of pump to meet out the above requirement with 100% standbyarrangement )
246Discharge 7.04 LPS with 503.99 M Head(single or combination of pump to meet out the above requirement with 100% standbyarrangement )
247Discharge 2.15 LPS with 122.37 M Head (single or combination of pump to meet out the above requirement with 100% standbyarrangement )
248PUMPING MACHINERY: Supply, Installation, Testing & Commissioning with automation (to be paid separetely) ofRaw water submersible energy efficentpumpset of KSB make, Model-BPN394/ 1stage for the folowing duty conditions, as per BIS 1520-1980 with upto date ammendments capable of handling 3000 PPM turbidity conforming to latest BIS code. The pump shall be fitted with single vane impeller of suitable alloy for handling raw water as per IS 5669-1970 having oil/grease packed bearings and stainless steel shaft, wound stator on motor side with shaft protection sleeves on pump side ensuring better life for shaft . The impeller of pump shall be directly mounted on extended submersible motor confirming to BIS 9238-1979 with up to date amendments,totally dust and weather proof with detach able pump casing for easy inspection with double mechanical seal, grease/ oil lubricated bearings and provided with stainless steel thrust bearing plate to withstand vertical loads with minimum wear and tear,It should be fitted with device to take up expanion of water on heating of motor & suitable for operation on 415 (+10% ) and ( -15% ) volts 3 Phase 50 C/S AC supply. The power of motor should be at least 10% in excess of maximum power required by the pump in complete operating range with mounting stand/ duck foot bend, steel guide wire with mounting hook, lowering chain and standard accessories as supplied by the manufacturers complete, suitable for fulfilling the following requirements:-including Pump sets (working + standby), necessary piping, Control panel with starter andprotections;control valves alongwith electrical cable etc Complete job as per IPH specifications including all taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores/ site, stacking, etc.including specials and wastage etc.; complete as per Tender Specifications, technical data Sheets and instruction of Engineer in charge.If there any variation in HP of pumping machinery due to variation of head after re-survey and design approval by the department then the rates shall be paid on prorata basis after approval of the competant authority and will be paid accordingly.) Bidder to offer single or combination of pump to meat out the above requirement with 100 % stand byarrangement (Refer Vol-III-data sheetNo. 13.0and vol II for technical specification or further details.)
249Discharge:-8.86 LPS with 15.23 M Head(single or combination of pump to meet out the above requirement with 100% standbyarrangement )
250Discharge:- 8.86 LPS with 17.13 M Head (single or combination of pump to meet out the above requirement with 100% standbyarrangement )
251Schedule A3- Rising Main :-Excavation in foundations and trenches (for pipes and pits) upto all depths etc. in all kinds of soil such as pick work, jumper work and saturated soil including bailing or pumping out of water, blastingin soft/hard rock or chiseling or wedging out of same where blasting is prohibited in all leads and lifts includingtrimming and dressing of sides, leveling of beds to correct grade including shoring strutting, plankingtimbering and dewatering wherever required, stacking usable and unusable material/soil separately andafter laying jointing and testing of pipes, returning he usable soil in 15 cmlayer by ramming andwatering and then disposing of all surplus excavated soil/unusable material as directed within all leads and lifts including restoration of unmetaled/ mattelledsurfaces to its original condition and including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per the direction of Engineer-in-charge.
252Providing, laying,jointing and testing in trenches of Galvanized GMS pipes by circumferential butt welded pipes with 1% flanges joint in between ( cost of 1% flange joint to be measuredpaidfor seperately ) including cost of bends of all degrees conforming to IS : 1239 -1990 ( PART 2) Having wall thickness as specified below with plain and capable of withstanding required test pressure in random length of 4-7m including special ,short pieces bends , reducer ,tees etc made from parent tube , the MS flanges are to be provided 1% of Total joints and remaining 99% joints with Butt welded as detailed below . The laying of pipe shall including all operation such as cutting, welding , jointing, providing and fixing of MS flanges, fabrication of bend, Tees, valve etc icluding lowering and laying in excavated trenches to ensure Require level including flushing, cleaning and hydrolical testing complete in all respects to the satisfaction of the engineer encharge. the fabricated bends shall have 3or 4 cutts having its radius not less then five time the dia of pipe . The pipe shall be factory galvanised ( Zinc coating both inside and outside ) as per IS 4736-1986 ( With upto ammendments) with mass of Zinc Coating not less then 360 gram/sqm. The welding electrode shall be as IS 814:2004 of Advani ,Oerlikol/L&T or ISI marked make .The work shall be Done as per1% of total joints and remaining 99% joints with butt welded joints as detailedbelow. The MS flanges shall confirm to BIS 6392-1971 (with latest up to date amendments) duly welded in three layers (one inner and two outer) with pipes at both ends as per relevant BIS standards along with nuts and bolts of required sizes confirming to BIS 1364 (with upto date ammendments). 3mm thick compressed asbestos fiber/synthetic rubber gaskets confirming to relevant BIS standards. The laying of pipe shall include all operation such as cutting, welding, jointing, providing & fixing of MS flanges, fabrication of bends, tees,valves etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The pipes shall be factory galvanized (zinc coating both inside and outside) as per IS:4736 -1986 (with upto date ammendments) with mass of zink coating not less than 360 gm/m2. The welding electrodes shall be as per IS 814:2004 of Advani Oerlikon/ L&T or ISI marked make. Negative tolerance in thickness and mass/weight will not be accepted.Welding and fixing ofM.S. flanges @ 1% of joints, conforming to following tables as per IS 6392-1971 (Latest with up to date amendments) . The welding of flanges should conform to IS 816-1969 with electrodes as per IS: 814-1991 and required number of nuts and bolts conforming to IS 1364, the thicthness of gasket not less than 3.00 mm conforming to IS 2712-1998. The work shall be done as per entire satisfactio of Engineer- in- charge with in all leads and lifts.The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches, flanged joints . The diameter and class / material of pipe are indicative. Since the re-survey and re-design of proposal / scheme is to be carried out by the lowest bidder, the design/drawings are to be approved by the competent .(Refer Vol-III-data sheetNo. 14.0and vol II for technical specification or further details.)
253BOOSTER STAGE PERCOLATION WELL -1:- 125 mm dia GI(P/E) Medium Gradepipe fromRD 0 to 400
254BOOSTER STAGE PERCOLATION WELL -1:- 125 mm dia GI(P/E)Medium Gradepipe fromRD 0 to 120
255Main stage - I of Phase -I:- 150 mm dia GMS (P/E) Heavy Gradepipe fromRD 5600 to 6000
256Main stage - I of Phase - I:- 150 mm dia GMS(P/E)Medium Grade pipe from RD 6000 to 6200
257Main stage - I of Phase - I:- 150 mm dia GMS(P/E)Medium Grade pipe from RD 6200 to 6600
258Main stage - II of Phase - I:- 100 mm dia GMS (P/E)Medium Gradepipe fromRD 4000 to 4400
259Providing, laying,jointing and testing in trenches of Galvanized MSERW / GMS flanged/butt welded pipes including cost of flanged bends of all degrees conforming to IS/ISO:3183-2007 with steel grade L-450 (X-65 )API-5L / L-290 ( X-42 )API-5L /L-390 ( X-56 )API-5Las mentioned below / IS: 1239-1990 (Part-II) having wall thickness as specified below with plain end and capable of withstanding required test pressure in random length of 4 to 7 meters, including specials, short pieces, bends, reducers, tees etc. made from parent tube.The M.S. flanges are to be provided 1% of total joints and remaining 99% joints with butt welded joints as detailedbelow. The MS flanges shall confirm to BIS 6392-1971 (with latest up to date amendments) duly welded in four layers (two inner and two outer) with pipes at both ends as per relevant BIS standards along with nuts and bolts of required sizes confirming to BIS 1364 (with upto date ammendments). 3mm thick compressed asbestos fiber/synthetic rubber gaskets confirming to relevant BIS standards. The laying of pipe shall include all operation such as cutting, welding, jointing, providing & fixing of MS flanges, fabrication of bends, tees,valves etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The pipes shall be factory galvanized (zinc coating both inside and outside) as per IS:4736 -1986 (with upto date ammendments) with mass of zink coating not less than 360 gm/m2. The welding electrodes shall be as per IS 814:2004 of Advani Oerlikon/ L&T or ISI marked make. Negative tolerance in thickness and mass/weight will not be accepted.Welding and fixing ofM.S. flanges @ 1% of joints, conforming to following tables as per IS 6392-1971 (Latest with up to date amendments) . The welding of flanges should conform to IS 816-1969 with electrodes as per IS: 814-1991 and required number of nuts and bolts conforming to IS 1364, the thicthness of gasket not less than 3.00 mm conforming to IS 2712-1998. The work shall be done as per entire satisfactio of Engineer- in- charge with in all leads and lifts.The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches, flanged joints . The diameter and class / material of pipe are indicative. Since the re-survey and re-design of proposal / scheme is to be carried out by the lowest bidder, the design/drawings are to be approved by the competent authority of the department. If there is anyvariation in size, material, class & wall thickness of pipe and jointing,valves,specials etc,the rates shall be worked out on prorata basis and will be paid accordingly(Refer Vol-III-data sheetNo. 14.0and vol II for technical specification or further details.)
260Main stage - I of Phase -I :- Providing and laying 150 mm dia X-65pipe 5.2 mm wall thickness in Rising Main fromkm from RD 0 to 800 tormt. = 800 rmt.
261Main stage - I of Phase -I :- Providing and laying 150 mm dia X-65pipe 4.8 mm wall thickness in Rising Main fromkm from RD 800 to 2600 tormt. = 1800 rmt.
262Main stage - I of Phase -I :- Providing and laying 150 mm dia X-65pipe 4.8 mm wall thickness in Rising Main fromkm from RD 2600 to 5200 tormt. = 2600 rmt.
263Main stage - I of Phase -I :- Providing and laying 150 mm dia X-65pipe 4.8 mm wall thickness in Rising Main fromkm from RD 5200 to 5600 tormt. = 400 rmt.
264Main stage - II of Phase -I :- Providing and laying 100 mm dia X-56pipe 4.8 mm wall thickness in Rising Main fromkm from RD 0 to 3800 tormt. = 3800 rmt.
265Main stage - II of Phase -I :- Providing and laying 100 mm dia X-56pipe 4.8 mm wall thickness in Rising Main fromkm from RD 3800 to 4000 tormt. = 200 rmt.
266Main stage - I of Phase -II :- Providing and laying 65 mm dia X-42pipe 4.8 mm wall thickness in Rising Main fromkm from RD 0 to 2400 tormt. = 2400 rmt.
267Main stage - II of Phase -II :- Providing and laying 125 mm dia X-65pipe 7.9 mm wall thickness in Rising Main fromkm from RD 0 to 200 tormt. = 200 rmt.
268Main stage - II of Phase -II :- Providing and laying 125 mm dia X-65pipe 6.6 mm wall thickness in Rising Main fromkm from RD 200 to 800 tormt. = 600 rmt.
269Main stage - II of Phase -II :- Providing and laying 125 mm dia X-65pipe 5.6 mm wall thickness in Rising Main fromkm from RD 800 to 1400 tormt. = 600 rmt.
270Main stage - II of Phase -II :- Providing and laying 125 mm dia X-65pipe 4.8 mm wall thickness in Rising Main fromkm from RD 1400 to 3400 tormt. = 2000 rmt.
271Providing welding and fixing of M.S. flanges @ 1% of joints, conforming to followingtables as per IS 6392-1971 (Latest with up to date amendments) and welding of MSflanges with GI pipes in three layers i.e two layer on outer faces and one layer on innerfaces to make the joint leak proof (The cost of proving and laying of GI pipes and buttwelded joints to be measured and paid for separtely). The welding of flanges shouldconform to IS 816-1969 with electrodes as per IS: 814-1991 and required number ofnuts and bolts conforming to IS 1364, the thicthness of gasket not less than 3.00 mm conforming to IS 2712-1998. The work shall be done as per entire satisfaction of engineer in charge with in all leads and lifts.(Refer Vol-III-data sheetNo. 14.0and vol II for technical specification or further details.)
272BOOSTER STAGE PERCOLATION WELL -1:- 125 mm dia GI Medium Gradepipe from RD0 to 400Flange Table-5
273BOOSTER STAGE PERCOLATION WELL -1:- 125 mm dia GI Medium Gradepipe from RD 0 to 120Flange Table-5
274Main stage - I of Phase - I:- 150 mm dia X-65 Gradepipe from RD-0 to 800 Flange Table-34
275Main stage - I of Phase - I:- 150 mm dia X-65 Gradepipe from RD-800 to2600 Flange Table-34
276Main stage - I of Phase - I:- 150 mm dia X-65 Gradepipe from RD-2600 to 5200 Flange Table-28
277Main stage - I of Phase - I:- 150 mm dia X-65 Gradepipe from RD- 5200 to 5600Flange Table-17
278Main stage - I of Phase - I:- 150 mm dia GIHeavy Gradepipe from RD-5600- to 6000 Flange Table-17
279Main stage - I of Phase - I:- 150 mm dia GIMedium Gradepipe from RD-6000 to 6200Flange Table-17
280Main stage - I of Phase - I:- 150 mm dia GIMedium Gradepipe from RD-6200 to6600 Flange Table-5
281Main stage - II of Phase - I:- 100 mm dia X-56 Gradepipe from RD-0 to 3800 Flange Table-28
282Main stage - II of Phase - I:- 100 mm dia X-56 Gradepipe from RD-3800 to4000 Flange Table- 17
283Main stage - II of Phase - I:- 100 mm dia GI Medium Gradepipe from RD-4000 to 4400Flange Table-5
284Main stage - I of Phase - II:- 65 mm dia X-42 Gradepipefrom RD-0 to 1000 Flange Table-34
285Main stage - I of Phase - II:- 65 mm dia X-42 Gradepipe from RD-1000 to 2000Flange Table-28
286Main stage - I of Phase - II:- 65 mm dia X-42 Gradepipe from RD-2000 to 2200Flange Table-17
287Main stage - I of Phase - II:- 65 mm dia X-42 Gradepipe from RD-2200 to2400 Flange Table-5
288Main stage - II of Phase - II:- 125 mm dia X-65 Gradepipe from RD-0 to200Flange Table-38
289Main stage - II of Phase - II:-125 mm dia X-65 Grade Gradepipe from RD- 200 to 1400Flange Table-34
290Main stage - II of Phase - II:- 125 mm dia X-65Gradepipe from RD-1400 to 2600 Flange Table-28
291Main stage - II of Phase - II:- 125 mm dia X-65Gradepipe from RD- 2600 to 3000Flange Table-17
292Main stage - II of Phase - II:- 125 mm dia X-65Gradepipe from RD-3000 to 3400Flange Table-5
293Providing and fixing double flanged cast steel reflux valve of following dia of Kirloskar/Leader make conforming to BS:1868 of various Class including campanionsheet gasket 3 mm thick with MS flanges of table-28 as per IS 6392-1971 i/c welding ofM.S. flanges in two layers on both faces to make the joint leak proof and capable of withstanding of nominal seat pressure of 104.00/52.00/21.00 Kg/cm2 with upto dateamendments i/c carriage in all leads & lifts & complete in all respect a as per directionand to the entire satisfaction of Engineer-in-Charge. (Refer Vol-III-data sheetNo. 14.0and vol II for technical specification or further details.)
294BOOSTER STAGE PERCOLATION WELL125 mm dia ASA-150 Flange Table 5
295BOOSTER STAGE PERCOLATION WELL125mm dia ASA-150 Flange Table 5
296Main stage- I Phase -I 1st stage 150 mm dia ASA-600 Flange Table 34
297Main stage- II Phase -I 100 mm dia ASA-300 Flange Table 28
298Main stage- I Phase -II 65 mm dia ASA-600 Flange Table 34
299Main stage- II Phase -II 125 mm dia ASA-600 Flange Table 34
300Providing and fixing double flangedCast steel air release valveof following dia of Leader/Kirloskarmakeconforming to IS: 14845/2000 with up to date amendment as per ClassASA -150to withstand in normalseat pressure of 21.00 Kg/cm2 including champion sheet gasket 3 mm thick, including carriage in all leads and lifts as per direction and to the entiresatisfaction of Engineer-in-Charge.(Refer Vol-III-data sheetNo. 14.0and vol II for technical specification or further details.)
301Main stage- I Phase -I 1st stage 40 mm dia ASA-150
302Main stage- II Phase -I 1st stage 32 mm dia ASA-150
303Main stage- I Phase -II 1st stage 25 mm dia ASA-150
304Main stage- II Phase -II 1st stage 32 mm dia ASA-150
305Schedule A4- Gravity Main & Distribution System:- Excavation in foundations and trenches (for pipes and pits) upto all depths etc. in all kinds of soil such as pick work, jumper work and saturated soil including bailing or pumping out of water, blastingin soft/hard rock or chiselling or wedging out of same where blasting is prohibited in all leads and lifts includingtrimming and dressing of sides, levelling of beds to correct grade including shoring strutting, plankingtimbering and dewatering wherever required, stacking usable and unusable material/soil separately andafter laying jointing and testing of pipes, returning he usable soil in 15 cmlayer by ramming andwatering and then disposing of all surplus excavated soil/unusable material as directed within all leads and lifts including restoration of unmetalled/ mattelledsurfaces to its original condition and including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per the direction of Engineer-in-charge.
306Providing, laying,jointing and testing in trenches of Galvanized GMS pipes by circumferential butt welded pipes with 1% flanges joint in between ( cost of 1% flange joint to be measuredpaidfor seperately ) including cost of bends of all degrees conforming to IS : 1239 -1990 ( PART 2) Having wall thickness as specified below with plain and capable of withstanding required test pressure in random length of 4-7m including special ,short pieces bends , reducer ,tees etc made from parent tube , the MS flanges are to be provided 1% of Total joints and remaining 99% joints with Butt welded as detailed below . The laying of pipe shall including all operation such as cutting, welding , jointing, providing and fixing of MS flanges, fabrication of bend, Tees, valve etc icluding lowering and laying in excavated trenches to ensure Require level including flushing, cleaning and hydrolical testing complete in all respects to the satisfaction of the engineer encharge. the fabricated bends shall have 3or 4 cutts having its radius not less then five time the dia of pipe . The pipe shall be factory galvanised ( Zinc coating both inside and outside ) as per IS 4736-1986 ( With upto ammendments) with mass of Zinc Coating not less then 360 gram/sqm. The welding electrode shall be as IS 814:2004 of Advani ,Oerlikol/L&T or ISI marked make .The work shall be Done as per1% of total joints and remaining 99% joints with butt welded joints as detailedbelow. The MS flanges shall confirm to BIS 6392-1971 (with latest up to date amendments) duly welded in three layers (one inner and two outer) with pipes at both ends as per relevant BIS standards along with nuts and bolts of required sizes confirming to BIS 1364 (with upto date ammendments). 3mm thick compressed asbestos fiber/synthetic rubber gaskets confirming to relevant BIS standards. The laying of pipe shall include all operation such as cutting, welding, jointing, providing & fixing of MS flanges, fabrication of bends, tees,valves etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The pipes shall be factory galvanized (zinc coating both inside and outside) as per IS:4736 -1986 (with upto date ammendments) with mass of zink coating not less than 360 gm/m2. The welding electrodes shall be as per IS 814:2004 of Advani Oerlikon/ L&T or ISI marked make. Negative tolerance in thickness and mass/weight will not be accepted.Welding and fixing ofM.S. flanges @ 1% of joints, conforming to following tables as per IS 6392-1971 (Latest with up to date amendments) . The welding of flanges should conform to IS 816-1969 with electrodes as per IS: 814-1991 and required number of nuts and bolts conforming to IS 1364, the thicthness of gasket not less than 3.00 mm conforming to IS 2712-1998. The work shall be done as per entire satisfactio of Engineer- in- charge with in all leads and lifts.The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches, flanged joints . The diameter and class / material of pipe are indicative. Since the re-survey and re-design of proposal / scheme is to be carried out by the lowest bidder, the design/drawings are to be approved by the competent (Refer Vol-III-data sheetNo. 15.0and vol II for technical specification or further details.)
307Providing and laying 100 mm diaGMS (P/E) Medium class pipe 4.5 mm wall thickness in Gravity Main of Phase-1 fromkm from RD 0 to 200 tormt. = 200 rmt.
308Providing and laying 100 mm diaGMS (P/E) Medium class pipe 4.5 mm wall thickness in Gravity Main of Phase-1 fromkm from RD 200 to 2400 tormt. = 2200 rmt.
309Providing and laying 100 mm diaGMS (P/E) Light class pipe 4.5 mm wall thickness in Gravity Main of Phase-2 fromkm from RD 0 to 180 tormt. = 180 rmt.
310Providing, laying, jointing, testing and commissioning in trenches galvanised mild tube of following dia (medium grade) including providing and fixing tube fitting such as reducer increases, socket, union, tees, bends etc. where ever required (earth work in treanches tobe measured and paid saparately) and as per the direction of Engineer-in-charge including entire carriage of material upto loads and lifts (Refer Vol-III-data sheetNo. 16.0and vol II for technical specification or further details.) distribution
311PHASE-1 :- 32mm dia GI Pipe (medium Grade ) as per IS 1239
31250 mm dia GI Pipe (medium Grade ) as per IS 1239
31365 mm dia GI Pipe (medium Grade ) as per IS 1239
31480 mm dia GI Pipe (medium Grade ) as per IS 1239
315PHASE-2 :- 40 mm dia GI Pipe (medium Grade ) as per IS 1239
31650 mm dia GI Pipe (medium Grade ) as per IS 1239
31765 mm dia GI Pipe (medium Grade ) as per IS 1239
318Providing welding and fixing ofM.S. flanges @ 1% of joints, conforming to following tables as per IS 6392-1971 (Latest with up to date amendments)and welding of MS flanges with GMS/GGMSERW pipes in four layers i.e two layer on outer faces and two layer on inner faces to make the joint leak proof (The cost of proving and laying of GMSERW pipes and butt welded joints to be measured and paid for separtely). The welding of flanges shoild conform to IS 816-1969 with electrodes as per IS: 814-1991 and required number of nuts and bolts conforming to IS 1364, the thicthness of gasket not less than 3.00 mm conforming to IS 2712-1998. The work shall be done as per entire satisfactio of engineer in charge with in all leads and lifts. (Refer Vol-III-data sheetNo. 15.0and vol II for technical specification or further details.)
319Phase-1: Providing and laying 100 mm dia GMS Medium pipe in Gravity mains of Phase-1 from RD-0 to 200Flange Table-5
320Phase-1: Providing and laying 100 mm dia GMS Medium pipe in Gravity mains of Phase-1 from RD-200 to 2400 Flange Table-17
321Providing and fixing double flangedsluice valve of following dia of Kirloskar/Leadermakeconforming to BS:1868 ofvariousClass including campanion sheet gasket 3 mm thick with MS flanges of table-17 as per IS 6392-1971 i/c welding of M.S. flanges in two layers on both faces to make the joint leak proof and capable of with standing of nominal seat pressure of 104.00/52.00/21.00 Kg/cm2 with upto date amendments i/c carriage in all leads & lifts & complete in all respect a as per direction and to the entiresatisfaction of Engineer-in-Charge (Refer Vol-III-data sheetNo. 15.0and vol II for technical specification or further details.)
322100 mm dia. of grade P.N. 1.0
323Schedule A5- Automation:- AUTOMATION: The tendered / firm shall provide proposals for automation (Wired/Non wired) to automize the entire scheme i.efrom intake pointup to MBR . Provision of automation shall be with main SCADA and control station at treatment plant atWater treatment plant. GSM based devices shall be installed at each MBRof every stage in both phaseswhich shall send messages through WEB SCADA stations at two offices and five Mobile Numbers. This data transmission system at each tank of pump station consists of field instruments for providing digital and analog signals to data transfer module. This module will have a communication to web data transfer system module communication. The PLC station will have control station with programmable graphic process, mimics, real time and historical trending face plate and group display, alarm management and report with Laser Jet printers and required furniture. Installation of hardware along with commissioning/ programming as per user requirement shall be done.The firm / contractor will provide the Bulk metering at Water Treatment Plants. The automation of the entire scheme upto Sector storage tank shall also include the followings : (a) At intake point : Provision shall be kept for automatic flow measurement and flow control with quality measurement turbidityin (b) Water Treatment Plant.Fully automatized operation including alum dosing and back washing and chlorinationfrom inlet to out let along with automatic sensor for Turbidity, pHand Residual chlorine) (c) Storage Water Tanks at lifting station:-Automatic Inlet and Out Let through single out flow pipe (common header), Low and high level sensoralong with all required accessories. It should also include telecommunication comprising of required numbers of connections as per actual requirement at site. The automation system installed at above/aforesaid locations should be theft proof and proper ventilation arrangements be made complete in all respect to the entire satisfaction of Engineer-in Charge.The firm/contactor shall submit complete proposal for automation and got approved from competent authority, along with presentation .Firm/Cont. has to incorperate all the inputs and outputs suggested by the Deptt. in the SCADA system to automized the entired scheme from intake point to all sector storage tanks as per relevant(Refer Vol-III-data sheetNo. 17.0and vol II for technical specification or further details.)
324Schedule A6 -Functional House Tap Connection:- Providing and fixing function House Tap connection (FHTC) to 548NosHouse Hold complete in all respect(Refer Vol-III-data sheetNo. 18and vol II for technical specification or further details.)
325Providing and installation of house connections with 15 mm dia GI pipe, 30 Rmtr.(Light class) i/c 80 mm nipple of 15mm dia, GI socket, GI Union , GI elbow and 1/4" ferrule connection as per the direction of Engineer-in-charge including entire carriage of material upto all leads and lifts
326Schedule B1- Operation and Maintenance:- Operation & maintenanceofentire scheme from Intake point to tail end of the scheme in proper workingconditions Rising Mains,Gravity mainsand Distribution system, all structures,,Main Pump houses,,Under ground storage Reservoirs&Nos Over Head StorageReservoir including Yard light, at various sites complete in all respect in proper working condition for a period of 5 years starting after successful testing of scheme for 90 days . O&M includes provision of regular i.e. daily supplying of designed/required quantity of potable water having water quality as per CPHEEO manual of water supplyto the beneficiaries of the scheme upto main storage /delivery tankfrom above mentioned sources i.e. Intake&Storage tanks at different locations as per plan and repair & maintenance of Main lines, Gravity lines and entire distribution system along with maintenance of automised system of scheme. Regular maintenance of all the facilities including cleaning , washing, oiling and greasing repairs, replacement of worn out/damaged parts of pumping machinery, pipe line, valves and electrical, Mechanical equipments, regular cleaning of all structure like Storage tanks, collection/distribution chambers,pump houses etc and disposal of same as per the direction of Engineer-in-charge, fixing/repairing leakage incivil structures, channels, pipe lines, pumping machinery etc. proper disinfection of treated water and regular testing of water samples at required stages of treatment and lift, keeping regular and proper record of water quantity and quality, time and hour of runof pumping machinery, repair and maintenance of all works,removal of all kind of slips, slush, up rooting of unwanted grass, shrubs, weeds etc. growing near the structures and keeping the area neat and clean to the entire satisfaction of Engineer-in-Charge, planting and maintaining plants/flowers/trees around the pump house, WTP ,Main & Sector storage tanks / Intake etc. as per the entire satisfaction of Engineer-in-Charge including the cost of procurement of adequate and proper tools and plants, skilled and unskilled manpower, spare parts, oil/grease/lubricants, chemicals (Except bleaching powder) instruments, equipments, stationery and any other material etc. required for O&M excluding the cost of energy charges. All the operation shall be carried out as per the CPHEEO manual on water supply and treatment (latest addition) HP PWD/IPH specification,directions issued by Engineer-in-Charge from time to time and sound Engineering practice. The chlorine gas shall be provided by the contractor itself .(Refer Vol-III-data sheetNo. 9.0and vol II for technical specification or further details.) (Refer Vol-III-data sheetNo. 19.0and vol II for technical specification or further details.)
3271st year (2024)
3282nd year (2025)
3293rd year( 2026)
3304th year (2027)
3315th year (2028)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail