}

Re-Construction Of Damaged Security Wall Dismantling And Removing The Existing Damaged Brick / Rr Masonry Wall In Cement Mortar Clearing Away The Debris And Carefully Stacking Materials Useful For Reuse With In A Lead Of 150M Etc. Complete As Per Standard, Chavara-Kerala

Indian Rare Earths Limited has published Re-Construction Of Damaged Security Wall Dismantling And Removing The Existing Damaged Brick / Rr Masonry Wall In Cement Mortar Clearing Away The Debris And Carefully Stacking Materials Useful For Reuse With In A Lead Of 150M Etc. Complete As Per Standard. Submission Date for this Tender is 10-08-2022. Coats and Jackets Tenders in Chavara Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

33174211
Re-Construction Of Damaged Security Wall Dismantling And Removing The Existing Damaged Brick / Rr Masonry Wall In Cement Mortar Clearing Away The Debris And Carefully Stacking Materials Useful For Reuse With In A Lead Of 150M Etc. Complete As Per Standard
Tender
Indian
Kerala
Chavara
10-08-2022

Tender Details

Re-Construction Of Damaged Security Wall Dismantling And Removing The Existing Damaged Brick / Rr Masonry Wall In Cement Mortar Clearing Away The Debris And Carefully Stacking Materials Useful For Reuse With In A Lead Of 150M Etc. Complete As Per Standard Specification 2 2 Re-Construction Of Damaged Security Wall Earthwork Excavation In Ordinary Soil For Foundation And Depositing The Spoiled Earth Within Initial Lead Up To 50M And Lift Upon 1.50 M Refilling After The Work Etc. Complete As Per Standard Specification. 3 3 Re-Construction Of Damaged Security Wall Reinforced Cement Concrete 1:2:4 Using 20Mm Hard Broken Stone For Plinth Beam, Retaining Wall Lintel Etc. Including Cost & Conveyance Of All Materials Hire Charges For Shuttering, Labour Charges For Boxing, Mixing, Placing, Ramming, Watering, Curing Etc. Complete As Per Standard Specification But Excluding Cost Of Cement & Ms Reinforcement. 4 4 Re-Construction Of Damaged Security Wall Ms Reinforcement Bent , Tied And Placed In Position For All Rcc Works Including All Cost And Conveyance Of Ms Bars, Binding Wires, All Labour Charges, Loading / Unloading Charges Etc. Complete As Per Standard Specification. 5 5 Re-Construction Of Damaged Security Wall Brick Work In Cm 1:6 Using First Class Wire Cut Bricks Of Standard Size Including All Cost And Conveyance Of Materials, All Labour Charges Hire Charges For All Tools And Plants, Providing Necessary Scaffolding With Contractors Materials, Watering Curing Etc. Complete As Per Standard Specification But Excluding Cost Of Cement 6 6 Re-Construction Of Damaged Security Wall Plastering In Cement Mortar 1:4, 15Mm Thick One Coat At All Height And Levels Floated Hard And Trowelled Smooth Including All Cost And Conveyance Of Materials, All Labour Charges Hire Charges For Tools And Plants, Providing Necessary Scaffolding With Contractors Materials Curing, Etc. Complete As Per Standard Specification But Excluding Cost Of Cement 7 7 Re-Construction Of Damaged Security Wall Glass Coping With Glass Chips In Cm 1:4 Including All Cost And Conveyance Of Materials, All Labour Charges Etc. Complete As Per Standard Specification But Excluding Cost Of Cement. 8 8 Re-Construction Of Damaged Security Wall Painting The Wall With Approved Quality And Colour Water Proof Paint One Coat Wall Primer And Over Two Coat Of Exterior Emulsion At All Heights And Levels Including All Cost And Conveyance Of Materials, All Labour Charges, Hire Charges For Tools And Plants, Providing Scaffolding With Contractors Materials Etc. Complete As Per Standard Specification. ( Paint Shall Be Asian / Berger / Ici Dulex ) 9 9 Re-Construction Of Damaged Security Wall Sundry And Petty Works Such As Dismantling The Existing Temporary Fencing And Relocating It, Clearing The Debris, Clearing The Side After Completing The Work. 10 10 Re-Construction Of Damaged Security Wall Supplying And Stacking Isi Mark Best Quality Portland Cement ( Opc / Ppc ) Approved Make Including All Cost And Conveyance Of Materials, Loading And Unloading Charges Etc. Complete ( Payment Will Be Made Only For Actual Quantity Of Cement Consumed )

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail