Sisai Town :- Augmentation Of Water Supply Scheme Sisai Town Distt. Hisar.Sisai Bolan :- Augmentation Of Water Supply Scheme Sisai Bolan Distt. Hisar, Const. Of Rcc Open Inlet Channel, 1 No. Bricks Lining S / S Tank, 1 No. Rcc R / W S / S Well, 2.50 M
Tender Overview
Project Description
Sisai Town :- Augmentation Of Water Supply Scheme Sisai Town Distt. Hisar.Sisai Bolan :- Augmentation Of Water Supply Scheme Sisai Bolan Distt. Hisar, Const. Of Rcc Open Inlet Channel, 1 No. Bricks Lining S / S Tank, 1 No. Rcc R / W S / S Well, 2.50 Mld Wtp, 2 No. Rcc Clear Water Tank, Boundary Wall, Interlocking Path At Head Works, 1 Rcc Ugct At B / Stn No. 1, 1 Rcc Ugct At B / Stn No. 2, Sv Hodies, Laying Of Pipe Line At W / W & Boosting Stations, Laying Of Distribution System, Prov. & Fixing Pumping Machinery, 200 Kva Transformer, 200 Kva Generating Set, Electrical Panel, Ci Df / Pe Specials, Testing Commissioning Of All Structures And Installations, Operation And Maintenance Of Water Works Including All Component As Per Schedule -Iv For 12 Months During Defect Liability Period After Trial Run Period Of 3 Months And 5 Years Thereafter And All Other Works Contingent There To. Sisai Kalirawan :- Augmentation Of Water Supply Scheme Sisai Kalirawan Distt. Hisar, Const. Of Rcc Open Inlet Channel, 1 No. Bricks Lining S / S Tank, 1 No. Rcc R / W S / S Well, 2.50 Mld Wtp, 2 No. Rcc Clear Water Tank, Boundary Wall, Interlocking Path At Head Works, 1 Rcc Ugct At B / Stn No. 1, 1 Rcc Ugct At B / Stn No. 2, Sv Hodies, Laying Of Pipe Line / Rising Main At W / W & Boosting Station, Repair Of Boosting Stations, Laying Of Distribution System, Prov. & Fixing 150 Kva Transformer, 160 Kva Generating Set, P / F Electrical Panel, Ci Df / Pe Specials, Testing Commissioning Of All Structures And Installations, Operation And Maintenance Of Water Works Including All Componentas Per Schedule -Iv For For 12 Months During Defect Liability Period After Trial Run Period Of 3 Months And 5 Years Thereafter And All Other Works Contingent There To.
BOQ
| Sl. No. | Item Description |
| 1 | Sisai Bolan Recovery of old bricks |
| 2 | Design construction, testing & commissioning of 2.50 MLD capacity Water Treatment Plant including inlet channel, Alum dozing Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, Pumping machineries and electric cabling. Control panels entire piping network of suitable size, laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT. & Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house include chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (Sluice valves of make VCNAG). / WTP (WATER TREATMENT PLANT) SCADA BASE including 5 years O&M after 1 year DLP & 3 months of sucessful trial run period |
| 3 | Supplying, erection, testing and commissioning or Horizontal motor pumping set of raw water having head 12.00 m as requirements of discharge in LPM and power capacity in BHP Make: KSEB, CRI, Kirlosker, Crompton Greeve, Lubi) including O & M1700 LPM 10.00 BHP 12 mtr. head |
| 4 | Supply, erection, testing and commissioning of wall mounted electrical panel board, fabricated from 16 SWG CRCA sheet duly grouted with suitable angle iron frame and completely powder coated of approximate size 600x1200mm and 400mm deep having following accessories :- including O & MA) At Water Works :-For 2 No. Raw water Pumping Set of 1700 LPMx 12mtr. head(a) Main switch 63 Amp. 2 Nos.. (L & T Siemens, ABB).(b) CT 100/3 Nos. (AE/KAPPA/ L&T) (c) Digital Multi Function meter = 1 no. (d) SPP 1 No.of approved make(e) Motor starter, star delta 2 Nos. for 1700 LPM x 12 M Head Motor (L&T Simens, AAB) (f) VSS 1 No.& ASS 3 No. of approved make (g) Capacity KVAR as per site requirement = 1 No.(h) Indicating Lamp-One Set(i) Change over switch 63 Amp. = 1 No. each |
| 5 | B) At Water Works :-For 2 No. Clear water Pumping Set of 1100 LPMx 40mtr. head(a) Main switch 63 Amp. 2 Nos.. (L & T Siemens, ABB).(b) CT 100/3 Nos. (AE/KAPPA/ L&T) (c) Digital Multi Function meter = 1 no. (d) SPP 1 No.of approved make(e) Motor starter, star delta 2 Nos. for 1100 LPM x 40 M Head Motor (L&T Simens, AAB) (f) VSS 1 No.& ASS 3 No. of approved make (g) Capacity KVAR as per site requirement = 1 No.(h) Indicating Lamp-One Set(i) Change over switch 63 Amp. = 1 No. each |
| 6 | Sisai Kalirawan 1. Recovery of old bricks |
| 7 | 2. Recovery of old dismentaled 400 mm i/d RCC NP2 pipe |
| 8 | 3. Design construction, testing & commissioning of 2.50 MLD capacity Water Treatment Plant including inlet channel, Alum dozing Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, Pumping machineries and electric cabling. Control panels entire piping network of suitable size, laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT. & Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house include chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (Sluice valves of make VCNAG). / WTP (WATER TREATMENT PLANT) SCADA BASE including 5 years O&M after 1 year DLP & 3 months of successful trial run period |
| 9 | 4. Supply, erection, testing and commissioning of wall mounted electrical panel board, fabricated from 16 SWG CRCA sheet duly grouted with suitable angle iron frame and completely powder coated of approximate size 600x1200mm and 400mm deep having following accessories :- including O & MA) At Water Works :-For 2 No. Clear water Pumping Set of 1500 LPMx 30mtr. head(a) Main switch 63 Amp. 2 Nos.. (L & T Siemens, ABB).(b) CT 100/3 Nos. (AE/KAPPA/ L&T) (c) Digital Multi Function meter = 1 no. (d) SPP 1 No.of approved make(e) Motor starter, star delta 2 Nos. for 1500 LPM x 30M Head Motor (L&T Simens, AAB) (f) VSS 1 No.& ASS 3 No. of approved make (g) Capacity KVAR as per site requirement = 1 No.(h) Indicating Lamp-One Set(i) Change over switch 63 Amp. = 1 No. each |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender