Rfp For The Supply Of Physical Vapour Deposition System Pvd With All Required Accessories Rfp For The Supply Of Physical Vapour Deposition System Pvd With All Required Accessories , Supply, Installation, Commissioning, Testing, Calibration, User Tra
Tender Overview
Project Description
Rfp For The Supply Of Physical Vapour Deposition System Pvd With All Required Accessories Rfp For The Supply Of Physical Vapour Deposition System Pvd With All Required Accessories , Supply, Installation, Commissioning, Testing, Calibration, User Training Of Fully Automated Computer Controlled Latest / Advanced Technologies Based Software Operated Physical Vapour Deposition System [ Pvd ] Including Warranty And Comprehensive Maintenance For 3 Years As Specified In The Bid Document , Supply, Installation, Commissioning, Testing, Calibration, User Training Of Fully Automated Computer Controlled Latest / Advanced Technologies Based Software Operated Physical Vapour Deposition System [ Pvd ] , Warranty And Comprehensive Maintenance For 1St Year , Warranty And Comprehensive Maintenance For 2Nd Year , Warranty And Comprehensive Maintenance For 3Rd Year , Comprehensive Maintenance For 2 Years Of Fully Automated Computer Controlled Latest / Advanced Technologies Based Software Operated Physical Vapour Deposition System [ Pvd ] As Specified In The Bid Document , Comprehensive Maintenance For 4Th Year , Comprehensive Maintenance For 5Th Year , Gst , Cgst , Sgst
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-Aug-2022 | MHSC/MSCL-2022-23/ Physical Vapour Deposition | Other | 04-Aug-2022 |
| 2 | 03-Aug-2022 | MHSC/MSCL-2022-23/ Physical Vapour Deposition | Date | 10-Aug-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Supply, Installation, Commissioning, Testing, Calibration, user training of fully automated computer controlled Latest / Advanced Technologies based Software Operated Physical Vapour Deposition System [PVD] including Warranty and Comprehensive Maintenance for 3 Years as specified in the Bid Document |
| 2 | Supply, Installation, Commissioning, Testing, Calibration, user training of fully automated computer controlled Latest / Advanced Technologies based Software Operated Physical Vapour Deposition System [PVD] |
| 3 | Warranty and Comprehensive Maintenance for 1st Year |
| 4 | Warranty and Comprehensive Maintenance for 2nd Year |
| 5 | Warranty and Comprehensive Maintenance for 3rd Year |
| 6 | Comprehensive Maintenance for 2 Years of fully automated computer controlled Latest / Advanced Technologies based Software Operated Physical Vapour Deposition System [PVD] as specified in the Bid Document |
| 7 | Comprehensive Maintenance for 4th Year |
| 8 | Comprehensive Maintenance for 5th Year |
| 9 | GST |
| 10 | CGST |
| 11 | SGST |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender