}

Ph Sub Division Ranni Rebuild Kerala Initiative Automation Of Vertical Turbine Pumps In Kerala Water Authority Implementation Of Phase-1 Ph Sub Division Ranni Rebuild Kerala Initiative Automation Of Vertical Turbine Pumps In Kerala Water Authority Impleme, Pathanamthitta-Kerala

Kerala Water Authority-KWA has published Ph Sub Division Ranni Rebuild Kerala Initiative Automation Of Vertical Turbine Pumps In Kerala Water Authority Implementation Of Phase-1 Ph Sub Division Ranni Rebuild Kerala Initiative Automation Of Vertical Turbine Pumps In Kerala Water Authority Impleme. Submission Date for this Tender is 29-07-2022. Pump Supply Tenders in Pathanamthitta Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

33229913
Ph Sub Division Ranni Rebuild Kerala Initiative Automation Of Vertical Turbine Pumps In Kerala Water Authority Implementation Of Phase-1 Ph Sub Division Ranni Rebuild Kerala Initiative Automation Of Vertical Turbine Pumps In Kerala Water Authority Impleme
Open Tender
Indian
Kerala
Pathanamthitta
29-07-2022

Tender Details

Ph Sub Division Ranni Rebuild Kerala Initiative Automation Of Vertical Turbine Pumps In Kerala Water Authority Implementation Of Phase-1 Ph Sub Division Ranni Rebuild Kerala Initiative Automation Of Vertical Turbine Pumps In Kerala Water Authority Implementation Of Phase-1

Key Value

Document Fees
INR 2500 /-
EMD
INR 44500.0 /-
Tender Value
INR 17.79 Lakhs /-

BOQ Items

Name of Work:PH-Sub-Division,Ranni-Rebuild Kerala Initiative-Automation of vertical Turbine pumps in Kerala Water Authority -(Implementation of Phase-1)
Sl. No. Item Description
1Working charges-Supplying andinstalling -Automation of VT pump sets
2Supply, installation, trial run and commissioning of Control Module for remote operation of VT pump sets are required to automate the start, stop, monitor the operation of VT pump taking care of protection features in situation like over voltage, under voltage, phase changes, single phasing, overload and situations like impeller jam, air lock, foot valve blocked ,sump dry. Proposed Automation system shall be designed, manufactured, installed and tested to ensure the high standards of operational reliability. Instruments mounted in field and on panels shall be suitable for continuous operation. All electronic components shall be adequately rated and circuits shall be designed so that change of component characteristics shall not affect pump operation.The system should suit for different type of starters like VFD, Soft starter, FCMA, Star-Delta etc transformers. The added system shall not interfere with the working of starters negatively and should be of externally fitting type. The communication shall be based on GSM and remote operation communication; system status communication should be made available for at least 2 users. The system may communicate the status including the number of pumps in operation under an office, running hours, idling time, error logs etc. The system should have a replacement warranty of 5 years against normal machine faults, power flash, memory flash, surge failure, lighting surge failure, harmonic failure etc. Scope of the works includes supply, installation,commissioning & testing of automation system for pump houses and real time monitoring of the working of pumps without resorting to any manual methods. Proposed Automation system shall be designed, manufactured, installed and tested to ensure the high standards of operational reliability. Control the pump (ON/OFF) from local panel as well as remotely. Pump can be programmed to start if water is below a set level and turned off if reached to set level. The pump can also be operated on fixed time basis daily, or in other words pumping hours canbe set according to demand 24X7. In case of over current, Phase change and under voltage/overvoltage the pump can be turned off. Monitor the pumping time Monitor the Voltage, current. Themotor operation should be compatible on all mobile phone platforms, even from normal phone or land phone and with semi-automatic star delta. The control module should have the features like high –voltage isolation, high-voltage cut off ,machine surge protection ,software security provision, real time motor parameters without SMS or GPRS through IVRS, dynamic power fault correction, automatic reset facility, starter interlock facility, local HMI with exact error display for local troubleshooting, live local motor parameters display with at least 3 second refresh rate, non-bypasses’ of manual ON- OFF button, dynamic water hammer stabilization,dynamic configuration facility 3 phases individual input rated fast blown replaceable fuse control, rated fast blown replaceable fuse control for machine board protection, motor or starter power or technology up gradation facility or compatibility ,true manual mode, manual Emergency off provision, auto-Manuel mode interlocks facility, etc. o Trial run should be conducted in presence of Assistant Engineer. Requisite safety precautions should be taken before trial run so as prevent damages to Pump/Motor/Starter. viii. Trouble shooting and Operation of the system should be elaborated to the Operating staff. The work should have a warranty of 5 years.
3Note:GST @ 18 % should be paid additionally
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail