| 1 | 1. Providing for Fencing Arrangements, Pipeline Collection Tank to the New Oottachathu Nursery at Kadukkakadu in Mullankurichi Panchayat |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 3 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 4 | C.C. 1:2:4 mix using 20mm HBG metalincluding cost and conveyance of all materials to work site and all labour charges etc.complete |
| 5 | Supply and fixing of Cutstone Pillar including cost and conveyance of all labour charges etc |
| 6 | Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x 10 gauge of best approved quality including cost and conveyance of all charges etc. |
| 7 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 8 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 9 | Filling with m- sand including cost and conveyance of sand to worksite including all labour chargesfor filling etc complete |
| 10 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 11 | Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete |
| 12 | Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete. |
| 13 | Earth work excavation in all soils with initial lead of 10m and lift of 2 M |
| 14 | Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes |
| 15 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipesincluding lock arrangement with enamel paint two coats etc |
| 16 | Refilling exavated earth soil inculding all cost and conveyance etc. complete. |
| 17 | 2. Providing for Fencing Arrangements, Pipeline Collection Tank to the New Oottachathu Nursery at Mankottai VPSC near in Mankottai Panchayat |
| 18 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 19 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 20 | C.C. 1:2:4 mix using 20mm HBG metalincluding cost and conveyance of all materials to work site and all labour charges etc.complete |
| 21 | Supply and fixing of Cutstone Pillar including cost and conveyance of all labour charges etc |
| 22 | Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x 10 gauge of best approved quality including cost and conveyance of all charges etc. |
| 23 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 24 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 25 | Filling with m- sand including cost and conveyance of sand to worksite including all labour chargesfor filling etc complete |
| 26 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 27 | Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete |
| 28 | Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete. |
| 29 | Earth work excavation in all soils with initial lead of 10m and lift of 2 M |
| 30 | Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes |
| 31 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipesincluding lock arrangement with enamel paint two coats etc |
| 32 | Refilling exavated earth soil inculding all cost and conveyance etc. complete. |
| 33 | 3. Providing for Fencing Arrangements, Pipeline Collection Tank to the New Oottachathu Nursery at Malaiyathamankovil near in Pilaviduthi Panchayat |
| 34 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 35 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 36 | C.C. 1:2:4 mix using 20mm HBG metalincluding cost and conveyance of all materials to work site and all labour charges etc.complete |
| 37 | Supply and fixing of Cutstone Pillar including cost and conveyance of all labour charges etc |
| 38 | Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x 10 gauge of best approved quality including cost and conveyance of all charges etc. |
| 39 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 40 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 41 | Filling with m- sand including cost and conveyance of sand to worksite including all labour chargesfor filling etc complete |
| 42 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 43 | Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete |
| 44 | Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete. |
| 45 | Earth work excavation in all soils with initial lead of 10m and lift of 2 M |
| 46 | Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes |
| 47 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipesincluding lock arrangement with enamel paint two coats etc |
| 48 | Refilling exavated earth soil inculding all cost and conveyance etc. complete. |
| 49 | 4. Providing for Fencing Arrangements, Pipeline Collection Tank to the New Oottachathu Nursery at Ariyandi OHT near in Malaiyur Panchayat |
| 50 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 51 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 52 | C.C. 1:2:4 mix using 20mm HBG metalincluding cost and conveyance of all materials to work site and all labour charges etc.complete |
| 53 | Supply and fixing of Cutstone Pillar including cost and conveyance of all labour charges etc |
| 54 | Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x 10 gauge of best approved quality including cost and conveyance of all charges etc. |
| 55 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 56 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 57 | Filling with m- sand including cost and conveyance of sand to worksite including all labour chargesfor filling etc complete |
| 58 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 59 | Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete |
| 60 | Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete. |
| 61 | Earth work excavation in all soils with initial lead of 10m and lift of 2 M |
| 62 | Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes |
| 63 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipesincluding lock arrangement with enamel paint two coats etc |
| 64 | Refilling exavated earth soil inculding all cost and conveyance etc. complete. |
| 65 | 5. Providing for Fencing Arrangements, Pipeline Collection Tank to the New Oottachathu Nursery at Vandanviduthi PUES near in Vandanviduthi Panchayat |
| 66 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 67 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 68 | C.C. 1:2:4 mix using 20mm HBG metalincluding cost and conveyance of all materials to work site and all labour charges etc.complete |
| 69 | Supply and fixing of Cutstone Pillar including cost and conveyance of all labour charges etc |
| 70 | Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x 10 gauge of best approved quality including cost and conveyance of all charges etc. |
| 71 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 72 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 73 | Filling with m- sand including cost and conveyance of sand to worksite including all labour chargesfor filling etc complete |
| 74 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 75 | Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete |
| 76 | Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete. |
| 77 | Earth work excavation in all soils with initial lead of 10m and lift of 2 M |
| 78 | Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes |
| 79 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipesincluding lock arrangement with enamel paint two coats etc |
| 80 | Refilling exavated earth soil inculding all cost and conveyance etc. complete. |
| 81 | 6. Providing for Fencing Arrangements, Pipeline Collection Tank to the New Oottachathu Nursery at S.Kalabam Pallavankulam near in Kalabam Panchayat |
| 82 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 83 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 84 | C.C. 1:2:4 mix using 20mm HBG metalincluding cost and conveyance of all materials to work site and all labour charges etc.complete |
| 85 | Supply and fixing of Cutstone Pillar including cost and conveyance of all labour charges etc |
| 86 | Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x 10 gauge of best approved quality including cost and conveyance of all charges etc. |
| 87 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 88 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 89 | Filling with m- sand including cost and conveyance of sand to worksite including all labour chargesfor filling etc complete |
| 90 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 91 | Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete |
| 92 | Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete. |
| 93 | Earth work excavation in all soils with initial lead of 10m and lift of 2 M |
| 94 | Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes |
| 95 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipesincluding lock arrangement with enamel paint two coats etc |
| 96 | Refilling exavated earth soil inculding all cost and conveyance etc. complete. |
| 97 | 7.Providing for Fencing Arrangements, Pipeline Collection Tank to the New Oottachathu Nursery at Erungalanviduthi Mylakulam near in Odappaviduthi Panchayat |
| 98 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 99 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 100 | C.C. 1:2:4 mix using 20mm HBG metalincluding cost and conveyance of all materials to work site and all labour charges etc.complete |
| 101 | Supply and fixing of Cutstone Pillar including cost and conveyance of all labour charges etc |
| 102 | Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x 10 gauge of best approved quality including cost and conveyance of all charges etc. |
| 103 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 104 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 105 | Filling with m- sand including cost and conveyance of sand to worksite including all labour chargesfor filling etc complete |
| 106 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 107 | Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete |
| 108 | Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete. |
| 109 | Earth work excavation in all soils with initial lead of 10m and lift of 2 M |
| 110 | Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes |
| 111 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipesincluding lock arrangement with enamel paint two coats etc |
| 112 | Refilling exavated earth soil inculding all cost and conveyance etc. complete. |
| 113 | 8. Providing for Fencing Arrangements, Pipeline Collection Tank to the New Oottachathu Nursery at Vadatheru Veeraiah Kovil near in Vadatheru Panchayat |
| 114 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 115 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 116 | C.C. 1:2:4 mix using 20mm HBG metalincluding cost and conveyance of all materials to work site and all labour charges etc.complete |
| 117 | Supply and fixing of Cutstone Pillar including cost and conveyance of all labour charges etc |
| 118 | Supply and fixing of chain linked fencing with chain links of 10cm x 10cm x 10 gauge of best approved quality including cost and conveyance of all charges etc. |
| 119 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 120 | Cement concrete 1:4:8 mix using 40mm HBG metalincluding cost and conveyance of all materials to site including all labour charges for filling etc complete |
| 121 | Filling with m- sand including cost and conveyance of sand to worksite including all labour chargesfor filling etc complete |
| 122 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 123 | Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete |
| 124 | Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete. |
| 125 | Earth work excavation in all soils with initial lead of 10m and lift of 2 M |
| 126 | Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes |
| 127 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipesincluding lock arrangement with enamel paint two coats etc |
| 128 | Refilling exavated earth soil inculding all cost and conveyance etc. complete. |
| 129 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |